GivEnergy GIV-SME-30/69-ID Installation Manual

Commercial all in one

Advertisement

COMMERCIAL ENERGY STORAGE SOLUTIONS
INSTALLATION MANUAL
COMMERCIAL ALL IN ONE
V1.0 20.11.24 | UK
GIV-SME-30/69-ID

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GIV-SME-30/69-ID and is the answer not in the manual?

Questions and answers

Summary of Contents for GivEnergy GIV-SME-30/69-ID

  • Page 1 COMMERCIAL ENERGY STORAGE SOLUTIONS INSTALLATION MANUAL COMMERCIAL ALL IN ONE V1.0 20.11.24 | UK GIV-SME-30/69-ID...
  • Page 2: Products Covered

    It is critical that the below instructions are fully read and understood. of the GivEnergy Commercial All in One, referred to as CAIO for the remainder of this manual and its Only trained and qualified electricians can install or maintain the system sub-components.
  • Page 3 INTRODUCTION TO THE GIVENERGY CAIO SINGLE LINE DIAGRAM EXAMPLE The CAIO is designed to be an easy to install expandable energy storage system to fill the gap between residential and larger commercial storage systems. Each CAIO contains 69kWh of batteries and 30kW of inverter built-in to a slimline cabinet much like a computer server cabinet.
  • Page 4: General Data

    Rated current Maximum altitude 4000m (derating above 3000m) Rated grid voltage 400v Standby power consumption <10W Grid voltage range 300-400v GIV-SME-30/69-ID Rated grid frequency 50/60Hz Protection class IP20 Current total harmonic distortion rate <3% (at rated power) Certification Power factor >0.99...
  • Page 5 ALL IN ONE CABINET KEY FEATURES INTERIOR DESCRIPTION Installation Diagram of Main Components Inside the SME Cabinet MCB & surge protection 50kW PCS Status lights High voltage box Door handle Battery 1 Emergency stop (EPO) Battery 2 Battery 3 Battery 4 Battery 5 Battery 6 Battery 7...
  • Page 6: Delivery And Unpacking

    DELIVERY AND UNPACKING DELIVERY AND UNPACKING The CAIO and battery packs are delivered on 2 separate pallets. Forklift Transportation The CAIO will be delivered palletised in a cardboard box; During transportation, ensure the box’s centre of gravity is positioned between the forklift’s two forks Avoid long-distance transportation or traveling on sloped roads with the forklift Remove all packaging and foam protection Handle with care during lifting and lowering to avoid impact or vibration...
  • Page 7: Installation Environment

    INSTALLATION ENVIRONMENT AC ASSEMBLY AND CONNECTIONS To ensure optimal operation and lifetime of the system it must be installed in an environment that Assembly and connections meets the following criteria at a minimum; Power is connected on the top of the CAIO cabinet, remove the plug out of the socket and use suitable cable to wire the CAIO to a electrical supply, details of ratings in the below table.
  • Page 8 CONNECTION BETWEEN AC INPUT AND COMMS CABLE FITTING THE EMS AC Input and Communication Port Locations Each system or group of CAIO’s will require one EMS-C for control. The EMS-C is fitted to one cabinet only within a system, all cabinets are delivered exactly the same Communication port AC input port with connections available for the EMS-C pre-installed.
  • Page 9 INSTALLING AND CONNECTING AN EMS-C PARALLEL COMMERCIAL ALL IN ONES EMS-C full connection overview When fitting multiple CAIO’s together two data connection cables are required between cabinets. The data connections can be found behind top cable entry cover. It is recommended to use Belden type shielded cable for this.
  • Page 10 DATA CONNECTIONS SINGLE CAIO PARALLEL COMMERCIAL ALL IN ONES When fitting just one CAIO the meter data cable is connected to terminals 13 and 14 as per the below When fitting multiple CAIOs the meter data cable is connected to terminals 13 and 14 in the master diagram.
  • Page 11: Pre-Startup Inspection

    INVERTER STATUS INDICATORS PRE-STARTUP INSPECTION Before the commissioning run thoroughly inspect the installation of the equipment. Pay special attention to ensure that the AC voltage meet the inverter’s requirements and verify that the polarity and phase sequence are correct. Check that all connections comply with relevant standards and regulations. Ensure that the system is properly grounded.