Page 1
[4] Foam Mat [4] Leveling Feet [12] Short Screws [2] Tape [1] Tool [3] Doors (60C) [4] Doors (75 and 90U) DESIGNED IN LOS ANGELES, USA MADE IN CHINA IMPORTANT! Work with a partner and be careful of sharp edges.
Page 2
STEP 1 Begin by laying the flat side of the back frame on the ground. Insert the Drilled Short Bars with the holes facing downwards into the far left and right slots of the bottom of the frame. Insert the long bars into the bottom of the stand with the screws facing downwards. The bars should sit flush against the outside edges.
Page 3
Please consult a qualified professional if you are unsure about the installation process. DESIGNED IN LOS ANGELES, USA MADE IN CHINA ULTUM NATURE SYSTEMS...
[6] Leveling Feet [10] Short Screws [2] Tape [1] Tool [4] Doors (120P and 120U) [5] Doors (150 and 180) DESIGNED IN LOS ANGELES, USA MADE IN CHINA IMPORTANT! Work with a partner and be careful of sharp edges. ULTUM NATURE SYSTEMS...
Page 5
STEP 1 Begin by laying the flat side of the back frame on the ground. Insert the Drilled Short Bars with the holes facing downwards into the far left and right slots of the bottom of the frame. Insert the long bars into the bottom of the stand with the screws facing downwards. The bars should sit flush against the outside edges.
Page 6
Please consult a qualified professional if you are unsure about the installation process. DESIGNED IN LOS ANGELES, USA MADE IN CHINA ULTUM NATURE SYSTEMS...
Need help?
Do you have a question about the 60C and is the answer not in the manual?
Questions and answers