EOR (Engineer of Record), local building official or a licensed professional engineer. ・ Ensure that RT-PLUS and other products are suitable for installation location and installation conditions. RT-PLUS can be installed on low slope roofs (metal, EPDM, TPO, SBS modified...
Page 4
Introduction ・ RT-PLUS can be installed on low slope roofs (metal, EPDM, TPO, SBS modified asphalt/torch-on, asphalt) and steep slope roofs (asphalt shingles, metal). For low slope ・ Please remove any dust and dirt from the roof surface before installation.
・To avoid electric shock, cover the solar module array with a shading sheet to stop power generation before performing any work. ・Follow the manufacturer’s installation manual, maintenance guide, and the RT-PLUS installation manual when carrying out maintenance on the solar modules.
Installation Safety Installation Safety Installation involves work on a sloping roof. In addition, it is necessary to work with tools and heavy materials, so please observe the following: ・ Use properly anchored fall protection equipment. ・ Use caution to prevent objects from falling or dropping off the roof area. ・...
RT-PLUS Components 1.RT-PLUS Components ① RT-PLUS 3/8BK Set (RT4-00-PLUS-38BK-60) Item QTY/BOX RT-PLUS 3/8 BK Screw 5.0×60 RT-Butyl ② RT-PLUS 3/8ML Set (RT4-00-PLUS-38ML-60) Item QTY/BOX RT-PLUS 3/8 ML Screw 5.0×60 RT-Butyl ③ RT-PLUS 5/16BK Set (RT4-00-PLUS-5/16BK-60) Item QTY/BOX RT-PLUS 5/16 BK Screw 5.0×60...
① Chalk a vertical line (M-line) and a horizontal line (Y-line) according to the layout plan to indicate the position for the RT-PLUS position. M-line: Center of RT-PLUS (For rafter mounting, center of the rafter; for deck mounting, any chosen spot)
Page 11
The butyl must be cut. Three Tab Shingles When installing RT-PLUS on a slit, fill the slit with butyl. If there is a step, use butyl to make the surface of the roof flat. Please cut the butyl...
Page 12
RT butyl tape. The slit must be filled with RT butyl tape. If there is a slit on the ridge side of the RT-PLUS, fill the slit with butyl and apply sealant around the butyl. Cut the butyl before use.
Page 13
Installation on Asphalt Shingle Roof ③ Remove the protective paper under the RT-PLUS, and position along the chalk line. Place,『↑RIDGE』on the ridge side. Attention Do not leave any protective paper on the surface of the RT butyl tape, it can cause an improper seal and may allow water intrusion under the bracket.
Installation on Asphalt Shingle Roof Rafter Mounting Mount the RT-PLUS using the square holes. Use two wood screws. Attention The mounting screw shall hit this area. 5/16 inch 5/16 inch The wood screw must clear 5/16” from each edge of the rafter.
Page 15
Installation on Asphalt Shingle Roof If you miss screwing the rafters, please use off set screw positions as below using six wood screws. Please refer to the PE Stamped Letters for maximum span adjustment.
Installation on Asphalt Shingle Roof Deck Mounting Mount the RT-PLUS using the round holes. Use five wood screws. Attention Each RT-PLUS is shipped with 2 mounting screws. The installer must purchase additional screws when mounting it to the roof deck.
Page 17
In case the stainless screw hits a nail head: 1) Tip the driver at an angle. 2) Use a 3 mm steel drill to make a hole. 3) If possible, remove the nail from underneath. ⑤ Make sure RT-PLUS is securely fixe...
Installation on Metal Roof 3.Installation on Metal Roof Attention RT-PLUS can be installed on a metal roof with decking. However, the intermediate rib height must be less than 23mm (0.9”). Install RT-PLUS on a flat surface of the metal roof.
Page 19
Installation on Metal Roof ① Chalk a vertical line (M-line) and a horizontal line (Y-line) according to the layout plan to indicate the position for the RT-PLUS position. (ⅰ)M-line: Center of the RT-PLUS (ⅱ)Y-line: Edge of RT-PLUS ② Mark the position as shown here on the right.
Page 20
Installation on Metal Roof ③ Use a center punch to make pilot holes. ④ Please add a butyl pad (RT - Butyl Spacer) on the surface between the ridges.
Page 21
Installation on Metal Roof ⑤ Remove the protective paper under the RT-PLUS and place it at specified location. Place、 『↑RIDGE』on the ridge side. Attention Do not leave any protective paper on the surface of the RT butyl tape, it can cause an improper seal and may allow water intrusion under the bracket.
Page 22
⑥ Drive the screw 5.0×60 while holding the RT-PLUS. Use the round holes on the RT-PLUS. Use five wood screws. Attention Each RT-PLUS is shipped with 2 mounting screws per set. The installer must purchase additional screws when mounting it to the roof deck.
Page 23
Too loose Bracket Rubber Washer When tightening the screws please tighten all screws equally and avoid using an impact driver as it can over torque the screws or even snap off the head ⑦ Make sure RT-PLUS is securely fixed.
