Keep this manual for future reference. Purpose This manual is intended as: • An introduction to a three-phase hybrid inverter (the E8KT/E10KT/E12KT), and the BluE-PACK-5.1 lithium-ion battery pack. • An installation and maintenance guide for qualified personnel and technicians working with the hybrid inverters and the battery packs.
Limitation of Liability KSTAR New Energy is not responsible, directly or indirectly, for any damage to the equipment or loss of property caused by the following: • Disassembling and/or modifying the equipment, replacing parts, or modifying the software code without the permission of the manufacturer.
2 Safety Instructions • Any other damage caused by you or a third party through negligence, willful misconduct, or mishandling, or for other reasons not attributable to KSTAR New Energy. Warning Signs The warning signs and nameplates attached to the equipment contain important information to guide you in safe use of the equipment.
• Damage caused by your or a third party’s failure to follow the requirements specified by the manufacturer, including, but not limited to, unauthorized relocation and installation of the battery packs. KSTAR New Energy shall not be responsible for damage caused by: • Frequent over-discharge of batteries caused by your inappropriate maintenance, on-site expansion, or long-term failure to fully charge.
KSTAR New Energy provides a photovoltaic storage-monitoring platform to monitor and control electricity generation and storage of the E8KT/ E10KT/E12KT. Power generation, consumption, and storage can be grasped at any time and any place, and the information can be monitored and controlled remotely.
“xK” indicates the rated output of the system. “8K” means 8 kW, “10K” means 10 kW, and “12K” means 12 kW. “T” means “three-phase inverter”. 3.3.2 Battery Pack Model Two battery pack models are available for the E8KT, E10KT, or E12KT. E xK T For BluE-PACK-5.1-16S-100A-F One is BluE-PACK-5.1-16S-100A-F. BluE-PACK-5.1-16S-100A-F “BluE”...
Parallel System With the E8KT/E10KT/E12KT, you can connect up to four inverters of the same model in parallel to build a parallel system. In a parallel system, loads must be connected in parallel on both the on-grid and backup sides. Compared with a system installed with one inverter, a parallel system expands the system capacity.
• In a parallel system, all settings must be the same for all inverters except for the addresses of the inverters. Scenarios The E8KT/E10KT/E12KT can be used in both a DC-coupling system and an AC- coupling system. 3.8.1 DC-coupling System In a DC-coupling system, the DC electricity generated by the PV panels is directly sent to and stored in the batteries through the inverter.
AC electricity back to DC electricity, and then store it in the batteries. An AC-coupling system is ideal for retrofit. The E8KT/E10KT/E12KT supports two AC-coupling system schemas. If you already have a PV inverter and now want to add an energy storage system to the inverter, but no PV panel is available for connection, you can use AC- coupling system Schema 1.
PROTECTION. For more information, see Indicator Lights and States. 3.11 Working Modes The E8KT/E10KT/E12KT supports three working modes: SELF CONSUME, BAT PRIORITY, and PEAK SHIFT. You can choose a working mode through the integrated EMS. For more information, see the WORK MODE subsection under SETTING.
4 Installation Installation With the E8KT/E10KT/E12KT, you can install a PV energy storage system using either of two schemas: • Install one hybrid inverter and two, four, six, or eight battery packs. • Install a parallel system with multiple hybrid inverters of the same model, each with its own battery packs, connected in parallel.
4 Installation 4.1.2 Battery Pack Components A minimum of two battery packs are necessary for an E8KT/E10KT/E12KT energy storage system. A battery pack delivery includes the following. 4 × ST6.3*50 2 × M5*12 4 × D10*50 4 × M6 Gasket 1 ×...
4 Installation Installation Position Requirements The E8KT/E10KT/E12KT energy storage system can be installed indoors or outdoors, but the position for installation must meet these requirements: • Sufficient space for personnel to install and maintain the equipment and to operate the LCD screen on the hybrid inverter and the control panels of the battery packs.
4.3.2 Clearance Requirements If the E8KT/E10KT/E12KT is mounted on a wall or on a surface that is 300 mm from a wall or structure that separates the equipment from habitable rooms, the distance between the equipment and other structures or objects must be increased.
4 Installation If the distance between the E8KT/E10KT/E12KT and the object above it, for example, a ceiling, is less than 500 mm, the surface of the object must be paved with non-combustible material in the form of a circle with a radius of 600 mm around the center of the equipment.
(Optional) Connecting a DRED or an RRCR NOTES The E8KT/E10KT/E12KT complies with AS/NZS 4777.2:2015 standard. Its DRM port can be connected to a Demand Response Enabling Device (DRED) in Australia or New Zealand or a Radio Ripple Control Receiver (RRCR) in other areas or countries.
PIN 8 To connect an RRCR, follow this figure for wiring. RRCR 4.4.11 (Optional) Connecting a Generator If you are using a generator, you can connect the generator to the E8KT/E10KT/ E12KT energy storage system. AC cable DC cable WiFi/GPRS Stick...
4 Installation Installing a Parallel System The E8KT/E10KT/E12KT supports installation of a parallel system with more than one inverter. A maximum of four inverters can be connected in parallel. For more information, see Parallel System. 4.5.1 Wiring of a Parallel System Follow these figures for wiring of a parallel system with two, three, or four inverters.
