  • Page 3 Nr - No. ERA/LRN/Z 2/001 59-LZN 302 006 Uen Dokansv/Godkänd - Doc respons/Approved Kontr - Checked Datum - Date File ERA/LRN/Z 1999-09-20 Ericsson GSM System HEADING Fontsize 7 RBS 200 INSTALLATION MANUAL Module Fontsize 10 Module G LZN xxx xxx...
  • Page 5 Introduction CAPTION LIST Document No. 001 53-LZN 302 006 Safety Date 99-09-20 Site Installation Radio Cabinets Ericsson GSM System R4, R5, R6 and R7 version RBS 200 Power Supply Installation and Commissioning INSTALLATION MANUAL Module G Supplementary Information LZN 302 006 R7A...
  • Page 7 Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LRN/ZG 1/001 51-LZN 302 006 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZIC (Per Eklund) 1999-09-30 CME 20 RBS 200 G, List of Documents SEIF v0.11,...
  • Page 8 6/001 59-LZN 302 006 Uen B 174 01-LZN 302 006 Uen B CE Conformity Declaration Trouble Report Instruction 1/1553-COH 109 2014 Uen B Numbering of Ericsson Products 1312-COH 109 2014 Uen A and Documents SAFETY List of Headings 1/001 53-LZN 302 006 Uen B...
  • Page 9 1531-BFD 747 504 Uen B Installation Strapping Instructions Installation Strapping Instructions 7/1531-COH 109 2015/11 Uen A RBS 200-TRXT Installation RBS 200-TRXT Installation 8/1531-COH 109 2015/11 Uen A RBS 200 Installation Instructions RBS 200 Installation Instructions 9/1531-COH 109 2015/11 Uen A...
  • Page 10 OPEN INFORMATION DOCUMENT LIST 4 ( 5 ) Nr — No. 1/001 51-LZN 302 006 Uen Datum — Date File 1999-09-30 Sect. Document Name Document/File Ref. Number POWER SUPPLY INSTALLATION AND COMMISSIONING List of Headings 4/001 53-LZN 302 006 Uen B Power Supply 230V AC List of Headings 40/001 53-LZN 302 006 Uen B...
  • Page 11 OPEN INFORMATION DOCUMENT LIST 5 ( 5 ) Nr — No. 1/001 51-LZN 302 006 Uen Datum — Date File 1999-09-30 Sect. Document Name Document/File Ref. Number SUPPLEMENTARY INFORMATION List of Headings 5/001 53-LZN 302 006 Uen B Material Specification Material Specification 105 49-COH 109 2015/11 Uen B Lifting of Cabinet...
  • Page 13 Nr — No. ERA/LRN/ZI QRAJOJO 6/001 59-LZN 302 006 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZIC (Per Eklund) 1999-08-27 RBS 200 Introduction Contents Page Introduction Objectives Audience Scope of work Required references SEIF v0.11,...
  • Page 14 Radio techniques (basic, transmission), • Antenna techniques (mounting technique), • Telecommunication (speech/data transmission), • Ericsson material (marking, handling). Scope of work Before starting the installation, check that: • The site is ready for Installation (i.e. walls and ceilings painted, etc.) •...
  • Page 15 OPEN INFORMATION OTHER LZN-ASSOC. DOC. 3 ( 3 ) Nr — No. 6/001 59-LZN 302 006 Uen Datum — Date File 1999-08-27 RBS 200 − Antenna feeders and jumpers − Cable ladders − Earthing principles − Optical Fiber Connectoring Connectoring −...
  • Page 17 174 01-LZN 302 006 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZIC (Per Eklund) 1999-09-09 CE Declaration of Conformity Valid for RBS 200 Contents Page CE Declaration of Conformity Valid for RBS 200 SEIF v0.11,...
  • Page 18 2 ( 2 ) Nr — No. 174 01-LZN 302 006 Uen Datum — Date File 1999-09-09 CE Declaration of Conformity Valid for RBS 200 P001344A Product type: HRB 103 306 Model number: HRB 103 306 1/HRB 103 020 (RBS 200 Hardware) The product specified above conforms to the following European...
  • Page 19 OPEN INFORMATION DIRECTIONS FOR USE 1 ( 4 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI GUG 1/1553-COH 109 2014 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-03-12 Trouble Report Instruction Contents Page Trouble Report on Equipment or on this Manual...
  • Page 20 The trouble report should be sent to the nearest FSC for resolution and registration in the Ericsson trouble report system MHS (Modifica- tion Handling System). The FSC should forward the trouble report via the node MHO ERA BTS.
  • Page 21: Trouble Report

