Install the threaded rods and hand-tighten Feed the assembly through the hole in the the flext-pipes into the bottom of the mixer basin/countertop. body. Slide the rubber 'C' washer followed by the Flush the pipework, then connect the flexi metal 'C' washer and tighten the back nuts pipes to the isolation valves, turn on the with a spanner to secure the mixer.
Page 6
POP-UP WASTE ASSEMBLY (PUW) Dissemble the pop-up waste and reassemble onto the basin ensuring the foam washer is placed between the top waste housing and the basin. The rubber washer is to be placed on the bottom waste housing before being tightened Insert the vertical pop up rod into the mixer body and connect to the horizontal rod on the waste body using the connector provided.