HBD 400 Site Preparation Checklist
本清单内容意在协助客户准备并确认设备现场要求具体情况,请认真查阅以下相关内容要求,如实填写以下地址信息、
联系信息和核对清单。如果无法填写或不需要填写某项核对清单内容,请在"备注"中附上简短说明并联系汉邦销售
代表协商解决。在填写核对清单后,请在核对清单中签名,并至少在设备发机前 1 周签字回传给汉邦销售代表。
This listing is intended to help customers to prepare and confirm the specific production site installation requirements,
please refer to the following contents, carefully fill in the following address information, contact information and the check
list. If you cannot fill in or do not need to fill in an object, please attach a brief explanation in the "Comments" and contact
the HBD sales representative for confirmation. After completing the checklist, please sign the checklist and return it to the
HBD sales representative at least 1 week before the equipment is shipped.
注:下列每个选项必须选中"是"下的框打勾,才能继续进行安装,特殊情况请在备注上填写,并联系汉邦销售代表
确认。
Note: the check box must be checked for each of the following options before the installation. In special cases, please fill in
the notes and contact the HBD sales representative for confirmation.
本清单一经签名,就表明您如实确认已根据清单中提供的规格准备好现场,已填写了所有核对清单内容,并且可以
随时在现场中卸下和安装设备。
Once this checklist signed, it means you truthfully confirm the production site is ready according to the specifications
provided by this checklist, Furthermore, it indicates that your production site is ready for the unload and installation with no
time restrictions.
地址信息 Address
公司名称
Company
国家
Country
详细地址
Detailed Address
Contact Person
联系人
HBD 400 现场准备核对清单
Duty
职务
邮政编码
Zip Code
电话
Tel.
Tel.
电话
Page 1 of 9
Email
电子邮件

Advertisement

loading
Need help?

Need help?

Do you have a question about the 400 and is the answer not in the manual?

Questions and answers

Summary of Contents for HBD 400

  • Page 1 If you cannot fill in or do not need to fill in an object, please attach a brief explanation in the "Comments" and contact the HBD sales representative for confirmation. After completing the checklist, please sign the checklist and return it to the HBD sales representative at least 1 week before the equipment is shipped.
  • Page 2 Item 基本参数 Basic Parameter 项目 设备型号 HBD 400 Printer Model 1900x1650x2300 mm (excl.purifier, powder feeder, water-cooled chiller) 设备主体尺寸 Printer Size 3600x3000x3000 mm (incl. purifier, powder feeder, water-cooled chiller)(含辅助设备) 设备主体装箱尺寸 长 x 宽 x 高(L*W*H):2140x1740x2960 mm Printer Package Size 3300kg (excl. accessory equipment) 设备质量...
  • Page 3 预计安装调试时间 项目 Item Estimated Installation & Commissioning Time 设备安装时间 Installation 2 天/days 硬件调试时间 Hardware Commissioning 2-3 天/days 基础工艺调试时间 Parameter Commissioning 3-5 天/days 工艺复核时间 Process Review 6-8 天/days 安装调试总耗时 Time in Total 12-18 天/days ——————设备放置空间 Equipment Placement Space Page 3 of 9...
  • Page 4 ——————设备 Equipment 常规出入和卸货要求 是 Yes 否 No 备注 Notes Regular Access and Unloading Requirements 是否有方便出入的卸货区域,并且该区域有足够大的场地 □ □ 卸下和搬运设备? Is there an accessible unloading area and is it large enough for unloading and moving equipment? 所有通道与门口满足最大通过尺寸要求(建议尺寸:宽度 2000mm 以上,高 2800mm 以上,若有转弯,需满足让机 器旋转距离) □...
  • Page 5 Is the ground of the equipment place level and flat (no slope, concave and convex spots, etc. It’s recommended to use high-quality cement ground to ensure the hardness of the ground.) Floor paint, ceramic tiles, etc. require special ground techniques, and communicate with HBD in advance. 地面是否满足承载能力在 700kg/m²以上,场地无振源或其 它可能引起地面振动的设备。 □...
  • Page 6 安全要求 Safety Requirements 是 Yes 否 No 备注 Notes 配备 2 个以上的 D 类金属专用灭火器,每隔 100 ㎡增配 1 个灭火器放置点。灭火器的摆放位置应当明显、方便取用、 无遮拦物 □ □ Equipped with more than two class-D fire extinguishers for metal(alloy), and one additional fire extinguisher placement point every 100 ㎡. The placement of fire extinguishers should be obvious, easy to access, and free of obstructions.
  • Page 7 电气安装要求 Electrical Installation Requirements 是 Yes 否 No 备注 Notes 配备独立的三相 380V 63A 空气开关 1 个 □ □ Equipped with an independent three-phrase 380V 63A air switch. 至少配备 220V 10A 三孔电源插座 2 个 □ □ Equipped with at least 2pcs of 220V 10A three-hole power sockets.
  • Page 8 □ □ 现场压缩空气压力要求:0.5-0.8Mpa On site compressed air pressure requirement: 0.5-0.8MPa □ □ 准备 45L 以上的蒸馏水 Prepare more than 45L of distilled water. 生产环境要求 是 Yes 否 No 备注 Notes Environment Requirements for the Production Site □ □ 室内温度要求 24°C ± 3°C Temperature requirements: 24°C ±...
  • Page 9 避免地面潮湿、粉尘和有腐蚀性气体的场所 □ □ Avoid ground moisture, dust and corrosive gas in the production site. 避免设备周围强电磁场干扰场所 □ □ Avoid strong electromagnetic interference around equipment. 避免强振动,避免油气,水汽的场所 □ □ Avoid strong vibration, oil gas and water vapor in the production site. 避免较强的噪声干扰场所(小于 70 分贝) □...