OZPCS-RS40 Installation and Commissioning Checklist
Unit Model Number
____________________________
Unit Serial Number
____________________________
Installation Date
____________________________
This checklist is intended as a quick reference guide to assist installation and commissioning of OZPCS-RS40 power conversion systems. It
is not a substitute for thorough user's manual review and system-level engineering. If in doubt at any step, consult the user's manual. If the
user's manual does not fully address your concern, please contact Oztek Corp Applications Engineering at
603. 546. 0090 for assistance.
PCS INSTALLATION
(individual unit)
Step
Name
☐
1 Installation
Environment
☐
2 DC and AC Voltages
☐
3 Unpacking
☐
4 PCS Installation
DR-0158 OZPCS-RS40 Installation and Commissioning Checklist
Rev. A
Description
Ensure installation site meets environmental
and physical constraints specified in user's
manual.
Verify that battery voltage range and nominal
AC grid voltage are within PCS operating voltage
range specified in user's manual.
Verify that packaging is not damaged and verify
the PCS's condition after unpacking.
Install the PCS into the equipment rack. Be sure
to only use Oztek supplied/authorized fasteners
for securing mounting ears or brackets to the
PCS. Verify adequate unit support for the
application (rack shelf and/or rear mounting
brackets) and ensure mounting bolts are
properly tightened.
TechSupport@oztekcorp.com
Notes
OztekCorp.com
or
Need help?
Do you have a question about the OZPCS-RS40 and is the answer not in the manual?
Questions and answers