Download Print this page

H2O Innovation Leader MicRO 2 to 3 Expansion Installation Manual

Advertisement

Quick Links

BACK VIEW
1/2" PVC Tee
Membrane Housing
Band Clamp #08 x 6
and Membrane x 1
(#283 & #85063)
Membrane Enclosure
Hex Bolt 3/8" x 1" x 4
Strap 4" x 2
Hex Bolt 3/8" x 2" x 2
(#130026)
(#BOLT304-3/8x1 & 2)
MicRO 2 to 3 Expansion Installation Guide
90° PVC Elbow
Enclosure Strap 4" x 2
1" Bolts x 4
Membrane &
Housing
90° PVC Barbed
Elbow x 2
(#60194)
(#264)
Hex Nut 3/8" x 6
(#NUT304-3/8)
TOP VIEW
Hanging Brackets x 2
2" Bolts x 2
1/2" PVC Plug
BOTTOM VIEW (UNDERNEATH)
90° PVC
Barbed Elbow
1/2" PVC Barbed
Straight Adapter
1/2" PVC Barbed
1/2" PVC Tee x 1
Straight Adapter x 1
(#47107)
Flat Washer x 6
Lock Washer x 6
(#68236)
(#LWAS304-3/8)
38" Hose
1/2" PVC Plug x 1
(#47112)
(#85057)
1/2" Braided Hose:
12" length x 1
38" length x 1
65" length x 1
(#70297)

Advertisement

loading
Need help?

Need help?

Do you have a question about the Leader MicRO 2 to 3 Expansion and is the answer not in the manual?

Questions and answers

Summary of Contents for H2O Innovation Leader MicRO 2 to 3 Expansion

  • Page 1 MicRO 2 to 3 Expansion Installation Guide BACK VIEW TOP VIEW 90° PVC Elbow Hanging Brackets x 2 2” Bolts x 2 1/2” PVC Plug 38” Hose Enclosure Strap 4” x 2 BOTTOM VIEW (UNDERNEATH) 1” Bolts x 4 Membrane & Housing 90°...
  • Page 2 STEP 1 Relabel the membranes as shown with the supplied stickers, (facing the front) the new membrane that was supplied with this expansion kit needs to be labeled “Membrane 1” and the other labels need to be applied so they match the photo (membrane 1 will become membrane 2 and membrane 2 will become membrane 3).