Page 1
Top Rail Water Inlet (6 Star) Prior To Installation The Mizu Drift Twin Rail Shower must be installed to the requirements of AS/NZS 3500.1 by a qualified plumber. It comes to you already factory assembled and tested. We do not recommend the dismantling of any internal part of the product.
Page 2
8. Drill the fixing plate securely to the wall. 9. Unscrew and remove the adaptor collar from the fixing plate. Mizu - Drift Twin Rail Shower 250mm ABS Overhead with Top Rail Water Inlet (6 Star) Page 02 of 04...
Page 3
13. Connect the flexible hose and handshower to complete the installation. 14. Turn on water supply to rail to check operation and for any leak. Mizu - Drift Twin Rail Shower 250mm ABS Overhead with Top Rail Water Inlet (6 Star) Page 03...
Page 4
Refer to Warranty Conditions Plumbers, please ensure a copy of the installation instruction is left with the end user for future reference. Mizu - Drift Twin Rail Shower 250mm ABS Overhead with Top Rail Water Inlet (6 Star) Page 04 of 04...
Need help?
Do you have a question about the 4205576 and is the answer not in the manual?
Questions and answers