  • Page 1 Operation & Instruction Manual DES1A...
  • Page 2: Table Of Contents

    Prologue..................1 User Instructions..............1 Choosing a Location..............Installation Drawing..............Installation of Pipeline............Blueprint of Steam Engine............. Electrical Information ............Ampere Meter................. Assembly Graph for Power........... Wiring Diagrams..............10-13 Installation of the Top Light..........Choosing The Type of Machine........... Maintenance of the Steam Engine........Configuration of the Steam Generator........
  • Page 3: Prologue

    Welcome to the DESlA series steam generator. This series contains a steam furnace and a controller in which you can adjust the temperature of the sauna room with and set the working time of the steam as you wish. The system contains an overheat/dry-burnt protection system and a security valve.
  • Page 4: Installation Drawing

    DES1A Choosing a Location 7. The steam generator should be installed horizontally and stable and is equipped with a hanging groove for immobility. 8. There should be at least 12 inches of space on both sides and the top of the steam generator.
  • Page 5: Installation Of Pipeline

    WARNING:The installation of all pipes should be completed by a qualified plumber with the corresponding operation certificate. 1. Use joints when connecting pipes. 2. Use brass or copper hoses only. 3. Do not use black or galvanized or PVC pipes. Water Supply Pipe (1/2") 1.
  • Page 6: Safety Valve

    IMPORTANT 1. Please consult your distributors of building materials like acrylic, fiber glass or other non-heat resistant materials about the installation position of the steam nozzle. It is suggested that MS-103412 anti-heat material to be used. 2. In the entire steam room, it is required that the steam can not leak out. The pipes, accessories and any holes in the wall should be sealed by applying silicone to ensure that the steam will not escape.
  • Page 7: Blueprint Of Steam Engine

    DES1A Blueprint of Steam Engine...
  • Page 8 DES1A Blueprint of Steam Engine...
  • Page 9: Electrical Information

    ATTENTION: To facilitate maintenance, keep the steam engine clean. If the information provided is limited, do not operate on the pipeline and electric equipment arbitrarily as shown in the figure for proportion. CAUTION: To avoid damage to the equipment, do not connect strong electric current directly to the components.
  • Page 10: Ampere Meter

    The data provided above is for 220-240V(1PH/2PH), 208V(3PH) and 380-415V(3PH). Within the eyeshot of the steam engine, install an independent circuit breaker so as to provide an electricity supply with overflow protection and electricity leakage protection (Ground Fault Interrupter)
  • Page 11: Assembly Graph For Power

    ATTENTION: To avoid damage to the equipment, do not connect strong electrical current to the component directly. WARNING: This graph is for explanation only. For actual installation, refer to national and local electricity consumption codes by professional licensed electricians.
  • Page 12: Wiring Diagrams

    DES1A Wiring Diagram 380 - 415V (3PH)
  • Page 13 DES1A Wiring Diagram 280V (3PH)
  • Page 14 DES1A Wiring Diagram 220 - 240v (1PH/2PH)
  • Page 15: Installation Of The Top Light

    CAUTION: Light is available in 12V/220V/230V outputs. To avoid generator damage or danger, please consult with the manufacturer with the voltage of the light. If the light output is 12V, the power of the light should not be more than 35W, otherwise the transformer will burn out causing danger. If the light input is 220V~240V, the light power should not exceed more than 100W.
  • Page 16: Choosing The Type Of Machine

    Measure the length, width and height (in feet) of the current steam shower or bathtub room. Example: L:7 x W:5 x H:8 = 280 cubic feet You would need model s-900 However, if your shower materials are: *Natural Stone (granite or marble) ADD 75% *Exterior Walls ADD 25% *Ceiling Heights exceed 8FT ADD XX% IMPORTANT: The calculation formula for selecting the type of steam engine...
  • Page 17: Configuration Of The Steam Generator

    1. Exclosure 7. Water drain valve 13. Terminal block 2. Insulation bracket 8. Subsidiary water tank 14. Fuse 3. Circuit board 9. Main water tank 15. Earth wire connector 4. Steam outlet 10. Heating element 16. Relay 5. Pressure relief valve 11.
  • Page 18: Trouble Shooting Methods

    Issues Causes Trouble-Shooting Methods 1. The fuse is burnt. 1. Change the fuse (on the shell 0.8A/250V). 2. The wire connection terminal 2. Tightly plug in the wire The machine does not start became loose. connection terminal. when electrified. 3. The contact is not good 3.
  • Page 20: Notes