Advertisement

Quick Links

2
UKCA Declaration of Conformity
3
EC Declaration of Conformity
BELLE
DUX E+ DRIVE UNIT
Operators Manual
1
870/20025/0
09/24
4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BELLE DUX E+ DRIVE UNIT and is the answer not in the manual?

Questions and answers

Summary of Contents for Altrad BELLE DUX E+ DRIVE UNIT

  • Page 1 BELLE 870/20025/0 09/24 DUX E+ DRIVE UNIT Operators Manual UKCA Declaration of Conformity EC Declaration of Conformity...
  • Page 2: Ukca Declaration Of Conformity

    M14 4PN, UK carried out Internal Control of Production with Assessment of Technical Documentation and Periodical Checking as per Schedule 9 of SI 2001 1701 Technical Files are held by Ray Neilson at the Altrad Belle address stated above:- Place of Declaration:- Sheen, Nr.
  • Page 3: Ec Declaration Of Conformity (Doc)

    EC Declaration Of Conformity (DOC) We, Altrad Belle, Sheen, Nr. Buxton, Derbyshire, SK17 0EU, GB declare that the DoC is issued under our sole responsibility and belongs to the followings product(s): PRODUCT TYPE ..... Signed by: MODEL........Ray Neilson SERIAL No.......
  • Page 4: Table Of Contents

    Contents CONTENTS PAGE NUMBER UKCA DECLARATION OF CONFORMITY .............................. 2 EC/EU DECLARATION OF CONFORMITY ............................. 3 INTRODUCTION ....................................... 5 WARNING ...................................... 5 Serial Numbers....................................6 MACHINE DESCRIPTION General......................................6 Standard Operation ..................................6 Danger Zone ....................................6 Main Components Locations ................................7 Power Unit Components ................................
  • Page 5: Introduction

    When replacements are required, insist on genuine Altrad Belle parts, as extensive damage is liable to result from the use of inferior quality parts.
  • Page 6: Serial Numbers

    Suitable wet concreting applications include slabs, footings, stairways, footpaths and similar. Any other use is not deemed suitable for this machine. Altrad Belle will not be liable for any damage or injury resulting from any use other than outlined above. The operator will be liable.
  • Page 7: Main Components Locations

    Machine Description MAIN COMPONENT LOCATIONS Protection Frame. Power Unit. Lifting Eye. Side Protection Guard. Drive Sleeve. Shaft Retaining Plunger. Securing Pin retaining bracket NOTE:- The Drive Unit shown in the diagram above includes the with the standard machine.
  • Page 8: Power Unit Components

    Machine Description POWER UNIT COMPONENTS ON / OFF Button. Battery. C. Battery Compartment Lid. D. Battery Level Indicator. Battery Presence Indicator. Serial Label BATTERY PACK COMPONENTS A. Battery Charge Level Button. B. Battery Charge Level Display. C. Serial Label. D. Battery Caution / Over Temperature Indicator...
  • Page 9: Battery Charger

    Machine Description BATTERY CHARGER A. Battery Pack Charging Dock B. AC Power Cable Socket C. Dock Indicator 1 D. Dock Indicator 2 Model: 82C2 ERP: 2901786 OUTPUT: 82V INPUT: 230V ~ 50Hz/60Hz, 8A Before charging, read the instructions. For indoor use. GLOBGRO AB Globe Group Europe Riggaregatan 53 211 13 Malmö, Sweden...
  • Page 10: Technical Data

    Technical Data STATIC DIMENSIONS Model DUX E+ A - Machine Length (mm) B - Machine Width (mm) C - Machine Height (mm) D - Machine Length with optional swivel base (mm) E - Machine Width with optional swivel base (mm) F - Machine Height with optional swivel base (mm)
  • Page 11: General Data

    Technical Data GENERAL DATA Model DUX E+ Motor Type Cramer 82H360S2Q Motor Speed (rpm) 2800 Motor Power (Hp / kW) 3.0 / 2.2 Max. Voltage (v) Nominal Voltage (v) *Machine Weight (kg) IP Rating IP44 Batteries 2x 8Ah or 2x 5Ah or 1x 8AH or 1x 5AH or a combination of 1x 8AH + 1x 5AH Noise Level (dB L *weight without batteries included.
  • Page 12: Safety Instructions

