INSTRUCTION MANUAL
IO-Link Master Unit for CC-Link IE Field
SC-LG2-CEF-P
MJE-SCLG2CEFP No.0095-42V
Thank you very much for purchasing Panasonic products. Read this Instruction Man-
ual carefully and thoroughly for the correct and optimum use of this product. Kindly
keep this manual in a convenient place for quick reference.
This document provides a brief summary of mounting, wiring, and other related
information. For detailed information, refer to the "SC-LG2-CEF-P User's Manu-
al" (our Website: https://industry.panasonic.com/ ).
CC-Link IE Field is a registered trademark of Mitsubishi Electric Corporation and
a trademark managed by CC-Link Partner Association.
IO-Link is a registered trademark of PROFIBUS User Organization. The owner-
ships of all other trademarks belong to their respective owners.
WARNING
Never use this product as a device for personnel protection.
For personnel protection, use only products that meet the laws and standards for per-
sonnel protection that apply in each region or country, such as OSHA, ANSI and IEC.
1
STANDARDS / REGULATIONS
This product complies with the standards / regulations below.
<Conformity Directives / Conforming Regulations>
EU Directive:EMC Directive 2014/30/EU
British Legislation:EMC Regulations 2016
Applicable Standards
EN 61000-6-4,EN 61000-6-2
2
CONTENTS OF PACKAGE
Main unit
Instruction Manual (English / Japanese)
Power supply connector
General Information for Safety, Compliance, and Instructions
3
SYSTEM CONFIGURATION
When IO-Link devices are connected to this product, it can get measurement data
and set and get parameters via CC-Link IE Field communication.
This product can also connect to IO-Link-incompatible devices equipped with digi-
tal I/O functionality (ON/OFF signals). It can get the input status of ON/OFF sig-
nals for IO-Link-incompatible devices via CC-Link IE Field communication and
output ON/OFF signals to IO-Link-incompatible devices.
Port 1
Port 2
Port 3
IO-Link devices
Port 4
*: IO-Link-incompatible devices
with digital I/O functionality can
Port 5
also be connected.
Port 6
Port 7
CC-Link IE Field
Port 8
CC-Link IE Field
Note: Non-Panasonic products can also be connected as IO-Link-compatible devices or IO-Link-incompatible devices.
4
FUNCTIONAL DESCRIPTION
22
20
1
2
21
3
4
5
6
7
8
9
19
18
10
11
13
15
12
17
14
16
Name
Function
1
POWER (Green)
Lights up while the power to CC-Link IE Field is ON
2
RUN (Green)
Lights up while CC-Link IE Field is operating normally
Lights up when cyclic transmission is executed during data link operation
3
D LINK (Green)
Blinks when cyclic transmission is stopped during data link operation
Lights up when a CC-Link IE Field communication error occurs
4
ERR. (Red)
Blinks when the station number is changed after the power is turned ON
5
RD (Green)
Lights up while CC-Link IE Field data is being received
6
SD (Green)
Lights up while CC-Link IE Field data is being sent
CC-Link IE Field
• Normal mode
operation indicator
Lights up while the system is normal
7
STS1 (Green)
• Network No. setting mode
Lights up when network No. setting is completed
Blinks when the system is starting in network No. setting mode
• Normal mode
Lights up when a system error occurs
8
STS2 (Red)
• Network No. setting mode
Lights up when the network No. setting is outside the range
Rotary switch for setting a station number or network number
Station No. / Network No. setting
[Factory setting: Station No. 1, Network No. 1]
9
switch
The function is switched by the operation mode set with the mode setting
switch. (Note 1)
Sets the operation mode. [Factory setting: Normal mode]
Switch setting
Operation mode
10
Mode setting switch
Network No.
Network No. setting mode
Station No.
Normal mode
11
Port 2 L ER indicator (Yellow)
Lights up when abnormal data is received
12
Port 1 L ER indicator (Yellow)
13
CC-Link IE Field port 2
RJ45 connector for CC-Link IE Field connection.
14
CC-Link IE Field port 1
There are no restrictions on the order of port 1 and port 2 wiring.
Name
Function
15
Port 2 LINK indicator (Green)
Lights up during link-up.
16
Port 1 LINK indicator (Green)
Supplies power
Pin name
+V
24V power input terminal
IO-Link
17
Power supply connector
-V
0V power input terminal
-V
0V power input terminal
CC-link IE Field
+V
24V power input terminal
F.G.
