Table of Contents

Advertisement

Quick Links

PC30 operating instructions
PC30 operating instructions
version 2024
Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PC30 and is the answer not in the manual?

Questions and answers

Summary of Contents for MASPRA PC30

  • Page 1 PC30 operating instructions PC30 operating instructions version 2024 Page 1...
  • Page 2: Ec Declaration Of Conformity

    PC30 operating instructions EC declaration of conformity In accordance with EC Directive 2006/42/EC on machinery Name and address of the manufacturer: Gemini GmbH, Rheinstraße 7, 88046 Friedrichshafen Tel. +49 7541 98156-15, Fax: +49 7541 98156-20 This declaration refers only to the machinery in the condition in which it was placed on the market; it does not take into account any parts fitted and/or subsequent interventions carried out by the end user.
  • Page 3: Table Of Contents

    3.3 Material container 3.4 engine 3.5 Noise emissions 3.6 Operating conditions 4 Structure and function ....................................9 4.1 Scope of delivery peristaltic pump PC30 4.2 Functionality 4.3 Assemblies 4.3.1 Description of the modules 4.3.1.1 Material container 4.3.1.2 Basic unit including motor, pump housing and control 4.4 Displays and controls...
  • Page 4 PC30 operating instructions 4.7 Spare parts and illustrations transport and storage 5.1 Safety instructions for transport 5.2 Transport inspection 5.3 Damage report 5.4 Complaints 5.5 Packaging 5.6 Transport of the used machine in the vehicle 5.7 Storage 6 Installation ........................................16 6.1 Delivery condition of the machine...
  • Page 5: General

    PC30 operating instructions General 1.3 Information about this manual 1.1 Information about this manual 1.3.1 Purpose of this manual • This manual enables the machine to be used safely and efficiently. The operating instructions are intended to provide information to the plant manager as well as the fitters and operators •...
  • Page 6: Warranty Claim

    You may only operate this machine if the following conditions are met: origin, improper handling and storage, and obvious non-compliance with • The PC30 peristaltic pump is used to pump the operating instructions. In this context, we refer to our General Terms liquid and pasty materials, such as finishing plaster (up to grain size 3 and Conditions.
  • Page 7: Notes In The Operating Instructions

    Safety instructions on the machine make it Operating personnel are alerted to impending dangers. The following warning signs are attached to the PC30 peristaltic 2.2.4 Cleaning and maintenance of the machine pump: • Electrical voltage! Danger of death from electric shock (1).
  • Page 8: Personnel Qualifications

    PC30 operating instructions 3 Technical data 2.4 Personnel qualifications Gemini GmbH offers training courses on how to operate the PC30 peristaltic pump. Use this service for the initial commissioning of the 3.1 Type plate machine, during which the users are also trained in how to use the machine.
  • Page 9: Material Container

    3.6 Operating conditions 4.2 Functionality 2 - 45 °C temperature range The MASPRA PC30 is a peristaltic pump (displacement pump) in which the material to be conveyed is sucked out of the material maximum 80% Relative humidity, container (1) and is conveyed further into the material hose (4) by contraction movements.
  • Page 10: Assemblies

    4.3.1.2 Basic unit including motor, pump housing and control Connect the power cable to the external power supply (230 V / 50 Hz). The PC30 peristaltic pump may only be operated with an approved residual current device (30 mA) RCD. The controls for the...
  • Page 11: Displays And Controls

    4.4 Displays and controls 4.4.2 Main switch with flow and return If the main switch is set to “AUTO”, the PC30 peristaltic pump is switched off. To switch on the feed pump (feed), turn the switch to the right to “FWD”. The PC30 peristaltic pump is equipped with a return line that you can activate with the “REV”...
  • Page 12: Engine

    PC30 operating instructions 4.4.5 Engine 4.5 Connections Electrical voltage - risk of death from electric shock. 4.5.1 Power connection (230 V) 1. Have work on the electrical Electrical control may only be carried out by a qualified electrician. The machine may only be operated via a plug-in device that is 2.
  • Page 13: Spare Parts And Illustrations

    Corresponds to the number in the drawing with which a spare part is identified. Article number: original article number. Installation quantity: Number of parts of this item as installed in the PC30 peristaltic pump. Unit of measure of this position. Description: Description of the spare part.
  • Page 14 PC30 operating instructions version 2024 page 14...
  • Page 15: Transport And Storage

    PC30 operating instructions 5.4 Complaints transport and storage You can only assert claims for damages relating to transport damage You must immediately notify the delivery company gene. 5.1 Safety instructions for transport Slipping machine 5.5 Packaging Danger to life for drivers and road users.
  • Page 16: Installation

    All you have to do is flange on the material container. the cross-section of the supply cable is at least 2.5 mm. 3. Connect the power cable of the PC30 peristaltic pump to the external power supply. 6.2 Flange mounting of material container The material container is flanged to the base unit with a clockwise rotation.
  • Page 17: Commissioning

    3. Flange the material container to the base 7 Commissioning device of the machine. 4. Connect the power cable of the PC30 peristaltic pump to the external power supply. 5. Flange the material hose to the designated Health hazard from aerosols.
  • Page 18: Material Change

    1. If you notice any deviations in the operating behavior, stop using 2. Press the button on the remote control cable to turn off the machine and connect the the PC30 peristaltic pump immediately. Ball valve on the spray head. 3. Then fill the material container with water 2.
  • Page 19: Areas Of Application

    PC30 operating instructions 9 areas of application peristaltic pump PC30 airless spray fillers exterior/interior emulsion paint silicate paint * Acoustic ceiling coatings, fine acoustic renovation paint acoustic spray plasters, multi-layer cotton plasters concrete contact bitumen thick coatings floor leveling compounds...
  • Page 20: Cleaning & Decommissioning

    Parts that are subject to wear must be replaced as soon as the wear 1. Close the air valve and drive the machine limit is reached. Portable machines, such as the PC30 peristaltic Empty the machine's material container over a pump, must be subjected to an annual electrical inspection in suitable collecting container.
  • Page 21: Maintenance Plan

    PC30 operating instructions 11.1 Maintenance plan Electrical voltage. Checking the machine in once a year Danger of death from a specialist workshop or (recommended) electric shock. at a service location • Only have work on the electrical control system carried out by a...
  • Page 22: Faults And Troubleshooting

    PC30 operating instructions 12 Faults and Troubleshooting The PC30 peristaltic pump is designed for trouble-free operation. Should a fault occur, follow the instructions below to analyse, check and rectify the fault or contact Gemini GmbH Service at +49 7541-98156-15. Malfunctions can endanger the...
  • Page 23 PC30 operating instructions The faults listed below contain recommendations as to who is authorized to remedy the fault. Staff- symptom Possible cause inspection, correction qualification machine The cap nut (M16) for flange Pump • Tighten the cap nut using the 24 mm combination wrench attached to the does not pump.
  • Page 24: Dismantling, Disposal

    • Reuse the metal. • Dispose of the PC30 peristaltic pump via a • Components and tools lying loosely on top of each other or lying scrap metal dealer or scrap metal collection point.

Table of Contents