Page 1
Fire Rated Drywall Box Assembly Instructions for EF39FRBE | EF61FRBE...
Page 2
Parts/Contents: EF39FRBE Part A: Plywood/Drywall sidewalls x 2 Part B: Plywood/Drywall end walls x 1 Part C: Plywood/Drywall end walls x 1 Part D: Drywall top x1 • Junction box and cover plate x 1 • L-brackets x 4 • 5/8” screws x 12 (eight screws for L brackets – four screws for the junction box) •...
Page 3
Unpack Contents Verify Components. Layout all drywall parts (A, A, B, C, D). Assemble box side walls (parts A, A, B, C) using included 1 ¼” screws and pilot holes.
Page 4
Place drywall top (part D) in place. For 39” Drywall box: Place one L bracket on each corner. For 61” Drywall box: Place one L bracket on each corner and one on each of the long side. Using the included 5/8” screws attach the L brackets to the plywood side walls only.