Page 1
THANK YOU We appreciate the trust and confidence you have placed in HDX through the purchase of this Medium-Duty Steel Shelving Unit. We strive to continually create quality products designed to enhance your home. Visit us online to see our full line of products available for your home...
1 YEAR LIMITED WARRANTY If within one year from the date of purchase, This HDX Shelf fails due to a defect in materials or workmanship, please immediately contact Product Support at 773-475-3131 (7am to 5pm, M-F except normal Holidays) or go to www.edsal.com for assistance. Warranty parts are available for direct replacement.
Pre-Installation PACKAGE CONTENTS Anti-Tip Hardware Kit (Includes installation guide) Part Description Quantity Part Number Post URPS36-SV Brace URBR18WD-SV Beam URBM42WD-SV Laminate Board Decking RPB1842B9MM Post Coupler CPOUT-SV Post Foot FP-HP Post Cap RL-PC-B1.4 Anti-Tip Hardware Kit with Installation Guide ATHKIT-L5 BRAND SPECIFIC URL Please contact [Brand Specific Phone Number/must match cover] for further assistance.
Pre-Installation (continued) ALTERNATE SETUP This unit can also be assembled as two separate 36 in. high units. One unit will have three shelves and the other will have two shelves. If choosing this option, follow assembly steps 2, 3, 4, and 5 until all shelf levels are completed for both units. NOTE: Post Coupler (E), Post Foot (F) and Post Cap (G) are not used for this setup.
Page 5
Assembly (continued) ASSEMBLE BRACES TO POSTS □ Assemble Brace B (x2) to the pair of posts, making sure the post feet are at the bottom and the narrow end of the post slots are facing down. IMPORTANT: Make sure each pair of braces (B) are installed at the same height on each set of posts (A).
Page 6
Assembly (continued) ASSEMBLE BEAMS TO POSTS □ Assemble Beam C (x2) to the pair of post assemblies at the same height location as the previously installed braces. IMPORTANT: Make sure each pair of beams (C) are installed at the same height as the previous installed set of braces on each set of posts.
Page 7
Assembly (continued) ASSEMBLE LAMINATE BOARD DECKING □ Install the Laminate Board Decking D (x1) onto the recessed ledge of the beams and braces. ✓ ASSEMBLE NEXT SHELF LEVEL □ Assemble the next shelf level by repeating steps 2, 3, and 4 at the desired location. □...
Page 8
Assembly (continued) ASSEMBLE POST COUPLERS □ Assemble Post Couplers E (x4) to the assembled four posts by inserting the rolled-form grooves of the post couplers onto the posts. □ Orientation of the post coupler does not matter. NOTE: Use a rubber mallet to help ✓...
Page 9
Assembly (continued) ASSEMBLE FINAL SHELF LEVELS □ Assemble the final three shelf levels by repeating steps 2, 3, and 4 at the desired location, using B (x2), C (x2), and D (x1) per level. □ Follow each of those steps as indicated. ASSEMBLE POST CAPS □...
Maintenance □ Periodically check to make sure all parts are securely in place. Care and Cleaning □ Wipe down with a clean cloth to remove dust. □ A damp cloth may be used to clean off dirt. Do not use harsh cleaning products on this unit. Questions, problems, missing parts? Before returning to the store, contact our direct Manufacturing Partner’s Customer Service 7 a.m.
Need help?
Do you have a question about the URHD421872L5-SV and is the answer not in the manual?
Questions and answers