Download Print this page

Advertisement

Quick Links

GREENHOUSE INSTALLATION
MANUAL
GREENHOUSE No 9
Lahe Production OÜ | hello@lahehouse.com | +372 611 70 73

Advertisement

loading
Need help?

Need help?

Do you have a question about the 9 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lähe 9

  • Page 1 GREENHOUSE INSTALLATION MANUAL GREENHOUSE No 9 Lahe Production OÜ | hello@lahehouse.com | +372 611 70 73...
  • Page 2 Dear Customer Thank you for choosing Lähe Greenhouse! Please read this installation manual carefully before installing a greenhouse! Reading the installation manual will help you avoid mistakes and damage when installing a greenhouse and ensure better results with less time. If you have no previous experience in installing a greenhouse or construction work, we recommend using the services of an experienced craftsman or construction company.
  • Page 3 A strong concrete slab or ribbon foundation is suggested for Greenhouse No 9. The foundation must be horizontally level and all angles 90 degrees. Only a proper, level and load-bearing foundation ensures an impeccable result.
  • Page 4 Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 5 Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 6 7. Wooden dowel Quantity: 28 pcs 8. Long drill bit SHW TX25 for 5x40 Quantity: 1 pc 9. Glass assembly block 4mm Quantity: 1 pc NB! There may be extra amount of fasteners included! Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 7 6. ASSEMBLY OF FRONT AND BACK WALL Front and back wall upper triangles (EL-01.1 and EL-01.2) are partially disassembled for transportation. Details are packed together for easy recognition. Choose a flat and clean work surface that offers neccessary support for correct assembling. All screws are already attached. Follow markings and place details to correct postitions.
  • Page 8 Connect upper triangles with side posts (EL-02). All screws are already attached. Follow markings and place details to correct postitions. Fasten screws into pre-drilled holes. Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 9 7. INSTALLATION OF BACK WALL Place back wall on the foundation. Use two longer wooden bars as a support and fasten them with a clamping screw. NB! Use transportation box top bars as supports! Place wooden side wall elements (EL-03.1) to the correct location and fasten to back wall posts. Place back wall middle post to correct location and fasten with screws.
  • Page 10 8. INSTALLATION OF FRONT WALL Place front wall on the foundation. Use two longer wooden bars as a support and fasten them with a clamping screw. NB! Use transportation box top bars as supports! Place wooden side wall elements (EL-03.1) to the correct location and fasten to front wall posts. Lahe Production OÜ...
  • Page 11 9. INSTALLATION OF RIDGE BEAM Place ridge beam (EL-06.9) on top of the front and back wall. Metal brackets are already attached to ridge beam. Fasten with screws. Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 12 10. INSTALLATION OF RAFTERS Place upper end of the rafter to the ridge beam metal carrier and fasten with an M6 bolt, washer and nut. Start installation of the rafters from front wall and move toward back wall. NB! Make sure that the edge of the carrier does not cover rafter glass groove! NB! Tighten the nut only later after installing the rafter middle details! (Look section 11) Lahe Production OÜ...
  • Page 13 11. INSTALLATION OF RAFTER MIDDLE DETAILS Place wooden dowels to holes at the end of rafter middle detail (DET-01) and place it between two rafters so that it is attached. Make sure that edge of the rafter middle detail is parallel with rafter glass groove and do not block groove.
  • Page 14 12. INSTALLATION OF WOODEN SIDE WALL ELEMENTS Place wooden side wall elements (EL-03.1) to the correct location between rafter posts and fasten with screws. Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 15 13. INSTALLATION OF WOODEN FRONT WALL OUTER ELEMENTS Place wooden front wall elements (EL-03.2) to the correct location and fasten with screws to front wall posts. Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 16 14. INSTALLATION OF DOOR POSTS Place door posts (EL-05) to the correct location and fasten with screws. NB! Make sure that door opening is exactly 1400 mm from top and bottom! Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 17 15. INSTALLATION OF WOODEN BACK WALL OUTER ELEMENTS Place wooden back wall elements (EL-03.2) to the correct location and fasten with screws to back wall posts. Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 18 16. INSTALLATION OF BACK WALL INNER POSTS Place back wall inner posts (EL-04) to correct positions and fasten with screws. NB! Make sure that caps between posts are equal from top and bottom! Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 19 17. INSTALLATION OF WOODEN BACK WALL INNER ELEMENTS Place wooden back wall elements (EL-03.3) to the correct location between posts and fasten with screws to back wall posts. Lahe Production OÜ hello@lahehouse.com +372 611 70 73...
