Advertisement

Quick Links

DAVR-CC CENTRIFUGAL SYSTEM
COD.: DTVI_DAVRCC_2407
REV.: 00
DATE: 15/02/2024
TRANSLATED FROM ORIGINAL
Read carefully before use!
EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAVR-CC and is the answer not in the manual?

Questions and answers

Summary of Contents for DAV TECH DAVR-CC

  • Page 1 DAVR-CC CENTRIFUGAL SYSTEM COD.: DTVI_DAVRCC_2407 TRANSLATED FROM ORIGINAL REV.: 00 Read carefully before use! DATE: 15/02/2024...
  • Page 2: Table Of Contents

    ..........................28 OMPONENT REVISION TROUBLESHOOTING ........................... 29 END OF LIFE ............................ 29 COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law. DATE: 15/02/2024...
  • Page 3: General Information

    If you have any doubts about the interpretation or reading of this document, please contact the manufacturer. DAV Tech declines any responsibility relating to improper use of the component. Observe the specifications in this manual.
  • Page 4: Symbology

    Qualified technician made available by the manufacturer to carry out operations of a complex nature in particular situations, or in any case as agreed with the customer. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 5: Reference Standards

    The reference standards and directives of this manual are the following: Directives • 2006/42/EC – Machinery Directive; COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law. DATE: 15/02/2024...
  • Page 6: Declaration Of Incorporation (Annex Ii B Dir. 2006/42/Ec)

    USE AND MAINTENANCE MANUAL 1.3 Declaration of incorporation (Annex II B DIR. 2006/42/EC) Manufacturer's name: DAV Tech Srl Address: Via G. Ravizza, 30, .36075, Montecchio Maggiore (VI) DECLARES THAT THE ALMOST MACHINE Component: DAVR-CC Model: Coaxial centrifugal dosing system Year:...
  • Page 7: Glossary

    Touch screen that allows the user to interact with a graphic interface using their Touch screen fingers or objects. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 8: Service And Manufacturer Contact Details

    (or the service center if present) directly, specifying the identification data of the component. The customer can make use of the technical and commercial support of local agents or importers, who are in direct contact with the company DAV Tech Srl. Company name...
  • Page 9: Presentation And Operation

    If it is necessary to use several fluids with the same valve, it must be cleaned thoroughly to prevent residues from the previous processing from affecting the processing to be performed. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 10 COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 11 Pneumatic drive Valve Status Case 2: Engine Activates Before Valve COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law. DATE: 15/02/2024...
  • Page 12 For better performance, it is also recommended to oil the incoming air. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 13: Exploded

    2.1 Exploded The following is a list of the main valve components with spare part numbers. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 14 REX055 6,0x22,0x6,2 LOWER CASE 300321022114D DRIVE SHAFT 300321052114D AXIAL CENTRIFUGAL NOZZLE 300321082114D COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law. DATE: 15/02/2024...
  • Page 15: Technical Data

    It may also be that fats with a viscosity higher than those indicated are fine, but it is always to be verified by tests. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 16 You can request the 3D of the component in the desired version from the manufacturer without any obligation. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 17: Safety

    The component is manufactured in compliance with the technical safety standards in force at the time of its construction. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 18: Machine Safety Devices

    If the packaging is not intact, contact the manufacturer immediately, also sending photos of the condition of the packaging. Do not open it until you have notified the manufacturer. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 19: Installation

    • Electrical connection; • Pneumatic connection; • Fluidic connection. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law. DATE: 15/02/2024...
  • Page 20: Electric

    Once you have performed the steps above, close everything and lock the cable with the appropriate lock. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 21: Pneumatic

    Connection via an intermediate block. To carry out these two procedures, please refer to chapter 7 COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 22: Commissioning

    How to perform the installation of valves using intermediate block; • How to install the nozzle extension (for dosages over 100mm) COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 23: Installation Of Dosing Systems

    USE AND MAINTENANCE MANUAL 7.1 Installation of dosing systems In this chapter we want to explain how to install any dosing system (compatible with the DAVR-CC block, see chapter 2.2). There are various types of installation that can be used. For this reason, it is advisable to talk to the manufacturer of your project to have the ideal solution for your use.
  • Page 24: Nozzle Holder Installation

    Longer screws (35mm) must be used to reach the stop, otherwise the block cannot be fixed in place. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 25: Rotation Sensor Installation

    • Clean the nozzle of residues and activate the centrifugal system. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law. DATE: 15/02/2024...
  • Page 26: Maintenance

    The times given below are indicative as they depend on how the component is used. Follow the variations suggested by the technicians. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 27 ATTENTION! Only use soft brushes or cotton cloths to clean the dosing system. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 28: Leakage Control

    If leaks are found, even small ones, the mechanical manager must be called to carry out the overhaul of the component. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 29: Nozzle Replacement/Cleaning

    • Lock the standby inserting the 4 fixing screws to the bottom case. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 30: Component Revision

    It is advisable to check the status of the latter as well and, if necessary, replace them. COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.
  • Page 31: Troubleshooting

    COD.: DTVI_DAVRCC_2407 DAV TECH SRL REV.: 00 Any reproduction (total or partial) of this document not authorized by the manufacturer will be punished according to the law.