Assembly Guide
Scan the QR code for the
Full Manual & Assembly Video
Follow the assembly steps below:
01
Option A
2
Direction of Door Swing
Choose which direction you would like the doors to open: Option A (left handles) or Option B (right
handles).
Position door panels so that the handles are on the OPPOSITE SIDE of your selected direction (In the first
few assembly steps the crate will be upside-down. When you flip the crate over the door handles will be in
the orientation you've selected)
03
5
Place the base frame on top of side
panels with the notched side facing
DOWN. Locate the bottom corner
connectors.
06
Flip crate so bottom feet are on the
floor, preferably with two people.
09
7
Place the ceiling panel on top of the
side panels with the DIGGS logo
facing UP.
Please note that assembly should take 20 minutes max. If you're struggling or
!
it's taking longer than expected, please reach out to help@diggs.pet or text us at
1-833-802-0537 with your questions and any visuals that will allow us to
troubleshoot your concern.
Option B
1
1
Direction of Door Swing
04
8
Bottom Corner Connectors: Rotate the outer knob to
the open position, hold the panels together and place the
corner connector over frame intersection, press firmly and
rotate clockwise to lock.
07
6
Insert tray through the opening where the ceiling will
be installed; it nests within the notch in the bottom
frame.
10
9
Top Corner Connectors: Locate the top corner connectors,
rotate the outer knob to the open position. Hold the
panels together and place the corner connector over frame
intersection, press firmly, and rotate clockwise to lock.
02
1
2
The doors and side panels slide together with post
and hole connectors.
Starting with the front and side door, slide the post
and hole connectors together, and repeat the
process to connect the remaining side panels.
05
Check inside to ensure frames are captured. Repeat
for the remaining 3 corners, checking connections.
08
10
Puppy Divider Installation (If needed): Insert divider
feet into base holes based on dog size. Align the top
pins with corresponding frame holes, and slide the
pins into the hole until they snap into place.
11
Check inside to ensure frames are captured.
Repeat for the remaining 3 corners, checking
connections.
2
3
1
8
9
4
2
Need help?
Do you have a question about the Evolv and is the answer not in the manual?
Questions and answers