Dawson EGRS Owner's Manual

Safety lifting equipment

Advertisement

Quick Links

EGRS
safety lifting equipment
4t
7.5t
10t
owners manual
operators instructions
spare parts list
safety precautions
maintenance
euro ground release shackle
DAWSON CONSTRUCTION PLANT LTD.
CHESNEY WOLD,
BLEAK HALL
MILTON KEYNES
MK6 1NE, ENGLAND
TEL: +44 (0) 1908 240300
FAX: +44 (0) 1908 240222
EMAIL: DAWSON@DCPUK.COM
Original Instructions
Rev. 009

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EGRS and is the answer not in the manual?

Questions and answers

Summary of Contents for Dawson EGRS

  • Page 1 7.5t owners manual operators instructions spare parts list safety precautions maintenance euro ground release shackle DAWSON CONSTRUCTION PLANT LTD. CHESNEY WOLD, BLEAK HALL MILTON KEYNES MK6 1NE, ENGLAND TEL: +44 (0) 1908 240300 FAX: +44 (0) 1908 240222 EMAIL: DAWSON@DCPUK.COM Original Instructions Rev.
  • Page 2: Preface

    ID plate located on the product. The descriptions and specifications in this manual are subject to change without notice. Dawson reserves the right to improve products. Some product improvements may have taken place after this manual was printed.
  • Page 3: Ec Declaration Of Conformity

    Essential Health and Safety Requirements of the applicable EC Directive(s) and that the required conformity assessment procedures have been carried out. This declaration ceases to be valid if alterations are made to the machinery/equipment without agreement with Dawson Construction Plant Ltd. Category: Lifting Equipment...
  • Page 5: Table Of Contents

    Maintenance & storage Technical Specs 14-16 Parts list 17-18 A guide to changing the pull wire on a dawson ground release shackle Under separate cover: · Individual Test Certificate & Thorough Examination if required. . E.C. Declaration of Conformity www.dcpuk.com...
  • Page 6: Introduction & Features

    www.dcpuk.com introduction This robust pile lifting shackle was designed and developed over many years of site use and abuse. The use of these shackles compliments the “Feet on the Ground” approach to steel erection and pile installation. When used in conjunction with the Sheet Pile Threader, there is no need for site operatives to go above the safety of top frame level for interlocking sheet piles or releasing the lifting shackles.
  • Page 7: Method Of Operation

    method of operation 1. Tie a length of soft rope to the pull ring on the pull wire. The rope should be 1 metre (3 feet) longer than the pile length. Do not use a continuous loop as this will become snagged. 2.
  • Page 8: Lifting Piles Correctly

    www.dcpuk.com lifting piles correctly LIFTING PAIRS OF PILES Prior to any lift, consult the lift planner. When lifting sheet piles in pairs, it is necessary to use a pair of shackles. The ring at the top of the sling can be hooked directly onto a standard crane hook block, D shackle or fork anchor.
  • Page 9 continued-lifting piles correctly SAFE SAFE Axial loading Lifting off a stack at 90 to the axis of the pile ALL ‘Z’ PROFILES TUBE PILE 3 o’clock 9 o’clock postion postion ALL ‘U’ or ‘LARSSEN’ ‘H’ PILE PROFILES www.dcpuk.com...
  • Page 10: Safety Checklist

    www.dcpuk.com safety check list 1) PRE-INSTALLATION CHECKS Prior to installing a shackle onto any steelwork, check the following: a. Ensure a competent person has conducted a visual inspection of the shackle and has authorised the shackle for use. If any doubts arise, do not use.
  • Page 11 continued - safety check list 6) Care should be taken to avoid the pull ropes getting snagged. 7) The angle between the two legs of the lifting strap, where applicable, should not exceed 90°. 8) Ensure that all appropriate laws, bye-laws and regulations are complied with.
  • Page 12: Installation Diagram

    www.dcpuk.com installation diagram FITTING SHACKLE TO ‘U’ SHEET PILE Indicator bar out. 1. Slide throat of When retracted, shackle over top of do not lift! sheet pile Hole position to suit diameter of appropriate shackle 2. Align shackle 3. Tap the indicator plunger with sheet pile bar with a hammer to lifting hole...
  • Page 13: Release Diagram

    release diagram FITTING SHACKLE TO ‘U’ SHEET PILE Pile correctly 1. Flick the release positioned rope away from the top of the pile to disengage the safety ring 2. A firm pull on the release rope will Release rope retract the plunger. The indicator bar will protude out Shackle is now...
  • Page 14: Training

    www.dcpuk.com training Before allowing operators to use the Shackle, it is important to ensure they have received basic training in lifting and control of heavy loads. It is strongly recommended that the following areas are covered: 1. Basic safety in lifting operations. 2.
  • Page 15: Maintenance & Storage

    maintenance & storage The Shackle is manufactured from high quality material and assembled in a manner designed to offer long service with minimal maintenance. In order to preserve the product in this state, it is necessary to ensure that it is not mis-used or used for purposes outside its recommended use.
  • Page 16: Technical Specs