  • Page 20 18. ATTACHING GREENHOUSE TO THE FOUNDATION Before attaching greenhouse frame to the foundation, make sure that greenhouse is correctly positioned, corners of the frame are 90 degrees and the diagonals are of equal length! Foundation 1: 0 Attach greenhouse to the foundation through the wooden wall elements. Drill holes in advance and fasten with suitable screws (depending on the foundation type.
  • Page 21 19. INSTALLATION OF ROOF WINDOWS Place the roof windows (EL-08) to intended locations on rafters and push against ridge beam. Make sure roof windows are equally spaced on all rafters. Hinges are attached to the roof windows frames. Fasten to ridge beam with screws. Lahe Production OÜ...
  • Page 22 20. INSTALLATION OF ROOF WINDOW MIDDLE DETAIL Place grooved middle details (DET-04) under roof windows. Make sure that middle detail groove lines with rafters grooves. Fasten with screws. Tip: To make it easier to install the middle detail, we recommend attaching it to the roof window with a clamping screw.
  • Page 23 21. INSTALLATION OF DOORS Lift the door halves (EL-09 and EL-10) carefully to the hinges. Make sure that door halves align correctly and work properly. NB! Install the door stops so that front wall glass will be not damaged when the door is opened! Lahe Production OÜ...
  • Page 24 22. INSTALLATION OF GLASS Make sure that you are well prepared and have neccessary tools available. It is recommended to have at least two persons for glass installation and always use suction cups to lift glass safely. Make sure in advance that all posts are vertically level before installation of glass. If necessary, add a temporary supports for greenhouse frame.
  • Page 25 22.1. INSTALLATION OF ROOF GLASS Carefully place the end of the glass to grooves and push it all the way up to the end. Do not use force (glass must move smoothly). Make sure that the glass is evenly grooved. Drill hole (size 5) in advance to the rafter middle detail and roof window lower frame with a depth of ca 30 mm.
  • Page 26 22.2. INSTALLATION OF SIDE WALL GLASS Place the upper end of the glass under the edge of the roof glass so that the lower edge of the side glass is 22 mm from top of the wooden side elements. Hold the glass in place and drill holes (size 5) in advance with a depth of 30 mm.
  • Page 27 Start installation of side glass from second glass. This gives a better understanding that two glasses must be attached to one post and that their edges must extend evenly on the post so that there must be an equal gap between the glasses. Use glass assembly block for keeping equal gaps.
  • Page 28 22.3. INSTALLATION OF BACK WALL GLASS Start installation from largest glass OKS-03 and then complete installation with other glass. Place glass to intented location so that the lower edge of the glass is 22 mm from top of the back wall wooden element. Hold the glass in place and drill holes (size 5) in advance with a depth of 30 mm.
  • Page 29 Start installation from middle glass. This gives a better understanding that two glasses must be attached to one post and that their edges must extend evenly on the post so that there must be an equal gap between the glasses. Glass screws must align with side glass screws. NB! Align the glasses along the bottom edge.
  • Page 30 22.4. INSTALLATION OF FRONT WALL GLASS Start installation from largest glass OKS-02 and then complete installation with other glass. Place glass to intented location so that the lower edge of the glass is 22 mm from top of the front wall wooden element. Hold the glass in place and drill holes (size 5) in advance with a depth of 30 mm.
  • Page 31 23. INSTALLATION OF ROOF WINDOW OPENERS Greenhouse kit includes automatic roof window openers Bayliss Autovents mk7 triple spring. Roof window openers are in manufacturer original package. Install the roof window automatic openers according to the manufacturer instructions. Tip 1: Use a 4x20 stainless steel wood screws as these fit better than the ones provided from manufacturer and will not rust.