Frame ground
Pin name
L+
+V (device power supply +V)
DI
Digital input (only PNP output type is supported)
18
IO-Link port (x 8)
IO-Link mode IO-Link communication signal
C/Q
Digital input (only PNP output type is supported)
SIO mode
Digital output (push-pull type)
L-
-V (device power supply 0V)
19
DI indicator (x 8) (Orange)
Lights up when HI level digital input is detected
• IO-Link mode
Lights green during IO-Link communication
Blinks green when no IO-Link device is connected
Lights red when a port error occurs
C/Q indicator (x 8)
20
Blinks red when an IO-Link communication error occurs
(Green / Red / Orange)
• SIO mode
Lights orange when HI level digital input is detected
Lights orange when HI level digital output is generated
Lights red when a port error occurs
RUN/ERR.
Lights green while IO-Link communication is normal
21
IO-Link
(Green / Red)
Lights red when an IO-Link error occurs
operation
Lights green when IO-Link power supply voltage is normal
POWER
22
indicator
Lights red when IO-Link power supply voltage is 18V or lower
(Green / Red)
OFF when IO-Link power supply voltage is 11V or lower
Note: For operation mode settings, refer to "
SETTING NETWORK NO. AND STATION NUMBER FOR CC-Link IE Field".
8
5
INTERNAL CIRCUIT
L+
DI
Insulation
IO-Link port
1 to 8 (Note 1)
IO-Link
CC-Link
C/Q
control
control
circuit
circuit
L-
1 pc.
Non-
Insulated
1 pc.
power
supply
1 pc.
1 pc.
+V
IO-Link
(Note 1)
-V
Power
Non-
supply
-V
CC-Link
Insulated
connector
IE Filed
power
+V
supply
F.G.
Notes: 1) Power to devices (L+, L-), digital I/O (C/Q), and digital input (DI) are supplied from IO-Link (+V, -V) on the
power supply connector.
2) The connector shield of the CC-Link IE Field ports is internally connected to the frame ground (F.G.) of the
power supply connector.
6
MOUNTING ON THE DIN RAIL
Mounting procedure
1. Hook the rear of the mounting part
onto the 35mm width DIN rail.
2. While pressing the rear of the
mounting part down on the 35mm
width DIN rail, fit the front of the
mounting part onto the DIN rail.
2. Press down
35-mm-wide DIN rail
1. Push forward
Removal procedure
1. Grasp the product and push for-
ward.
2. Lift the front to remove.
2. Lift
Note: If you attempt to lift the front without pushing the product forward, you may bend the hook on the back of the
mounting part.
7
CONNECTING THE IO-Link PORTS
Mounting simple wire-press connectors (e-CON)
• This product can connect up to eight devices.
• For the connectors for connecting devices to this product, purchase simple wire-
press connector (e-CON) CN-EP2 (5-piece set) or CN-EP3 (5-piece set) or the
following recommended product.
<Recommended simple wire-press connector (e-CON)>
Model 1473562-4 (e-CON) [manufactured by Tyco Electronics Japan G.K.]
Do not reuse any simple wire-press connectors (e-CON) that have been wire-
pressed once.
The performance of reused simple wire-press connectors cannot be guaranteed.
For the wiring method of simple wire-press connectors (e-CON), refer to the in-
struction manual provided with the connector.
Pin assignment diagram of simple wire-press connector (e-CON)
Pin name
Function
1
L+
+V (device power supply +V)
2
DI
Digital input (only PNP output type is supported)
IO-Link mode IO-Link communication signal
3
C/Q
Digital input (only PNP output type is supported)
SIO mode
1
2
3
4
Digital output (push-pull type)
4
L-
-V (device power supply 0V)
Mounting procedure
1. Insert a simple wire-press connector
(e-CON) into the IO-Link port of this
product until it snaps in.
Function
Function
Removal procedure
1. While holding down the lock release
lever on the simple wire-press con-
nector (e-CON), extract the connector
from this product.
Note: Be sure to hold down the lock release lever when
extracting the simple wire-press connector
(e-CON) from this product.
Extracting the simple wire-press connector
(e-CON) without holding down the lock release le-
ver may damage the connector or break the cable.
