Summary of Contents for FUELCLOUD CloudBox 2

  • Page 1 CloudBox Installation Manual Hardware Version 2.0 Manual Version 1.1 Revised 8/29/24...
  • Page 2 This installation guide contains all of the information you need to install your hardware, create your online account, and begin using FuelCloud. Before beginning physical installation of your FuelCloud hardware, create an account at fuelcloud.com and register your device’s serial number to your account. Physical installation can’t be completed without an online account.
  • Page 5 Power supply: Rate: : Speed: Duty cycle: Contact: Open collector:...
  • Page 9 Hazardous Area Examples Classified areas adjacent to dispenser mounted on aboveground storage tank: 18 in. (0.5 m) 18 in. (0.5 m) Classified areas adjacent to dispensers: 18 in. (0.5 m) 18 in. (0.5 m)
  • Page 12 BEFORE INSTA ATION Identify Your Installation Location Ensure the following: • ine of sight to the CloudBox 2 • Good TE cellular coverage • Fueling within 75' of the CloudBox 2 75’+...
  • Page 13: Turn Power Off

    BEFORE INSTA ATION Turn Power Off Turn off all power to the pump at the breaker. BEFORE INSTA ATION Remove Plugs Two of the conduit holes pictured have disposable plugs. These plugs must be removed before installation. If these conduit holes are not to be used, cap the holes with U listed plugs.
  • Page 14 BEFORE INSTA ATION Mounting Attach the 2 mounting flanges to the back of the CloudBox 2. Then mount the CloudBox 2 using any available fasteners. 13.24" 7.72" 13.24"...
  • Page 17: Ac Power Wiring

    installation - Supply powe AC Power Wiring 120VAC Supply Power Line AC L/L1 Neutral AC N/L2 INPUT Earth Earth Breaker AC L/L1 AC N/L2 Earth 240VAC Supply Power Line AC L/L1 Line 2 AC N/L2 INPUT Breaker Earth Earth...
  • Page 18 installation - Supply powe Stationary Class II DC Wiring Stationary DC Supply Power Power 7.5 A Fuse INPUT Ignition Class II DC Sense Ground...
  • Page 21 installation - Cont ol DC Pump Control 8-50VDC Pump Control DC+ IN INPUT Class II DC DC+ OUT Pump DC+ IN DC+ OUT...
  • Page 22 installation - Cont ol AC Pump Control 120VAC Pump Control Line Breaker L IN Neutral INPUT L OUT Pump AC L IN AC L OUT 240VAC Pump Control Line 1 Breaker L IN Line 2 INPUT L OUT Pump...
  • Page 23 - Cont ol Dispenser Control Dispenser Control Line Dispenser Return/ Handle L / DC+ INPUT N / DC- Neutral Breaker L / DC+ N / DC- Caution: The CloudBox 2 authorizes the dispenser. The pump should be controlled by the dispenser.
  • Page 28 Note: The FuelCloud app will still work in Bypass mode.
  • Page 30 Green: On and act ve Green: Strong connect on Yellow: On and nact ve Yellow: Good connect on Red: Poor connection Off: No connection...
  • Page 32 Revised 8/29/2 FuelCloud, Inc. 124 SW Dennis Ave Hillsboro, OR 97123...