Summary of Contents for HANCHU ESS HESS-Gateway-M1

  • Page 2: Installation Precautions

    1.Installation Precautions Please follow the equipment installation steps process to ensure the equipment can be successfully installed. Flow chart of installation steps: Read Check Tool Install Connect Equipment Installation Packing List Preparation Gateway Power Cable Debug This system should only be installed by personnel with training and adequate knowledge of electrical power systems. Please ensure that the installer meets the following requirements: ...
  • Page 3 The definition of each interface must be clear during the installation process, otherwise the wrong connection will lead to installation failure or even damage to Schematic diagram of gateway interface: the equipment.
  • Page 4: Check The Packing List

    2.Check the Packing List Please refer to the packing items shown below, please check the packing list carefully, if any items are missing, please contact your dealer directly. Expansion bolt * 5 Gateway Wall mount bracket Screws and termina/ Quick Installation Guide Keys M4*10/OT6-4/M4*14×2...
  • Page 5: Tool Preparation

    3.Tool preparation Step 1 : Protective equipment products must be worn and maintained during the installation process. Step 2 : Installation Tools: tools needed in the process of installing equipment, more effective to improve installation efficiency. Phillips screw driver Torque screw driver Hammer 锤子...
  • Page 6: Gateway Installation

    4.Gateway Installation Before you start connecting cables, make sure that gateway and the equipment is fully switched off! Make sure the wall is strong enough to bear the weight of the gateway. Use the bracket as a template to make Fix the expansion tubes into the holes, pull There is a hook design on the back of the Step 1: Locate drill holes in the wall...
  • Page 7: Power Cable Connection

    5.Power cable connection 1. Before operation, please make sure all power supplies to the equipment have been disconnected, including but not limited to the grid side and inverter power Installation Preparation: switches. 2. Using the key to open the equipment door. 3.
  • Page 8 6. Equipment Debugging Step 1 :Check if the gateway is firmly installed, check if the components and terminals inside the gateway are tightened without any loosen part. Step 2 :Check all wires and cables are connected properly. Check if the L and N lines are connected properly. Step 3 :After checking the cables, tighten the waterproof socket connector under the gateway to prevent insects and steam from going in.