    It is the responsibility of the operator to ensure that he/she fully understands how to operate this equipment safely. If you are unsure about the safe and correct use of the machine, consult your supervisor or Altrad Belle.
  • Page 13: Operating The Machine

    Safety Instructions OPERATING THE MACHINE • DO NOT • Check condition of the battery housing. Ensure that there is no residual moisture or water lying in the housing. If so remove this before inserting the battery. • Check the battery terminals are in order and not bent, damaged or heavily corroded. If they are DO NOT use the drive unit. •...
  • Page 14: Battery Charger

    Safety Instructions BATTERY CHARGER • To reduce the risk of injury, ONLY batteries may burst causing personal injury and damage. • This Battery Charger is not intended for use by children or persons with physical, sensory or mental limitations or a lack of experience or knowledge.
  • Page 15: Battery Pack

    ENSURE that all consumables and replaced parts are disposed of safely and with minimum environmental impact. MODIFICATIONS & REPLACEMENT PARTS • NEVER • ALWAYS safety of the machine. This may also void the Warranty. Genuine Altrad Belle replacement parts can be purchased online at www.Altrad-Belle247.com...
  • Page 16: Safety Decals

    Safety Instructions SAFETY DECALS A. Branding Decals. B. Lifting Point Decal. Lifting point for use with a Sling or Mechanical Hoist. C. Noise Level Decal. Indicates the noise level of the machine. D. General Safety Decal. Read the Wear Ear Wear Eye Wear Protective Operators...
  • Page 17: Operating Instructions

    Operating Instructions Refer to the Machine Description section to identify all components mentioned in this section. CHARGING THE BATTERY PACK The battery pack is not shipped fully charged. It is recommended to fully charge before use to ensure that CAUTION maximum run time can be achieved.
  • Page 18: Removing The Battery Pack

    Operating Instructions REMOVING THE BATTERY PACK FROM THE POWER UNIT CAUTION ENSURE the machine is switched OFF before removing the battery. 1. Stop the drive unit using the START/STOP button. 2. Unclip and open the battery housing cover. 3. Push down lightly onto the top of the battery, at the same time press and release the battery retaining latch. Remove your hand from the top of the battery and it should rise slightly.
  • Page 19: Operating The Drive Unit

    To STOP the power unit - refer to ‘Start / Stop Procedure’ in this manual. Note: shaft poker and will invalidate the Altrad Belle Warranty. Storage If the drive unit is not to be used for an long period of time it must be stored correctly to prevent deterioration or damage occuring during this period.
  • Page 20: Troubleshooting Guide

    Recharge the battery as per the instructions in the manual. Items marked with * should only be carried out by a competent electrician or Altrad-Belle dealer. BATTERY PACK & CHARGER Problem Cause...
  • Page 21: Service And Maintenance

    A poorly maintained machine could be a danger to the operator and the other personnel on the worksite. ENSURE that the regular ALWAYS use genuine Altrad Belle replacement parts, the use of spurious parts may void your warranty. ALWAYS set the machine on stable, level ground.
  • Page 22: Environment

    Environment Safe Disposal. Component Material Instructions for the protection of the environment. Frame Steel The machine contains valuable materials. Take the discarded apparatus and accessories to the Side Guards Steel relevant recycling facilities. Drive Sleeve Cast Iron Optional Swivel Base Steel Power Unit *See Below...
  • Page 23: Warranty

    2. Alterations, additions or repairs carried out by persons other than Altrad Belle or their recognised agents. 3. Transportation or shipment costs to and from Altrad Belle or their recognised agents, for repair or assessment against a warranty claim, on any machine.
  • Page 24 ALTRAD BELLE Sheen, Nr. Buxton, Derbyshire, SK17 0EU, GB Tel. +44 (0)1298 84606 - Fax +44 (0)1298 84722 - Email: sales@altrad-belle.com www.Altrad-Belle.com BELLE EU IMPORTER ADDRESS LIGHT ADRESSE DE L'IMPORTATEUR - DIRECCIÓN DEL IMPORTADOR - ENDEREÇO DO IMPORTADOR - ADRES IMPORTEUR CONSTRUCTION IMPORTØRENS ADRESSE - IMPORTEUR ADRESSE - INDIRIZZO DELL'IMPORTATORE - IMPORTÖRENS ADRESS - IMPORTØRADRESSE...

Table of Contents