Page 1
17779 Main Street Suite C Irvine, CA 92614 USA Tel: +1(949) 333-3800 Fax: +1(949) 333-3804 Model 46812 United Arab Emirates P.O. Box 121971 Saif Zone A2-032 Sharjah, UAE Tel: +971 (06) 552 98 60 Fax: +971 (06) 552 98 61...
Page 2
46812 ontents 1. Introduction Welcome How To Use This Guide How To Receive Additional Help Safety 2. Unloading & Unpacking Precautions Unloading Procedure Unpacking Procedure Packing List 3. Installation & Setup Site Selection Foundation Requirements Required Tools Installation Procedures Troubleshooting...
Page 3
1. Introduction Welcome Congratulations on purchasing the 46812 4-Post Hydraulic Lift. In the pages that follow you will find information on how to unload, unpack, assemble, and test your new lift. Please take the necessary time to thoroughly read this manual to ensure that you know what is required for a safe and smooth installation.
Page 4
46812 2. Unloading & Unpacking Precautions Unloading, unpacking, and installation procedures can be extremely dangerous if not performed with the utmost attention. Clear the entire area of any bystanders to avoid possible injury. Ensure a clean and clear work environment to further reduce the possibility of injury.
Page 5
46812 Packing List 1. Power-side runway with cylinder, hose and cables (1) 2. Off-side runway (1) 3. Front cross bar with lock release handle (1) 4. Rear cross bar (1) 5. Power-side column with mounting holes for pump (1) 6. Off-side column (3) 7.
Page 6
Foundation Requirements The 46812 4-Post Hydraulic Lift must be installed on level ground. The foundation must be reinforced concrete with a minimum thickness of 6” (150 mm), a compressive strength of at least 4000 psi (275 bar), and no less than a 60” (1500 mm) radius surrounding each column in every direction.
Page 7
46812 Installation Procedures NOTE: Make sure you read through the entire installation procedure prior to beginning the process. The will ensure that you fully understand what will be required and will prevent delays during installation. Whenever possible, use the original blueprints for reference. Make sure you satisfy all of the requirements specified in 3.1 and 3.2 prior to beginning installation.
Page 9
46812 Installing the columns with cross bars: Before proceeding, double check measurements and make certain that the bases of each column are square and aligned with the chalk line. Locate the columns at their respective locations according to the chalk line layout.
Page 10
46812 After drilling, remove dust from each hole using compressed air and/or a wire brush. Make certain that the column remains aligned with the chalk line during this process. Assemble the washers and nuts on the anchors then tap into each hole with a block of wood or rubber hammer until the washer rests against the base plate.
Page 11
46812 Mounting the runway: Put the off-side runway on the cross bar on the right side. Ensure the utility rails for beam lift are on the inside. FIG. 13. Using the bolts provided, bolt the right-rear end of the off-side runway to the rear cross bar.
Page 12
46812 Mounting the power unit: Attach the power unit to the power-side column using bolts, nuts and washers supplied. FIG. 17. Have a certified electrician run the 220V/60Hz single phase power supply to the motor. Be sure to size the wire for a 25 amp circuit.
Page 13
46812 Troubleshooting PROBLEM CAUSE REMEDY MOTOR DOES NOT 1. Button does not work 1. Replace Button 2. Wiring connections are in 2. Repair wiring connections bad condition 3. Motor is burned out 3. Repair or replace motor 4. AC contactor is burned 4.
Need help?
Do you have a question about the 46812 and is the answer not in the manual?
Questions and answers