Page 24
Installation on Metal Roof ⑧ If the RT-PLUS overlaps with the metal roofing’s rib, create a roof cricket on the ridge side of RT-PLUS using RT Butyl tape or a roof sealant. 【Roof sealant recommended products】 ・Henry : 208R, 209, 925 (Black) ・Geocel:S2, S4 (Black)
Installation on Composite Slate Roof 4.Installation on Composite Slate Roof Please verify compatibility between RT Butyl (AlphaSeal®) and Composite Slate manufacturer. Attention 注 意 The minimum gap between the screw 5.0×60 and the edge of the slate should be 2" (50 mm).
Page 26
Installation on Composite Slate Roof Attention If you are installing the RT-PLUS within 2 inches (50 mm) of a roof gap, you will need to fill the gap with sealant or butyl as shown below.
Page 27
Installation on Composite Slate Roof ① Chalk a vertical line (M-line) and a horizontal line (Y-line) according to the layout plan to indicate the position for the RT-PLUS position. (ⅰ)M-line: Center of RT-PLUS (ⅱ)Y-line: Edge of RT-PLUS ② Mark the position as shown on right.
Page 28
Installation on Composite Slate Roof Caution: A drill bit stop can help you control the depth you drill. Always use the stop to drill only through the roofing layer, not through the decking or underlayment. Attention Drilling into the wood underneath should be avoided. ④...
Page 29
Installation on Composite Slate Roof ⑤ Remove the protective paper under the RT-PLUS and place it on specified chalk line. Place、『↑RIDGE』on the ridge side. Attention Do not leave any protective paper on the surface of the RT butyl tape, it can cause an improper seal and may allow water intrusion under the bracket.
Page 30
⑥ Drive the screw 5.0×60 while holding the RT-PLUS. Use the round holes on the RT-PLUS. Use five wood screws. Attention Each RT-PLUS is shipped with 2 mounting screws per set. The installer must purchase additional screws when mounting it to the roof deck.
Page 31
Too tight Bracket Rubber Washer When tightening the screws please tighten all screws equally and avoid using an impact driver as it can over torque the screws or even snap off the head ⑦ Make sure the RT-PLUS is securely fixed...
Can be installed on SBS, TPO, and EPDM roofing materials. ① Chalk a vertical line (M-line) and a horizontal line (Y-line) according to the layout plan to indicate the position for the RT-PLUS position. (i) M-line:Center of RT-PLUS (ii) Y-line:Edge of RT-PLUS...
Page 33
Attention To maintain butyl performance, avoid installation when ambient temperature is below 22 °F (-5°C) or above 176 °F. (80°C). ③ Drive the screw 5.0×60 while holding the RT-PLUS.
Installation on Membrane Roof Rafter Mounting Mount the RT-PLUS using the square holes. Use two wood screws. Attention The mounting screw shall hit this area. 5/16 inch 5/16 inch The wood screw must clear 5/16” from each edge of the rafter.
Page 35
Installation on Membrane Roof If you miss screwing the rafters, please use off set screw positions as below using six wood screws. Please refer to the PE Stamped Letters for maximum span adjustment.
Drive the screw 5.0×60 while holding the RT-PLUS. Use the round holes on the RT-PLUS. Use five wood screws. Attention Each RT-PLUS is shipped with 2 mounting screws per set. The installer must purchase additional screws when mounting it to the roof deck.
Page 37
Too tight Bracket Rubber Washer When tightening the screws please tighten all screws equally and avoid using an impact driver as it can over torque the screws or even snap off the head. ④ Make sure the RT-PLUS is securely fixed...
Asphalt Shingles Roof Installation (Alternate Method) 6. Asphalt Shingles Roof Installation (Alternate Method) For a deck mount on an asphalt shingles roof, RT-PLUS installation may be easier if the rail is attached beforehand. ① Chalk a vertical line (M-line) and a horizontal line (Y-line) according to the layout plan to indicate the position for the RT-PLUS position.
Page 39
② Pre-attach a rail or rail support bracket to the RT-PLUS. Please attach the rail on the ground. ③ Take the rail with the RT-PLUS attached to it onto the roof and align the RT- PLUS with the chalk line.
Page 40
Asphalt Shingles Roof Installation (Alternate Method) “↑RIDGE” is on the ridge side.
Page 41
Asphalt Shingles Roof Installation (Alternate Method) ④ Move the RT-PLUS to a flat surface of the asphalt shingles roof. Follow the span distance according to the PE Stamped letters. ⑤ Remove the protective paper under the RT-PLUS and place it at specified location.
Page 42
Asphalt Shingles Roof Installation (Alternate Method) ⑥ Secure the RT-PLUS with screw 5.0×60. Please use the round hole of the RT-PLUS. Use 5 wood screws. * Use a long bit socket Attention Each RT-PLUS is shipped with 2 mounting screws per set.
Page 43
Socket or Washer Phillips head Rubber Washer Washer Good Too loose Too tight Bracket Rubber Washer When tightening screws, tighten all screws evenly and avoid using an impact driver. ⑦ Make sure the RT-PLUS is securely fixed.
Page 44
If installed with the RT-Rail, apply 12 lb-ft of torque to the 5/16” bolt. If not specified by the rail manufacturer, Roof Tech recommends a minimum of 12 lb-ft on a 5/16 Bolt and 18 lb-ft on a 3/8” bolt.