TMP Flecta Installation Manual

Rsrb bollard, solar led

Advertisement

Flecta
Metro
lnstallation options
For all new standard installations we recommend using our Cast-in Cage, and
for high-risk areas, we recommend our Retention Socket. Both solutions give
enhance protection in the event of an impact, but using our retention socket
will make removing and replacing the bollard in the future easier.
The Evo-N-RS is compatible with both the TMP or NAL 50x50 Retention
Socket right out of the box, plus we also make an adaptor plate that allows
the rest of our traffic bollard range to be retention socket compatible too.
IMPORTANT : This product is to be installed and maintained by qualified personnel only.
TMP Solutions take no responsibility for damage or injury incurred during the installation or maintenance.
These instructions must remain with the product to ensure correct installation.
RSRB Bollard
Installation Guide
Evo-N
Evo-MAX
0121 227 8639
www.trafficmanagementproducts.co.uk
Evo-S
(Solar LED)
Evo-N-RS
(Retention Socket)
Heritage
1 of 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Flecta and is the answer not in the manual?

Questions and answers

Summary of Contents for TMP Flecta

  • Page 1 IMPORTANT : This product is to be installed and maintained by qualified personnel only. TMP Solutions take no responsibility for damage or injury incurred during the installation or maintenance. These instructions must remain with the product to ensure correct installation.
  • Page 2: Tools Required

    How to install the the cage Identify the site and ensure it is free from buried services. The TMP range of traffic bollards are designed to rebound on impact. (NB If placed in close proximity to posts this could affect the performance of the product.)
  • Page 3 Retention Socket Installation Tools Required 19mm Spanner Size 6 Hex Key Excavation Equipment Spirit Level Concrete Mix Type 1 Sub Base Note: If the existing ground is loose or uncompacted, How to install the retention socket use a wider/deeper base of concrete. Excavate the site to a minimum of 300mm x 400mm wide by 225mm deep.
  • Page 4 All our RSRB bollards are compatible with our retention socket when installed with the optional adaptor plate. How to secure the bollard Remove both cover plates from the retention socket using the size 6 hex key. You will now see an access chamber housing the head of an M12 bolt, and a 50x50mm socket. Loosen the M12 bolt using a 19mm spanner so that the 50x50 socket is clear of obstruction.
  • Page 5: Installation

    19mm Socket & Ratchet Installation Identify the site and ensure it is free from buried services. The TMP range of traffic bollards are designed to rebound on impact. (NB If placed in close proximity to posts this could affect the performance of the product.)
  • Page 6: Maintenance

    Replace the door and tighten the screws. Maintenance Battery and solar panel replacements may become necessary to maintain the Evo-S bollard. Should the product fail to illuminate contact us on 0208 744 8201 or email info@tmp.solutions and we’ll help you purchase replacement parts. Need help? 0121 227 8639 We operate a policy of continuous product development and reserve the right to change or improve specification without prior notice.

This manual is also suitable for:

MetroEvo-nEvo-maxEvo-sHeritage

Table of Contents