    STANDARD SHACKLES Part No. 5983A/A - 4T EGRS 150 Throat General Assembly 5984A/A - 7.5T EGRS 150 Throat General Assembly 5985A/A - 10T EGRS 150 Throat General Assembly 5986A/A - 7.5T EGRS 250 Throat General Assembly 5987A/A -...
  • Page 17 continued - technical spec. DRAWING No. 5983 5984 5985 5986 5987 5987A/AL 5990 5991 5992 5993 TYPE STANDARD LOW TEMP. WIDE THROAT (COLOUR) (RED) (BLUE) (YELLOW) WEIGHT 17.5 17.5 17.5 21.5 21.5 21.5 21.5 21.5 17.5 17.5 Ø22 Ø28 Ø35 Ø28 Ø35 Ø35...
  • Page 18 www.dcpuk.com GENERAL ASSEMBLY...
  • Page 19: Parts List

    STANDARD SHACKLES * Not available for part resale. Item No. Part Name 5983A/A 5984A/A 5985A/A 5986A/A 5987A/A *EGRS Machined Casting 5903 5904 5905 5906 5907 Tube Assembly 5922A-B Plunger 5908 5909 5913 5909 5913 Sleeve 5931 Detent Pin...
  • Page 20 www.dcpuk.com continued - parts list Detent Pin 5919-01 Detent Spring 6935 Release Nut 5953 Release Cap 5954 Split Ring 0M38SPLITRING Ref. No Part Name Remark OPTIONAL REMOTE RELEASE DETENT KIT 5919-01A GENERAL ASSEMBLY DRAWING No. GRS-017...
  • Page 21 EGRS ground release shackle 4t /7.5t /10t A GUIDE TO CHANGING THE PULL WIRE ON A DAWSON GROUND RELEASE SHACKLE DAWSON CONSTRUCTION PLANT LTD. CHESNEY WOLD, BLEAK HALL MILTON KEYNES MK6 1NE, ENGLAND TEL: +44 (0) 1908 240300 FAX: +44 (0) 1908 240222...
  • Page 22 The Pull Wire may require changing if it is frayed, kinked or generally damaged. First remove the guide key. Unscrew the M6 cap head screw and washer. The guide key can now be retracted. Remove the plug from the underside of the shackle body.
  • Page 23 Remove the 4 No. M8 cap head screws holding the tube assembly to the shackle body. Carefully retract the assembly from the body as shown. The sleeve is attached to the plunger via a coiled pin. This needs to be removed.
  • Page 24 Drive the coiled pin out using a 5mm punch. REMEMBER TO WEAR EYE PROTECTION! With the sleeve removed the old Pull Wire can be extracted. IMPORTANT: The new Pull Wire tail must be threaded through the largest ring to ensure correct orientation at final assembly.
  • Page 25 The sleeve can now be replaced and coiled pin hammered back in place. A new coiled pin may be required if the old one is damaged. IMPORTANT: Ensure the coiled pin is flush on both sides of the sleeve, this will allow smooth operation in the shackle body.
  • Page 26 Finally check correct operation of the mechanism. Gloves should be worn for these operations! First operate the Pull Wire to retract the plunger. This requires reasonable force. The plunger should remain in the retracted position. A tap with a soft hammer should fire the plunger forward.
  • Page 27 notes...
  • Page 28 CFA CLEANERS PILE POINTS & SPLICERS SAFETY HANDLING / LIFTING EQUIPMENT SHEET PILE THREADERS ground release shackle 4t /7.5t /10t DAWSON CONSTRUCTION PLANT LTD. CHESNEY WOLD, BLEAK HALL MILTON KEYNES MK6 1NE, ENGLAND TEL: +44 (0) 1908 240300 FAX: +44 (0) 1908 240222...