NECESSARY TOOLS AND SAFETY GEAR(NOT SUPPLIED) Ladder Pistol drill Utility knife Goggles & Gloves Electric drill + 12mm concrete drill bit Spirit level Helmet Tape measure Monkey wrench 2D FOOTING MEASUREMENT (dimensions in mm)
Page 3
3D FOOTING MEASUREMENT (dimensions in mm) PRECAUTION OF USE This product should not be used in extreme weather: storms, violent winds, hail, and snow.We guarantee the resistance of the pergola for winds up to 60 km/h and a maximum snow weight of 50kg/m².
TIPS AND SAFETY INSTRUCTIONS Depending on the location and surface area, construction may be subject to building permits. Make sure you have checked with your local authorities to obtain the needed information before the assembly. Product assembly : • At least 2/3 people required •...
WARRANTY This warranty does not cover : • Normal wear and tear inherent from the products. • Loss or breakage of any part during unpacking or installation. • Lack of care, neglect, vandalism, impact with foreign body, force, contact with a brasives material, product aesthetics, disassembly, rebuilding or relocation.
Page 9
Diagram Diagram Diagram ZO-1 LO-1 ZO-2 lock nut ZO-5 6×35 10-12mm The illustration uses a manual wrench, which can be replaced with an electric P-tip. Install the spindles for the louver cover on both sides of the louvres. Note: To avoid any broken of the plastic parts(MO), when use the pistol drill, please reduce the twisting force of it .
Page 10
Diagram Diagram Diagram GO-1 ZO-9 ZO-10 5×6 SO-1 Install the louver cover on both sides of the installed louvres and the spindle louver cover on both sides of the louvres. ×1 LO-1 GO-1 ZO-9 ZO-9 GO-1 GO-1 LO-1 SO-1 SO-1 LO-1 ×24 ZO-9...
Page 11
Diagram Diagram Diagram ZO-1 ZO-2 XO-1 6×35 Install the post skirt first, put the notch of the post skirt against the notch of the post, and then install the base plate to fix it to the bottom surface of the post. XO-1 ZO-1 ZO-2...
Page 12
Diagram Diagram Diagram ZO-3 ZO-4 Placing the post flat on the ground,complete the installation of the side beams. ZO-4 ZO-3...
Page 13
Diagram Diagram Diagram ZO-3 BO-1 ZO-4 Put up the completed side beams and then install the main beams at each end. BO-1 ZO-3 ZO-4...
Page 14
Diagram Install the louvres with spindles first, placing one side completely into the hole cut in the beam and then the other end. LO-1 GO-1 GO-1 GO-1 GO-1...
Page 15
Diagram Diagram Diagram ZO-1 ZO-2 6×45 Locate the openings on the outside of the main beam and attach the holes of the connectors to the spindle, then install the plastic case and gearbox.
Page 16
Diagram ICON lock nut Attach the connecting rod to the side of the spindle louvre. GO-1 GO-1...
Page 17
ICON UO-2 UO-4 Attach the connecting rod to the side of the spindle louvre. UO-4 UO-4 UO-2 UO-2...
Page 18
Diagram Diagram 10×80 1. Cover the end caps on the beam. 2. Use the plastic cover to cover the screw holes where the beam is connected to the column. 3. Move the bottom of the columns according to the dimensions on the front page to ensure that the dimensions are the same, then use a 12mm impact drill bit to guide the holes, then put in the expansion screws and tighten them with a M17 spanner.