Green Heat pellet fire dimensions
Product Illustration
A standard power cord is located on the back right (when facing the fire) of the pellet fire
Minimum framing dimensions and clearances
Minimum clearances to combustible materials
Back 150mm
Side 75mm
f
c
Minimum clearance required for flue terminals
a Bellow eaves, balconies or other projections
b From the ground or above a balcony
c From a return wall or external corner
d From a gas meter (M)
e From an electricaity meter or fuse box (P)
f
From a drain or soil pipe
g Horizontal from an building structure
h
From any other flue terminal, cowl or cobustion air intake
Green Heat Pellet Fire
Quick Step Installation Guide
Front
Front 1,000mm
j
j
Openable
Window
Door
k
b
T
Flue Terminal
300 mm
300 mm
500 mm
1000 mm
500 mm
150 mm
500 mm
500 mm
Side
j
h
c
h
P
h
Indicates areas for ue terminals
j
Horizontally from an openable window, door, or non-mechanical
air inlet, or any other opening into a building, with the exception
of sub floor ventilations
k
Vertically below an openable widow, door,or non-mechanical
air inlet, or any other opening into a building, with the exception
of sub-floor ventilations
l
Minimum horizontal clearance to any surface
(such as an exterior wall) for vertical terminations
m Minimum height above roof line for vertical termination 600 mm
525mm
Top
l
a
m
a
c
d
M
g
d
c
500 mm
150 mm
610 mm
heatmaster.com.au
Need help?
Do you have a question about the Green Heat and is the answer not in the manual?