Siteco Connect 21B 5LZ960100 | Inbetriebnahme-Kurzanleitung (DE) | Quick Start Guide (EN) | 264328-001_ab | 2022-12-15 DALI test To check that the DALI wiring is correct, please do the DALI test. To do this, please proceed as follows: 1.) Switch on the circuit breaker 2.) check LEDs on DALI2-master-terminal...
Siteco Connect 21B 5LZ960100 | Inbetriebnahme-Kurzanleitung (DE) | Quick Start Guide (EN) | 264328-001_ab | 2022-12-15 Go to the website http://172.16.17.10/Tc3PlcHmiWeb/Port_851/Visu/webvisu.htm User name: b Password: 1 Configuration via Excel For configuration via Excel, please proceed step by step: Settings > General > Save default settings (PIN: 1909) Download data from the device via FTP ( ftp://172.16.17.10 )