8
SETTING NETWORK NO. AND STATION NUMBER FOR
CC-Link IE Field
After changing the settings, always turn the power OFF and then ON.
Set a station number that does coincide with that of any other device connected
within the same network number.
For network settings for CC-Link IE Field, refer to the "SC-LG2-CEF-P User's
Manual" (our Website: https://industry.panasonic.com/ ).
Procedure
1. Turn OFF the power.
CC-Link IE Field
port 1 / 2
2. Set the mode setting switch to "Network No." to enable net-
work No. setting mode.
Connector shield
(Note 2)
3. Turn ON the power. CC-Link IE Field operation indicator STS1
(green) will be blinking.
4. Set the network number with the Station No. / Network No.
setting switch. The setting range for network numbers is 1 to
239 (decimal).
(0 and 240 or more will result in an error)
Set the network number in hexadecimal.
The "×1" switch sets the 1st digit of the network number.
0 to F (hex) are valid.
The "×16" switch sets the 2nd digit of the network number.
0 to E (hex) are valid.
Example: To set to "239" (decimal), set to "EF" (hex).
5. Set the mode setting switch to "Station No.".
The network number will be written to this product. Once the
network number has been saved to this product, CC-Link IE
Field operation indicator STS1 (green) will stop blinking and
then remain lit.
6. Turn OFF the power.
7. Check that the mode setting switch is set to "Station No.".
8. Set the station number with the Station No. / Network No. set-
ting switch. The setting range for the station number is 1 to
120 (decimal). (0 and 121 or more will result in an error)
1. Insert
Set the station number in decimal.
The "×1" switch sets the 1st digit of the station number. 0 to
9 (decimal) are valid.
The "×10" switch sets the 2nd and following digits of the
station number. 0 to C are valid. (A = 10, B = 11, C = 12)
Example: To set to "119" (decimal), set to "B9".
9. Turn ON the power. CC-Link IE Field communication will be started with the net-
work number and station number that have been set.
9
CONNECTING THE CC-Link IE Field PORTS
For the Ethernet cable, use a cable recommended by CC-Link Partners Association.
Always run the Ethernet cable through a conduit or secure the cable with clamps.
If not secured as indicated above, any force or tension on the cable may damage
the CC-Link IE Field host device, this product, or the cable.
published by the CC-Link Partner Association.
Ethernet cable
How to connect
1. Hold the connector of the Ethernet cable and
align the lock release lever of the Ethernet ca-
ble with the groove in CC-Link IE Field port 1
or port 2.
2. Insert the connector until it snaps in.
Removal procedure
1. Press on the lock release lever on the Ethernet
cable and pull out.
Note: Attempting to pull out the connector without pressing the lock release lever may cause the lock release lever to
break.
Do not use an Ethernet cable if the lock release lever is broken. Do not grasp the cable to pull, as this may cause
wire breakage in the cable.
10
CONNECTING THE POWER CABLE
Connection
SC-LG2-CEF-P
IO-Link port
Pin assignment diagram for the power supply
Simple wire-press
connector (accessory)
connector
(e-CON)
Pin name
1
CN-EP
1
+V
24V power input terminal for IO-Link
2
2
-V
0V power input terminal for IO-Link
3
3
-V
0V power input terminal for CC-Link IE Field
4
4
+V
24V power input terminal for CC-Link IE Field
5
5
F.G.
Frame ground
<Recommended power supply connector>
Product equivalent to MC1.5/5-ST-3.5AU
[Manufactured by Phoenix Contact K.K.]
When connecting the power supply connector (accessory), use solid wires, or
stranded wires (lead wires) with a ferrule (sleeve) terminal (obtain separately) at-
Tighten the screws on the power supply connector by turning them clockwise to
Lock release lever
When inserted correctly, the wire is locked and cannot be pulled out. Take care
not to pull with excessive force, as the wire may break.
To disconnect single wires or stranded wires (lead wires), loosen the screws on
the power supply connector by turning them counterclockwise, and then pull out
the wires (lead wires).
The following tool and single wires or stranded wires are recommended.
Tightening tool: Flat-head screwdriver [0.4 (blade width) × 2.5mm]
2
Wire size: 0.25 to 1.3mm
(AWG 23 to 16)
Mounting procedure
1. Insert the power supply connector into
the power supply port of this product.
