PREFACE/PARTS Before using this machine, we advise you to read this manual thoroughly. Please follow the instructions to ensure proper operation and the lasting of the machine Top Cover Brass Tee Off Valve Regulator NEOTAP - Hot, Cold, Sparkling Faucet Co2 Bottle (Plumbers Delight) Indicating Panel...
PIPING INSTALLATION - DIAGRAM Water Feed 1/4" Pipe (Cold Outlet) 1/4" Pipe Neotap Faucet Wiring loom 1/4" pipe Hot Water Tube - Black (Friction fit) Hot Water Outlet Co2 Inlet Water Co2 Bottle Cold water Inlet Outlet KDF50 (Directional flow) (Directional Flow.Flush Brass Tee off Valve out black carbon dust...
PIPING INSTALLATION We recommend the instructions specified in this guide be followed in sequence by a qualified tradesperson to an existing potable water supply for successful installation When installing please ensure the unit is easily accessible for service and maintenance This Neotap has a 12 month back to base warranty from purchase, but this may be voided if unsatisfactory installation results in damage to the unit.
Page 5
PIPING INSTALLATION 14. Open gas bottle by turning the main bottle valve anticlockwise + 6 4 0 9 6 3 6 - 7 0 7 0 | W W W . S P R I N G N Z . C O . N Z | S A L E S @ S P R I N G N Z . C O . N Z...
Page 6
BOILER - OPERATION INSTRUCTIONS COLD Inlet HOT Outlet Power ON/OFF Temperature DOWN Temperature UP Power Saving Mode Display Panel Once connected as outlined in the piping instructions connect the BOILER to power at the wall and turn on at the wall. Please leave the power button on the front of the unit off at this stage (This is important, as if the boiler is turned on before water has run through the unit it does run the risk of burning out the element) Ensuring the NEOTAP is turned on at the wall, press and hold the HOT button on the faucet...
Co2 BOTTLE - INSTALLATION 1. Ensure the Co2 bottle is connected firmly to the regulator and the Co2 tube is fitted correctly. 2. Slowly turn the dial on the regulator clockwise until the gauge reads 3BAR (Note: If you want to reduce the pressure you must first turn the dial anticlockwise and then vent to relieve existing pressure.
Page 8
NEOTAP FAUCET - COLD AMBIENT INSTRUCTIONS SPARKLING COLD Turn on the COLD switch at the rear of the unit Leave to cool for 40 minutes Press the COLD button for Chilled water or SPARKLING button for Sparkling water NEOTAP FAUCET - HOT WATER INSTRUCTIONS Press the HOT button on the faucet to dispense For best results allow 5 seconds to pass before using, this allows the pipe to completely fill with HOT Water...
Page 9
PUSH LOCK FITTING - INSTRUCTIONS 1. Cut the 1/4" Pipe square and push into the fitting. 2. The Push lock fitting will grip before it seals. Ensure the pipe is pushed past the O-Ring into the fitting completely 3. Pipe is secured in position. A small tug back will guarantee the pipe is in place Disconnection Pull locking ring flush against the fitting and hold.
Page 10
LEAKAGE DETECTION - DIAGRAM This device has a leakage detection probe fitted for safety purposes. When the probe detects moisture you may notice the LED on the machine flashing accompianied by a beeping noise We recommend turning off the electricity at the power supply and calling a qualified technician to carry out this work for your safety.
MAINTENANCE GUIDELINES For effective performance of the Neotap unit Spring Water Solutions recommend 6 monthly service checks and annual filter changes Points to check on installation and subsequent maintenance - Please ensure the unit is able to be easily accessed for service and changing of...
PRODUCT DATA SHEET Spring Neotap - LC INSTANT TAP Overview Underbench filter for boiling, chilled, sparkling and ambient drinking water. Light Commercial (LC) Model includes an additional boiler for increased heating capacity Sparkling, Hot, Cold Model Premium KDF/GAC 50, 5 Micron Filtration...
Need help?
Do you have a question about the NEOTAP LC and is the answer not in the manual?
Questions and answers