    OPEN INFORMATION DIRECTIONS FOR USE 3 ( 4 ) Nr — No. 1/1553-COH 109 2014 Uen Datum — Date File 1998-03-12 Example of Filled-in Trouble Report Trouble Report Company: Date: Issued by: Phone no: Address Memo id: Telefax no: Heading: Product number or Document number: R-state Site name:...
  • Page 22 OPEN INFORMATION DIRECTIONS FOR USE 4 ( 4 ) Nr — No. 1/1553-COH 109 2014 Uen Datum — Date File 1998-03-12 Trouble Report, Blank Trouble Report Company: Date: Phone no: Issued by: Address Memo id: Telefax no: Heading: Product number or Document number: R-state Site status: Site id:...
  • Page 23 1312-COH 109 2014 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-01-30 Numbering of Ericsson Products and Documents Contents Page Numbering of Ericsson Products and Documents Product numbering Document numbering The structure of a document number...
  • Page 24 File 1998-01-30 Numbering of Ericsson Products and Documents Ericsson products and documents are clearly and uniquely identified by a product or document number. This section is intended to provide basic information about the construction and use of the Ericsson numbering system.
  • Page 25 The structure of a document number Document number Unique within Ericsson 1234±ABC 123 45 Uen Decimal class The individual number is a product number...
  • Page 26 OPEN INFORMATION ABC-INFORMATION 4 ( 6 ) Nr — No. 1312-COH 109 2014 Uen Datum — Date File 1998-01-30 PRODUCT PRODUCT DOCUMENT Circuit Diagram 1911±ROF 123 33 Uen Decimal class 1911± The Decimal class is designates the document linked with the as a circuit diagram product ROF 123 33 Test Instructions...
  • Page 27 OPEN INFORMATION ABC-INFORMATION 5 ( 6 ) Nr — No. 1312-COH 109 2014 Uen Datum — Date File 1998-01-30 DOCUMENT PRODUCT R±state Rev±state Marking of the Marking of the original product original document version version ROF 123 33 R1A 1911±ROF 123 33 Uen Rev A CHANGE A new component is to be introduced into the...
  • Page 28 ”Document survey” The product number Figure 6 Document survey 1.5.1 For more information For more information regarding Ericsson product and documentation numbering, please contact the office below: Telefonaktiebolaget LM Ericsson: Telephone: +4687195011 Corporate Core Unit IM/IT TV/LME/R SE-126 25 Stockholm, SWEDEN...
  • Page 29: Label Location

