INDEX 1.1 INTRODUCTION-------------------------------------1 1.2 PACKING-----------------------------------------------1 1.3 DRAWING----------------------------------------------1-26 1.4 FEATURES---------------------------------------------27 1.5 SPECIFICATION--------------------------------------28-29 1.6 INSTALLATION AND TESTING------------------30 1.7 HOT-SWAP PROCEDURE--------------------------31 1.8 PINOUTS AND FUNCTION OF THE CONNECTORS----------------------------------------32 1.9 TROUBLE SHOOTING------------------------------33...
1.1. INTRODUCTION Thank you for the purchase of the Advanced Redundant Switching Power System ARX (X may stand for D/I/H),each model has the same main structure and functions. The difference is on the shape and dimension. For each detail drawing, please refer to the section 1.
1.4. FEATURES Independent DC Outputs and passive backplane design REDUNDANCY ensure redundant function been performed for computer system. Balance Share loading with no transfer time when backup takes place. The power system provides a HOT-SWAP function. This HOT-SWAP means when one of the redundant power module fails or FUNCTION breaks down, you can easily replace failed unit without any interference to the system.
1.6. INSTALLATION & TESTING Turn off (remote off) the on / off switch Mount the power supply in the system chassis using the proper mounting hardware, the mounting holes in the power supply should match up with those in the case. Attach the connectors to the motherboard by following the motherboard’s instructions, there are various on connectors/pinouts in both the power supply and motherboard.
If everything works out fine, then turn off (remote off) the power system, now put back the cover of the case and tighten then with the screws which you have retained earlier. Now you have completed the installation of the ARX redundant power supply system. 1.7. HOT-SWAP PROCEDURES Please refer to the following when either one-power module found defective.
1.8. PINOUTS AND FUNCTION OF THE CONNECTORS ***PLEASE AWARE THE POLARITY THE LED CONNECTOR OF POWER #1 PIN# COLOR VOLTAGE GREEN BLACK THE LED CONNECTOR OF POWER #2 PIN# COLOR VOLTAGE ORANGE BLACK THE LED CONNECTOR OF TOTAL POWER SYSTEM PIN# COLOR VOLTAGE...
WHITE 1.9. TROUBLE SHOOTING If you have followed these directions correctly, there should be no problem. Same common symptoms are: the system doesn’t work, buzzer sound, work for a very short period, etc., please try the following steps to verify and correct it: 1.
The “RELIABILITY “ solution to E-application 新巨企業股份有限公司 ZIPPY TECHNOLOGY CORP. POWER DIVISION HEADQUARTERS 10F, NO. 50, MIN CHYUAN RD., SHIN-TIEN CITY, TAIPEI HSIEN, TAIWAN, R.O.C. TEL: 886-2-29188512 FAX: 886-2-29134969 WEB SITE: http://www.zippy.com.tw E-mail:power@zippy.com.tw USA OFFICE U.S. East (Atlantic) 11 Melanie Lane, Unit 1B East Hanover, NJ 07936 TEL:1-973-463-9499 FAX:1-973-453-8014 E-mail:edward@zippy.com...
Need help?
Do you have a question about the ADVANCED and is the answer not in the manual?
Questions and answers