Page 2
Page 2 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre...
Page 3
The numbers are given on enclosed certificates, and are also shown on the name plate on the lifeboat. During the warranty period, all necessary spare parts must be supplied by VIKING Norsafe AS. The use of spare parts supplied by other suppliers violates and forfeits the warranty.
Page 6 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre 2 INTRODUCTION The lifeboats are stored on the boat davits on both sides of the ship.
Page 7 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre Equipment arrangement 2.2 General description...
Page 8
Page 8 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre The centre tank section contains water &...
COG in the boat will rise over it design limitations and the boat may become less stable or in worst case have the risk of water filling through an open hatch. Viking Norsafe recommend do some actions as below to reduce the risks of wrong operations and highlight some of the most critical operations/manouvers: 3.1 During boarding of the boat, the trained persons should enter the boat firstly and...
Page 10
Page 10 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre 3.2 After boarding, keep the hatches closed at all time, except when training on recovery...
Page 11
Page 11 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre PIC.5...
Page 12
Page 12 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre PIC.8...
Page 13
Page 13 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre 3.6 Other recommends:...
Page 18 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre 5.2 Setting of painter if a painter is to be used...
Page 19
Page 19 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre...
Page 30 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre 6.2 Recovery procedure of the lifeboat...
Page 31
Page 31 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre Confirm that the lifeboat symbol has moved above the water surface symbol.
Page 32 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre The boat winch stops automatically when the davit arm strikes the limit switch.
Page 39 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre The indicator lights signal the charging process and battery condition.
This air system contains high-pressure air and it is dangerous if not properly maintained. Only qualified personnel or representatives of VIKING should maintain this system. The emergency air system should be kept fully charged at all times i.e. if the pressure drops below 18MPa the system should be recharged to 20MPa.
Page 45 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre 8.17 Rescue of person in the water...
Weekly and monthly maintenance should be conducted by ship’s crew in accordance with this manual, however VIKING recommends that ship’s crew conducting maintenance on this equipment have attended a VIKING product training course to reduce risks listed in MSc Circ 1206 rev 1– Measures to prevent accidents with lifeboats.
Page 58 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre...
Page 59
Page 59 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre...
Page 60
Page 60 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre INSPECTION LOG FOR LIFEBOAT INSPECTIONS.
Page 61
According to IMO MSC.1/Circ.1206 rev.1, 1 year and 5 years control shall be carried out by VIKING authorised personnel VIKING reserve the rights to make changes in this checklist without further notice...
According to IMO MSC.1/Circ.1206 rev.1, 1 year and 5 years control shall be carried out by VIKING authorised personnel VIKING reserve the rights to make changes in this checklist without further notice INSTRUCTIONS FOR SERVICE AND MAINTENANCE...
Page 63
Check condition of valves and gauges on air system Check condition of water spray pump According to IMO MSC.1/Circ.1206 rev.1, 1 year and 5 years control shall be carried out by VIKING authorised personnel VIKING reserve the rights to make changes in this checklist without further notice...
Page 64
Test with 1.1xSWL load (Safety Working Load) According to IMO MSC.1/Circ.1206 rev.1, 1 year and 5 years control shall be carried out by VIKING authorised personnel VIKING reserve the rights to make changes in this checklist without further notice...
Page 65
Sufficient tools for minor adjustment / repair engine. According to IMO MSC.1/Circ.1206 rev.1, 1 year and 5 years control shall be carried out by VIKING authorised personnel VIKING reserve the rights to make changes in this checklist without further notice...
Page 66
(EPIRB). Approval / type certificate according to MED 96/98 EC required According to IMO MSC.1/Circ.1206 rev.1, 1 year and 5 years control shall be carried out by VIKING authorised personnel VIKING reserve the rights to make changes in this checklist without further notice...
Page 67
Page 67 of 71 VIKING Project VIKING Doc. No.: Rev. Date.: Rev. No: No.: MAN-2345 30.11.2022 JYN-57 Totally Enclosed Lifeboat, Tanker & Dry cargo version with Tor on load Customer Doc. No.: Rev. No: — — MK2 & MK2-S 3.36T, Operation & maintenance manual, training centre...
Need help?
Do you have a question about the NORSAFE JYN-57 and is the answer not in the manual?
Questions and answers