11
SPECIFICATIONS
Product name
Model
Supply voltage
Unit current consumption
On the IO-Link side: 150mA or less, on the CC-Link IE Field side: 200mA or less
Allowable passing current
Blinking
Communication method
Remote station type
Number of cyclic commu-
RX / RY: Max. 112 points (112 bits) / Max. 112 points (112 bits)
nication link points
RWr / RWw: Max. 132 points (132 words) / Max. 132 points (132 words)
Transient transmission
Number of ports
Communication speed
Maximum distance
between stations
Communication method
Number of ports
Communication speed
Maximum cable length
Current supplied to IO-
Link device (L+, L-)
Digital I/O (C/Q)
IO-Link mode
(Note 2)
SIO mode
Digital input (DI)
Lit
Ambient temperature
Ambient humidity
Grounding method
Material
Weight
Notes: 1) Take care that the total consumption current of connected devices and the unit on the IO-Link side does not
exceed the allowable passing current.
Power to devices (L+, L-), digital I/O (C/Q), and digital input (DI) are supplied from IO-Link (+V, -V) on the
power supply connector.
2) Both digital I/O (C/Q) and digital input (DI) operation must be set up with CC-Link IE Field.
For information about how to set up digital I/O (C/Q) operation, refer to the "SC-LG2-CEF-P User's Manual"
(our Website: https://industry.panasonic.com/ ).
12
CAUTIONS
This product has been developed / produced for industrial use only.
When noise generating equipment (switching regulator, inverter motor, etc.) is used in the
vicinity of this product, ground each frame ground (F.G.) terminal on the equipment individ-
ually.
Make sure that the power is OFF while performing wiring or connection work.
Risk of damage and burning if the load is incorrectly wired or short-circuiting occurs.
Do not wire in parallel with a high-voltage line or power line, or run through the same con-
duit. Risk of malfunctioning due to induction.
This product is suitable for indoor use only.
Avoid dust, dirt, and steam.
Do not use in locations where there are corrosive or other harmful gases.
Ensure that the product does not come into contact with organic solvents such as thinner.
Ensure that the product does not come into contact with strong acid or alkaline.
Ensure that the product does not come into contact with oil or grease.
Ethernet
cable
Do not drop or otherwise subject to shock. Risk of product damage.
Do not apply stress such as excessive bending or pulling to the connector base of a cable
Groove
such as the Ethernet cable, IO-Link connection cable, and power cable.
Risk of damage and connection failure.
Lock release lever
Never attempt to disassemble, repair, or modify the product.
When the product becomes unusable or unneeded, dispose of the product appropriately as
industrial waste.
Design the system to allow the addition of external safety circuits and other means of pro-
tection against system trouble.
Lock release lever
Panasonic Industry Co., Ltd.
1006, Oaza Kadoma, Kadoma-shi, Osaka 571-8506, Japan
https://industry.panasonic.com/
Please visit our website for inquiries and about our sales network.
Panasonic Industry Co., Ltd. 2024
April, 2024
Flat-head
screwdriver
Power supply
connector
(Accessory)
Function
Lead wire
insertion hole
Ferrule (sleeve)
Lead wire
terminal
Please obtain
separately
SC-LG2-CEF-P
Power supply port
Power supply
connector
IO-Link master unit for CC-Link IE Field
SC-LG2-CEF-P
24V DC
+10
% Ripple P-P 10% or less
-15
On the IO-Link side: 3A or less (Note 1)
CC-Link IE Field
Intelligent device station
For server function only, message size: 2 Kbytes (maximum)
1000BASE-T Ethernet port × 2
1Gbps
100m
IO-Link v1.0 / v1.1
e-CON-compliant connector port for IO-Link × 8
COM1 (4.8kbps), COM2 (38.4kbps), COM3 (230.4kbps)
Automatically set by IO-Link device
20m
200mA per port (maximum) (Note 1)
Compliance with the IO-Link standard
-10 to +55ºC (No condensation or icing), Storage: -20 to +70ºC
35 to 85% RH, Storage: 35 to 85% RH
Power supply connector is equipped with a frame ground (FG)
RJ45 connector shield: Directly connected to frame ground
Case: Polycarbonate
Approx. 210g
PRINTED IN JAPAN
Need help?
Do you have a question about the SC-LG2-CEF-P and is the answer not in the manual?
Questions and answers