Checking Before Power-on Before powering on the system, thoroughly check the installation. Step 1. Make sure that the E8KT/E10KT/E12KT is firmly fastened to the mounting panel on the wall. Step 2. Check the electrical connection inside the cable box. Make sure that: •...
On the SYS SETTING page, press to move the cursor to select WORK MODE and press to set a working mode. The E8KT/E10KT/E12KT supports three working modes: SELF CONSUME, PEAK SHIFT, and BAT PRIORITY. For more information, see Working Modes.
Page 98
-PV INPUT- -> 1: INDEPENDENT 2: PARALLEL ZERO EXPORT The E8KT/E10KT/E12KT can output power to the grid. On the SYS SETTING page, press to move the cursor to select ZERO EXPORT and press By default, this feature is disabled. When the feature is enabled, the system outputs power to the grid and you can set the power limit in the range from 10 W to the rated power of the system.
Page 99
2: ENABLE -> 1: DISABLE -> 1: DISABLE 2: ENABLE 2: ENABLE ENABLE and press By default, the E8KT/E10KT/E12KT can automatically switch to backup power when a grid power failure occurs. -EPS ENABLE- -START DELAY- -CEI SPI CTRL- -DRM ENABLE- -EPS ENABLE- ->...
Page 100
INPUT: _____ -> 1: D 2: ENABLE UNIT: SEC CEI SPI CTRL The E8KT/E10KT/E12KT supports the CEI 0:21 standard. Currently, this feature is LEAD-ACID After settin applicable in Italy only. please res When Italy is selected as the grid standard, you can select OPERAT MODE...
Page 103
INPUT: 9 3: CV -> 2: ENABLE SILENT MODE The E8KT/E10KT/E12KT can be set to silent mode. In silent mode, the fan speed -INPUT MODE- is reduced and the inverter produces less noise. -> 1: INDEPENDENT On the SYS SETTING page, press...
Page 104
6 System Operation The E8KT/E10KT/E12KT supports remote control of the inverter. On the SYS SETTING page, press to move the cursor to select -FCTRY RESET- CYBERSAFETY and press On the CYBERSAFETY page, you have two options: -> 1: CANCEL -> 1: Mix 2: CONFIRM •...
-BAT TYPE- DISC DEPTH Please restart 1: LEAD-ACID When the E8KT/E10KT/E12KT energy storage system is connected to the power -> 2: LFP grid, you can set the maximum depth of discharge of batteries. On the BAT SETTING page, press to move the cursor to select DISC...
REACT MODE The E8KT/E10KT/E12KT provide some ways to monitor reactive power. These settings are determined by the selected grid standard. You must not change these settings during system operation. On the RUN SETTING page, press...
• ISLAND: To enable anti-islanding protection. This is for use by maintenance personnel only. 6.3.14 AUTO TEST In Italy, when an E8KT/E10KT/E12KT energy storage system is installed, it must pass the AUTO TEST in the specified operate mode before being connected to the local grid. For more information about the operate mode, see OPERAT MODE.
GRID POWER subsection under SETTING. -SELECT- 6.3.17 AFCI TEST -> 1: Transient The E8KT/E10KT/E12KT can conduct an AFCI test. 2: Final On the SETUP page, press to select AFCI TEST and press . The self-test starts automatically. -AFCI TEST PASS-...
6 System Operation Viewing INQUIRE You can view the information of the E8KT/E10KT/E12KT energy storage system. On the USER page, press to select INQUIRE to view this information: • INV MODEL: The model of the hybrid inverter in use. • MODEL SN: The serial number of the hybrid inverter in use.
6 System Operation Viewing STATISTIC You can view some data of the E8KT/E10KT/E12KT energy storage system. On the USER page, press to select STATISTIC to view this information: • TIME STAT: Hours of the inverter running and its connection to the grid.
• During inspection and maintenance, wear protective personal equipment, including insulated gloves, protective shoes, and anti-noise earplugs. • Follow local and international safety standards, regulations, and specifications to do the maintenance. • Contact KSTAR New Energy promptly if you encounter anything not covered in this manual. CAUTION Before maintenance, disconnect all the electrical connections. Wait at least five minutes after disconnection, so that the residual voltage of the capacitors falls to a safe voltage.
9 Limited Warranty Limited Warranty If the equipment fails during the warranty period, KSTAR New Energy and its authorized partners will provide free service or replace the unit or part with a new one. When the Warranty Period Starts and Ends...
Limitation of Liability KSTAR New Energy has the right to refuse to honor the quality warranty for any of the following reasons: • Damage during transportation, including paint scratches caused by friction inside the package during transportation, and damage sustained while being transported by you or a third party commissioned by you.
This section describes emergencies that may be encountered when you are using the E8KT/E10KT/E12KT energy storage system and how to handle such emergencies. 10.1...
Step 3. Record the details related to the fault so that KSTAR New Energy can analyze and rectify the fault. DO NOT operate the equipment before the fault is rectified. Please contact KSTAR New Energy as soon as possible.
If you need to replace a battery pack, you should request a new dangerous goods package, pack the battery pack, and then have the supplier pick it up. KSTAR New Energy does not recycle batteries. Please contact your local recycling organization for disposal. If there is no local recycling organization, you should contact the nearest recycling organization in your country.
Need help?
Do you have a question about the E8KT and is the answer not in the manual?
Questions and answers