Staining could occur if this were to happen. Fortress Building Products DOES NOT cover all possible installation scenarios within these instructions. In some cases, it may be necessary for you to consult a professional engineer, building code official, or local dealer.
INSTALLATION: BLOCKING EXAMPLES DETAIL: E DETAIL: F DETAIL: G DETAIL: H INSTALLATION: RAILING POST WITH THROUGH BOLT KIT DETAIL: A DETAIL: B Step 1: Mount Posts 1. Position the edge of each post base plate 1/2" [13mm] from the Joist or beam edges. As shown in Fig. 2. 2.
Page 5
INSTALLATION: RAILING POST WITH TOGGLE BOLT Fig. 2 Step 1: Mount Posts 1/2" [13mm] 1. Position the post over the joist to have the mounting holes Offset on the base plate be a minimum of 1" from the edge of the joist.
To obtain and review a copy of the warranty, please go to: https://Fortressbp.com/warranties. You can also contact: (844) 909-1999 or write to: Fortress Building Products Warranty, 1720 N 1st St, Garland, TX 75040 to obtain a copy of the warranty. EVOLUTION THROUGH BOLT & TOGGLE BOLT KITS INSTALLATION...
Need help?
Do you have a question about the EVOLUTION THROUGH BOLT & TOGGLE BOLT KITS and is the answer not in the manual?
Questions and answers