    Safety CAPTION LIST Document No. 1/001 53-LZN 302 006 Label Location Date 99-09-20 Safety RBS 200 Installation Manual...
  • Page 31 OPEN INFORMATION SAFETY INSTRUCTION 1 (15) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI 1/124 46-COH 109 2014 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1997-10-22 Safety Contents Page Safety General Beryllium Oxide (BeO) Electricity related Hazards...
  • Page 32 Reduce risks of accidents by studying all instructions carefully beforestarting work. If questions arise regarding the safety instructions, contact the supervisor or the local Ericsson company. Where local regulations exist, these are to be followed. The safety information in this manual is a supplement to local regulations.
  • Page 33 OPEN INFORMATION SAFETY INSTRUCTION 3 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 WARNING Warning means that an accident may occur if safety precautions are neglected. This type of accident may be fatal or seriously injure human beings.
  • Page 34 OPEN INFORMATION SAFETY INSTRUCTION 4 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 1.1.2 Notes Notes are used to call the reader’s attention to key points that might otherwise be overlooked. Beryllium Oxide (BeO) WARNING Beryllium oxide is a toxic chemical found in transistors and other com- ponents.
  • Page 35 OPEN INFORMATION SAFETY INSTRUCTION 5 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 1.2.6 Power transistors, diodes and thyristors WARNING Do not carry components loose in a pocket, bag or container where they ma break and disintegrate into dust. Do not apply excessive heat during soldering (normal soldering is quite safe).
  • Page 36 OPEN INFORMATION SAFETY INSTRUCTION 6 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 1.2.8 Cathode ray tubes (CRTs) and ceramic applications WARNING Do not handle broken glass with bare fingers. Do not blow on exposed surfaces due to danger of Beryllium inhalation.
  • Page 37 OPEN INFORMATION SAFETY INSTRUCTION 7 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 Dispose of defective and/or broken Beryllia components in special containers. WARNING Defective and/or broken components containing Beryllia MUST NOT BE SENT THROUGH THE MAIL Return to the nearest depot BY HAND.
  • Page 38 OPEN INFORMATION SAFETY INSTRUCTION 8 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 1.3.2 Faulty Electric Tools WARNING Do not repair a faulty electric tool yourself. Hand it over to the supervisor in exchange for a functioning tool. 1.3.3 Drilling WARNING...
  • Page 39 Handling PCB assemblies and IC components To avoid damage to components mounted on printed board assem- blies, always use an approved antistatic bracelet such as the Ericsson wrist strapLYB 250 01/14 . The ESD wrist strap must be connected to earth.
  • Page 40 OPEN INFORMATION SAFETY INSTRUCTION 10 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 Figure 3 ESD wrist strap LYB 25001/14. 1.3.7 Storing and transporting PCB assemblies and IC components Use the original packaging. If this is not available, use a conductive material or special IC carrier that either short circuits all leads or isolates them from external contact.
  • Page 41 OPEN INFORMATION SAFETY INSTRUCTION 11 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 • Remove wrist watches, rings, bracelets, etc. • Use insulated tools • Make sure that eye wash facilities, or portable eye wash equipment, is available prior to starting work.
  • Page 42 OPEN INFORMATION SAFETY INSTRUCTION 12 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 Check that the batteries have not leaked. If the batteries have leaked, see next section, Hazardous Waste Material From Leaks. 1.4.5 Hazardous Waste Material From Leaks Ensure that there are sufficient quantities of absorbents or neutraliz- ing materials available on site in case of a hazardous material spill.
  • Page 43 OPEN INFORMATION SAFETY INSTRUCTION 13 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 • During work on masts or towers, all personnel in the area must wear helmets. • Rope off hazardous areas to prevent public access. 1.5.2 Radio Frequency Radiation CAUTION...
  • Page 44 OPEN INFORMATION SAFETY INSTRUCTION 14 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 • Make sure that there is never an angle of more than 90 degrees between the straps at the point where they are attached to the lifting hook.
  • Page 45 OPEN INFORMATION SAFETY INSTRUCTION 15 (15) Nr — No. 1/124 46-COH 109 2014 Uen Datum — Date File 1997-10-22 1.6.2 Fire WARNING When working on a radio base station, cable ducts, channels and ac- cess holes may have to be opened, thereby interfering with the fire sectioning of the building, allowing a fire to spread to neighbouring rooms.
  • Page 47: Label Locations

    OPEN INFORMATION DESCRIPTION 1 ( 2 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI GUG 1551-COH 109 2014/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1997-11-19 Label Locations Contents Page SEIF v0.11,...
  • Page 48 OPEN INFORMATION DESCRIPTION 2 ( 2 ) Nr — No. 1551-COH 109 2014/1 Uen Datum — Date File 1997-11-19 Figure Page figure 1 Label locations W A R N I N G VOLTAGE AND ENERGY HAZARD Switch off both mains and battery and discharge battery connection before opening lid.
  • Page 49 OPEN INFORMATION FLOOR PLAN DRAWING 1 (13) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI GUG 153 31-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-01-30 Site Installation Contents Page Introduction...
  • Page 50 OPEN INFORMATION FLOOR PLAN DRAWING 2 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Introduction These installation guidelines give general information concerning installation of a Radio Base Station (RBS) with associated equipment. Equipment is selected mainly during the system design phase, and these guidelines show how to select the installation method based on the system design and local conditions.
  • Page 51: Space Requirements

    Datum — Date File 1998-01-30 Space requirements An RBS 200 installation comprises a number of cabinets and auxiliary equipment such as air conditioners, mains panel, main distribution frame, transmission systems and battery stands. See the site installation example, figure 1.
  • Page 52 OPEN INFORMATION FLOOR PLAN DRAWING 4 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Battery Stand Radio cabinets Distribution field Figure 1 Site installation example...
  • Page 53 OPEN INFORMATION FLOOR PLAN DRAWING 5 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Transceiver group cabinets Cabinets in the same transceiver group must always be placed beside each other as shown in figure 2 and figure 3. Master Extension Cabinet...
  • Page 54 OPEN INFORMATION FLOOR PLAN DRAWING 6 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 10±50 10±50 Figure 4 Distance to walls and corners Double row arrangement At sector sites where a double row arrangement is used, a minimum distance of 1000 mm must be provided between cabinet rows.
  • Page 55 OPEN INFORMATION FLOOR PLAN DRAWING 7 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 1000 1000 Figure 6 Expansion principle Battery Stand Each Battery Stand contains batteries and fuses for a maximum of three radio cabinets. The Battery Stand shall be located no more than 15 m from the radio cabinets to minimize the voltage drop in the distribution cables.
  • Page 56 OPEN INFORMATION FLOOR PLAN DRAWING 8 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 min. 300 min. 200 Free space 2000 Figure 7 Free space requirements Mounting height of cable ladders The minimum mounting height of cable ladders is 2200 mm leaving at least 300 mm for access to cable runways.
  • Page 57: Floor, Walls

