Adjustments; Mechanical Adjustments; Electrical Adjustments - Sony XR-7070 Service Manual

Fm/am cassette car stereo
Hide thumbs Also See for XR-7070:
Table of Contents

Advertisement

SECTION 3
ADJUSTMENTS
3-1.
MECHANICAL
ADJUSTMENT
3-2.
ELECTRICAL
ADJUSTMENTS | DECK
SECTION
PRECAUTION
PB Head Vertical Adjustment
:
.
;
Proceudre:
1. Wipe the following components with an absorbent cotton
1... Put dhe set ante the PWD PB mode
cloth moistened with alcohol before adjustment:
;
;
PB head
Pinch roller
test tape
Idler
Rubber belt
P-4-A100
Capstan
(10 kHz, — 10 dB)
VTVM
2. Demagnetize the PB head using a head demagnetizer.
3. Be careful not to use a magnetized screwdriver.
4. After adjustment is completed, lock the adjustment parts
using screws.
5. Unless
otherwise
specified,
make
adjustments
at
the
LINE OUT
specified voltage (14.4 V).
CNP906
| L-CH
R-CH
Torque Measurement
Measure the torque at a supply voltage of 14.4 V DC.
2. Turn the screw and check the output peak value.
Adjust
the
screw
so
that
peak
value
in channels
L and R
coincides within 2 dBu.
Meter reading
25 to 55 g-cm
(0.35 to 0.77 oz:-inch)
55 to 150 g-cm
(0.77 to 2.1 oz-inch)
Torque meter
FWD
CQ-102C
FF, REW
CQ-201B
|.
3
R
1.5 to 4 g-cm or less
L-CH
Bre one)
See
(0.02 to 0.05 oz-inch or less)
peak
ae
within
2dB
R-CH
peak
screw
=
nae
—-
an
Position
L-CH
R-CH
g
peak
peak
3. Check the phase in the PB mode.
Adjustment
Location:
test tape
P-4-A100
(10 kHz, — 10 dB)
L-CH
47 kQ
oscilloscope
FWD
REV
LINE OUT
Lissajous's waveform
on D6
good
ae
4.
Repeat the above adjustment for the REV PB mode.
5.
Check that output level difference between FWD PB mode and
REV PB mode is within 4 dBu.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the XR-7070 and is the answer not in the manual?

This manual is also suitable for:

Xr-7071Xr-7072

Table of Contents