Elite Screense Evanesce EB120HW3-E8 User Manual

In-ceiling electric motorized front projection screen

Advertisement

In-Ceiling Electric Motorized Front Projection Screen
Important Safety & Warning Precautions
Make sure to read this user's guide and follow the procedures below.
Caution: The screen's Black Top Drop is already set to its maximum drop distance. There is NO extra
Black Top Drop in the roller. Please be aware of this as it will void your warranty with Elite Screens.
Unapproved changes or modifications (except for cutting the power cord for hardwire installations) to this
unit are prohibited and will void your warranty.
Please retain this user's guide for future reference.
To avoid damaging the unit, do not use with any unauthorized accessories not recommended by
the supplier.
Handle the unit carefully during transportation to avoid any damages.
To ensure safe and reliable operation, direct connection to a properly grounded power source is
advised.
The power outlet supplying power to the unit should be close to the unit and easily accessible.
Do not install the unit on uneven, inclined surfaces;
Do not install in damp places to avoid an electric shock or short circuit.
Do not place any heavy objects over the power cord.
Position the power cord properly to avoid creating a trip obstacle.
To avoid an electrical shock or fire, due to a loose contact or short circuit, do not overload the
power cord.
The internal & external parts of this unit are not end user serviceable. Do not attempt to
disassemble this unit by yourself. No one except authorized technicians can open and make
repairs to this unit.
Make sure the power source that this unit is connected to has a continuous power flow.
If there is need to use an extension cord, make sure the cord has an equal rating as the appliance
to avoid over heat.
Do not handle the power plug when your hands are wet or your feet are in contact with water.
Properly dispose of this equipment according to the environmental regulations in your area when
product is no longer of service.
Rev.092719-BR
Evanesce B Series
User's Guide
1
www.elitescreens.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evanesce EB120HW3-E8 and is the answer not in the manual?

Questions and answers

Summary of Contents for Elite Screense Evanesce EB120HW3-E8

  • Page 1 In-Ceiling Electric Motorized Front Projection Screen Evanesce B Series User’s Guide Important Safety & Warning Precautions Make sure to read this user’s guide and follow the procedures below. Caution: The screen’s Black Top Drop is already set to its maximum drop distance. There is NO extra Black Top Drop in the roller.
  • Page 2: Installation Warning

    Do not use this unit under the following circumstances. • Disconnect the power cord under the conditions of heavy rain, wind thunder or lightning. • Avoid direct sun light, rain shower and moisture. • Keep away from fire sources and high temperature to prevent this device from overheating. •...
  • Page 3: Screen Operation

    Evanesce B Series| Controls and Accessories A. IR Remote B. RF Remote C. Wall switch control box D. 5-12 volt trigger cable E. IR extended “eye” receiver F. Wireless 5-12v (3.5 mm) G. AAA batteries H. Bubble leveler mono trigger cable Screen Operation Electric Current: Depending upon region, your Elite Screen will operate on 100v, 110v, or 220v voltage.
  • Page 4 5. 5-12 volt trigger (Item D, Fig 4): The built-in 5-12V RJ45 Input trigger input allows your screen to synchronize its drop & Fig.4 rise with the projector’s power cycle. The screen deploys when the projector powers up and will retract when the projector powers down.
  • Page 5: Installation Instructions

    Installation Instructions The Evanesce B allows access for above or below ceiling installation. Please follow the instructions described in the following steps below for your type of installation. Power The Evanesce B Series includes a 3-Prong Power Cord (2-Prong Power Cord for some countries) for use in a non-concealed power outlet.
  • Page 6 2. Place the Suspension Bar (B) over the Hanging Bracket (A) and align with the hole as shown below according to the height requirement for your installation area. Secure the Suspension Bar (B) with the M6x20mmScrew (B), M6x13mmx2mmWasher (E) and the M6 Nut (F). Repeat the process for the other side.
  • Page 7 1. Measure and cut the ceiling installation slot: The width should not exceed 3.9 inches (100 mm) and not less than the width of the screen’s housing. Measure the length of your screen to determine the length. Ceiling Truss Ceiling Screen installation slot 2.
  • Page 8 4. Insert the threaded rods(C) through the M8 expanding bolts and then attach the M8x40mm hexagonal screws with the washer (E). Last put the Hanging Bracket (B) through the threaded rod equal to the height of the screen’s housing. Once they are firmly in place (as shown below) make sure that they will hold the weight of the screen.

This manual is also suitable for:

Evanesce b series

Table of Contents