Download Print this page
Aira HPI-HW-150-1.5 Installation Manual

Aira HPI-HW-150-1.5 Installation Manual

Hot water cylinder

Advertisement

Quick Links

Aira Hot Water
Cylinder
Installation manual
Hot water cylinder tliˆline RD0L
Hot water cylinder 200L
Hot water cylinder 2D0L
Hot water cylinder V00L
HGQHHWHRD0HRED
HGQHHWH200HRED
HGQHHWH2D0HRED
HGQHHWHV00HRED

Advertisement

loading
Need help?

Need help?

Do you have a question about the HPI-HW-150-1.5 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Aira HPI-HW-150-1.5

  • Page 1 Aira Hot Water Cylinder Installation manual Hot water cylinder tliˆline RD0L HGQHHWHRD0HRED Hot water cylinder 200L HGQHHWH200HRED Hot water cylinder 2D0L HGQHHWH2D0HRED Hot water cylinder V00L HGQHHWHV00HRED...
  • Page 2 CONTENTS 1. Safety instructions ............ 3 General information ........3 1.2 Safety instructions for users ....4 1.3 Safety instructions for installers ..... 4 2. Product description ..........5 2.1. Product identification ........5 2.2. Intended use ........... 5 2.3 CE marking ............5 2.4 Technical data ..........
  • Page 3 1. SAFETY INSTRUCTIONS 1.1 General information • Read the following safety instructions carefully before installing, maintaining or adjusting the hot water cylinder. • Personal injury or material damage may result if the product is not installed or used in the intended manner. •...
  • Page 4 1.2 Safety instructions for users WARNING The overflow from the safety valve must NOT be sealed or plugged. The product must NOT be covered over the cover on the front. The product must NOT be modified or changed from its original state. Children must NOT play with the product or go near it without supervision.
  • Page 5 2.1 Product identification 2.2 Intended use Identification details for your product can be found AIRA hot water cylinders are designed to supply on the type plate fixed to the product. The type homes with hot running water. The product is in- plate contains details of the product in accord- tended for use with alternative energy sources.
  • Page 6 3. INSTALLATION INSTRUCTIONS 3.1 Products covered by these instructions AIRA Hot Water Cylinder Slimline 150L (HPI-HW-150-1.5) AIRA Hot Water Cylinder 200L (HPI-HW-200-1.5) AIRA Hot Water Cylinder 250L (HPI-HW-250-1.5) AIRA Hot Water Cylinder 300L (HPI-HW-300-1.5) 3.2 Included in delivery Num- Ref no.
  • Page 7 The product is equipped with three factory- fitted adjustable feet (6), adjustable from 0-40 mm. (not for AIRA Hot Water Cylinder Slimline 150L). Place the product carefully on its back, preferably on the cardboard pack- aging to avoid cosmetic damage.
  • Page 8 3600 L/h 4500 L/h 5400 L/h Flow @ 1bar Product code face (m²) (0,15L/s) (0,25 L/s) (0,50 L/s) (0,75 L/s) (1,00L/s) (1,25 L/s) (1,50 L/s) pressure drop HPI-HW-150-1.5 1580 2350 3350 HPI-HW-200-1.5 1440 2150 3050 HPI-HW-250-1.5 1440 2150 3050 1555 2330 3340 HPI-HW-300-1.5...
  • Page 9 3.5.5 Fitting instructions WARNING The product must be filled with water before the power is switched on. The discharge pipe from any safety device must be at least one pipe size larger than the nominal outlet size of the safety device (< 9m length). The discharge pipe must have continuous fall to drain, be uninterruptable and frost-free at all times.
  • Page 10 3.6 Pipework •Cold water supply: To obtain the best performance from your AIRA unvented system it is advisable to feed the unit with an uninterrupted supply. Before connecting to the multibloc (3+4), flush the cold supply pipework of all flux and debris.
  • Page 11 1 & 2. The primary flow and return fittings are 3/4’’ BSP female. The direction of primary flow in the coil is top to bottom. For electrical connection of the backup immersion heater, please read Electrical Installation Instructions. •Tundish: Install the Tundish (6) in a vertical position within a maximum of 600 mm from the temperature and Pressure Relief Valve drain connection (5).
  • Page 12 3.7 Electrical installation The electrical supply to the back-up immersion heater must be done in accordance with current local regulations and best practice by a profes- sional who is qualified to perform such work as per local regulatory requirements. The product is intended for permanent supply.
  • Page 13 3.7.4 Fitting instructions WARNING The product must be filled with water before the power is switched on. The electrical supply to the back-up immersion heater must be done in accordance with current local regulations and best practice by a qualified electrician. The product is intended for permanent supply.
  • Page 14 First check that all pipes are connected correct- via the lower connection. Note: The coil has ly. Then proceed as follows: a riser (R) from the lowest point (not for AIRA A) Open a hot tap – leave it open Hot Water Cylinder Slimline 150L), where liq- B) Open the cold water supply to the product.
  • Page 15 5.1.2 Adjusting the feet The product is equipped with three factory- fitted feet (not for AIRA Hot Water Cylinder Slimline 150L), adjustable from 0-40 mm. Unscrew the feet a minimum of 15 mm from the bottom of the product. Adjust the feet in- dividually until the product is standing firmly vertically and horizontally.
  • Page 16 If you have any issues or questions about your heat pump system, our Customer Care team is available 24/7 to help. Website: www.airahome.com Email: support@airahome.com © This installation manual and all its content is protected by copyright and may be reproduced or distributed only with written consent from the manufacturer. We reserve the right to make changes without notice.

This manual is also suitable for:

Hpi-hw-200-1.5Hpi-hw-250-1.5Hpi-hw-300-1.5