The user undertakes to use this product only for legitimate purposes and agrees to the relevant laws of this agreement. GDU-TECH is not responsible for any damage, injury or any legal liability caused by the direct or indirect use of this product.
Frog-jump flight: supporting drones to operate in a frog-jump manner, effectively increasing the duration and scope of inspection operations. Tower Deployment: The K03 can be installed on the China Tower and power towers, effectively locating suitable deployment sites. Deep standby, ultra-low power consumption: K03 has a deep standby function, reducing standby power consumption to below 10W, and achieving long-time standby under solar power supply.
Debug Box Instructions Debug buttons: Open door: control the opening and closing of the cabin door. Extend: control the expansion and contraction of the apron. Force start: use UPS power to forcefully start docking station. Power switch: power supply to the docking station.
Door The hatch cover joint has a built-in heating strip, which automatically starts heating at low temperatures to assist in deicing the hatch cover joints. Docking Station LED Indicator LED indicator Description Green light solid on Docking station in normal status Red light solid on Docking station in abnormal status Red light flashes...
Docking Station Environment Perception Monitoring camera and fill light The docking station is equipped with two surveillance cameras and one fill light. Surveillance camera: used to monitor the real-time situation of the docking station. Users can view the internal and external environment of the docking station in real time on the UVER interface, which assists operators in remotely observing weather conditions, on-site environment, and aircraft takeoff and landing performance.
Light sensor The docking station is equipped with light sensors to detect the lighting conditions outside the docking station. Weak light environment will activate the fill light to assist in precise landing. Landing Pad Nose direction mark: When placing the aircraft on the apron, the nose direction must be consistent with the arrow on the apron, otherwise the aircraft will be damaged.
It is not recommended to calibrate the docking station position. Docking Station Protection Level When used with the S200 series aircraft, the K03 can achieve the P55 protection level under controlled laboratory conditions according to the IEC60529 standard. Protection level is not permanently effective and may decrease due to long-term use.
Instructions for UVER System Login Users should use a browser to access the docking station management system, enter the assigned account password and enterprise code, and then enter the verification code to log in. Docking Station Control The docking station control interface is the homepage of the UAV automatic airport management system.
Docking Station List Click the "Docking Station List" button to display the docking station list. Users can click on the docking station they want to view and enter the docking station details page to view the docking station operation status, docking station monitoring screen or control the docking station.
Task List The task list contains all route tasks. When you want to manually execute a route, execute it via manual task; when you want to check the execution status of a regular task, check it on the regular task page. Aircraft Control When a docking station (aircraft connected) or a connected aircraft is selected, the user can control the current aircraft.
Route Management The route management module supports functions of planning, managing, storing, importing and exporting routes. The platform provides users with a variety of route types to meet different flight operation scenarios. Add a new route Click the “New Route” button to enter the page for adding a new route. When adding a new route, first draw the route on the map, then configure the route information and waypoint information on the left, and click "OK"...
Task Management Create a new task Click the "Create a new task" button in the task management interface to enter the task planning module. 2. On the new task interface, fill in the task name, execution library, execution route, execution method, etc. After filling all the fields, you can select the execution time and add the execution date to the task calendar.
View tasks The task list supports docking station or route filtering. Click on the task card to display the route and task execution information of the task execution on the map. Click on the task card expansion button, click on details, to view the record of task execution.
Under the results list, click on the details to view the large picture. Delete mission results package Users can click "Delete" in the list or in large image mode.
Appendix Appearance Size Size of the closed cabin door: 650mm× 555mm× 370mm. Size of the closed cabin door: 1380mm× 555mm× 370mm (Excluding the heights of the meteorological stations and tripod) Weight 49kg ± 1kg External fill light Supported Docking station status Supported indicator Operation capability...
Page 20
Vibration protection Supported Prevent small animals and Supported insects Environmental perception Outside temperature Supported Outside humidity Supported Outside rain monitoring Supported Outside wind monitoring Supported Inside temperature Supported monitoring Inside humidity monitoring Supported Light sensor Supported Smoke monitoring Supported Vibration sensor Supported Water immersion Supported...
Page 22
To Whom It May Concern, We, GDU-Tech Co., Ltd. hereby declare that our product (DOCKING STATION) Model Number: GDU-K03 herby declares that requirements of KDB 353082 D01 Antennas Part 15 Transmitters v01 have been met and shown on the following questions.
Page 23
Should you have any questions or comments regarding this matter, please have my best attention. Sincerely, (Signed) Name / Title: Renyi Chen / Manager Company: GDU-Tech Co., Ltd. Address: Building 2, No.5, Huanglongshan South Road, Donghu New Technology Development Zone, Wuhan 430074, China Phone: +86-18379713590 Fax: +86-27-81298796 E-Mail: chenrenyi@gdu-tech.com...
Need help?
Do you have a question about the K03 and is the answer not in the manual?
Questions and answers