ID plate located on the product. The descriptions and specifications in this manual are subject to change without notice. Dawson reserves the right to improve products. Some product improvements may have taken place after this manual was printed.
Essential Health and Safety Requirements of the applicable EC Directive(s) and that the required conformity assessment procedures have been carried out. This declaration ceases to be valid if alterations are made to the machinery/equipment without agreement with Dawson Construction Plant Ltd. Category: Lifting Equipment...
Maintenance & storage Technical Specs 14-16 Parts list 17-18 A guide to changing the pull wire on a dawson ground release shackle Under separate cover: · Individual Test Certificate & Thorough Examination if required. . E.C. Declaration of Conformity www.dcpuk.com...
www.dcpuk.com introduction This robust pile lifting shackle was designed and developed over many years of site use and abuse. The use of these shackles compliments the “Feet on the Ground” approach to steel erection and pile installation. When used in conjunction with the Sheet Pile Threader, there is no need for site operatives to go above the safety of top frame level for interlocking sheet piles or releasing the lifting shackles.
method of operation 1. Tie a length of soft rope to the pull ring on the pull wire. The rope should be 1 metre (3 feet) longer than the pile length. Do not use a continuous loop as this will become snagged. 2.
www.dcpuk.com lifting piles correctly LIFTING PAIRS OF PILES Prior to any lift, consult the lift planner. When lifting sheet piles in pairs, it is necessary to use a pair of shackles. The ring at the top of the sling can be hooked directly onto a standard crane hook block, D shackle or fork anchor.
Page 9
continued-lifting piles correctly SAFE SAFE Axial loading Lifting off a stack at 90 to the axis of the pile ALL ‘Z’ PROFILES TUBE PILE 3 o’clock 9 o’clock postion postion ALL ‘U’ or ‘LARSSEN’ ‘H’ PILE PROFILES www.dcpuk.com...
www.dcpuk.com safety check list 1) PRE-INSTALLATION CHECKS Prior to installing a shackle onto any steelwork, check the following: a. Ensure a competent person has conducted a visual inspection of the shackle and has authorised the shackle for use. If any doubts arise, do not use.
Page 11
continued - safety check list 6) Care should be taken to avoid the pull ropes getting snagged. 7) The angle between the two legs of the lifting strap, where applicable, should not exceed 90°. 8) Ensure that all appropriate laws, bye-laws and regulations are complied with.
www.dcpuk.com installation diagram FITTING SHACKLE TO ‘U’ SHEET PILE Indicator bar out. 1. Slide throat of When retracted, shackle over top of do not lift! sheet pile Hole position to suit diameter of appropriate shackle 2. Align shackle 3. Tap the indicator plunger with sheet pile bar with a hammer to lifting hole...
release diagram FITTING SHACKLE TO ‘U’ SHEET PILE Pile correctly 1. Flick the release positioned rope away from the top of the pile to disengage the safety ring 2. A firm pull on the release rope will Release rope retract the plunger. The indicator bar will protude out Shackle is now...
www.dcpuk.com training Before allowing operators to use the Shackle, it is important to ensure they have received basic training in lifting and control of heavy loads. It is strongly recommended that the following areas are covered: 1. Basic safety in lifting operations. 2.
maintenance & storage The Shackle is manufactured from high quality material and assembled in a manner designed to offer long service with minimal maintenance. In order to preserve the product in this state, it is necessary to ensure that it is not mis-used or used for purposes outside its recommended use.
STANDARD SHACKLES * Not available for part resale. Item No. Part Name 5983A/A 5984A/A 5985A/A 5986A/A 5987A/A *EGRS Machined Casting 5903 5904 5905 5906 5907 Tube Assembly 5922A-B Plunger 5908 5909 5913 5909 5913 Sleeve 5931 Detent Pin...
Page 20
www.dcpuk.com continued - parts list Detent Pin 5919-01 Detent Spring 6935 Release Nut 5953 Release Cap 5954 Split Ring 0M38SPLITRING Ref. No Part Name Remark OPTIONAL REMOTE RELEASE DETENT KIT 5919-01A GENERAL ASSEMBLY DRAWING No. GRS-017...
Page 21
EGRS ground release shackle 4t /7.5t /10t A GUIDE TO CHANGING THE PULL WIRE ON A DAWSON GROUND RELEASE SHACKLE DAWSON CONSTRUCTION PLANT LTD. CHESNEY WOLD, BLEAK HALL MILTON KEYNES MK6 1NE, ENGLAND TEL: +44 (0) 1908 240300 FAX: +44 (0) 1908 240222...
Page 22
The Pull Wire may require changing if it is frayed, kinked or generally damaged. First remove the guide key. Unscrew the M6 cap head screw and washer. The guide key can now be retracted. Remove the plug from the underside of the shackle body.
Page 23
Remove the 4 No. M8 cap head screws holding the tube assembly to the shackle body. Carefully retract the assembly from the body as shown. The sleeve is attached to the plunger via a coiled pin. This needs to be removed.
Page 24
Drive the coiled pin out using a 5mm punch. REMEMBER TO WEAR EYE PROTECTION! With the sleeve removed the old Pull Wire can be extracted. IMPORTANT: The new Pull Wire tail must be threaded through the largest ring to ensure correct orientation at final assembly.
Page 25
The sleeve can now be replaced and coiled pin hammered back in place. A new coiled pin may be required if the old one is damaged. IMPORTANT: Ensure the coiled pin is flush on both sides of the sleeve, this will allow smooth operation in the shackle body.
Page 26
Finally check correct operation of the mechanism. Gloves should be worn for these operations! First operate the Pull Wire to retract the plunger. This requires reasonable force. The plunger should remain in the retracted position. A tap with a soft hammer should fire the plunger forward.
Need help?
Do you have a question about the EGRS and is the answer not in the manual?
Questions and answers