    OPEN INFORMATION FLOOR PLAN DRAWING 9 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Floor, walls The floor shall be level. The slope must not exceed ±3 mm/2 m in order to allow the adjustable cabinet feet to take up the irregularities. If a conductive floor is used, the cabinet feet must be isolated from the floor.
  • Page 58 OPEN INFORMATION FLOOR PLAN DRAWING 10 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Floor space Radio cabinet 0.84 m Aisle (D=400; W=602) Battery Stand, 29 Ah 0.48 m (D=375; W=350) Cabinet Battery Stand, 134 Ah 0.81 m (D=375;...
  • Page 59 OPEN INFORMATION FLOOR PLAN DRAWING 11 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Doors, windows The equipment room (site) shall be provided with a lockable door, wide enough to allow passing equipment through without dismantling. The equipment also has lockable doors.
  • Page 60 OPEN INFORMATION FLOOR PLAN DRAWING 12 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Environment, ventilation The equipment generates considerable heat, typically 1300 W per ra- dio cabinet. To keep the temperature within specified limits an air conditioning system is required.
  • Page 61: Electrical Installation

    OPEN INFORMATION FLOOR PLAN DRAWING 13 (13) Nr — No. 153 31-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Electrical installation DANGER High voltage (more than 200V) is used in the operation of this equip- ment. Direct contact with mains power can be fatal, and indirect contact via damp items may also be fatal.
  • Page 63: Radio Cabinet

    General Cabinet Information CAPTION LIST Document No. 3/001 53-LZN 302 006 Master Cabinet BDE 201 162/-- Date 99-09-20 Extension Cabinet Radio Cabinet External Cabling Labelling RBS 200 Installation Manual Co-siting Connection of TRI Strapping Instructions RBS 200-TRXT Installation RBS 200 Installation Instructions...
  • Page 65: Table Of Contents

    OPEN INFORMATION INSTALLATION INSTRUCTION 1 (77) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LRN/ZG ERAWAIN 1/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZGC Lars-Olof Fager 1999-10-06 General Cabinet Information Contents Page General Cabinet Information...
  • Page 66 OPEN INFORMATION INSTALLATION INSTRUCTION 2 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Internal Cabling General Internal Cabling Definition Power Supply Distribution Cabling Cabinet Bus Cabling Signal Cabling to Cabinet Connection Field on Cabinet RX Cabling TX Cabling Alarm Cabling Cabinet Bus...
  • Page 67: General Cabinet Information

    (with reference to combiner type, magazine installed in the cabinet, etc). Mechanical Data The mechanical layout of the cabinet for 19" magazines used for the RBS 200 system is shown in figure 1. Measurements: • height: 1970 mm •...
  • Page 68 OPEN INFORMATION INSTALLATION INSTRUCTION 4 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 1 RBS 200 cabinet mechanical layout...
  • Page 69: Cabinet Installation

    OPEN INFORMATION INSTALLATION INSTRUCTION 5 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Cabinet Installation Scope of Work This instruction covers: • Installation of cabinet • Equipping the magazines Prerequisites Before the installation begins, check that: •...
  • Page 70: Cabinet Fastening

    OPEN INFORMATION INSTALLATION INSTRUCTION 6 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Before opening the crates, check the delivery docu- ments to make sure that the correct material has been delivered. WARNING There is a danger of the assembly toppling over, which could cause injury to personnel or damage to the equipment.
  • Page 71 OPEN INFORMATION INSTALLATION INSTRUCTION 7 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Note Always use eye protectors (goggles) such as 25072 when drilling in walls, ceilings, floors or other objects where flying chips and dust may get into eyes. Drill the fastening holes;...
  • Page 72 OPEN INFORMATION INSTALLATION INSTRUCTION 8 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 FRONT P003868A Figure 3 Drill template drawing, 3-hole version In the case of a 3-hole cabinet floor, mount a retaining washer and spacer (included in NTM 201 293/1) in the rear floor hole as shown in figure 4.
  • Page 73 OPEN INFORMATION INSTALLATION INSTRUCTION 9 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 In case of a 3-hole cabinet floor, use the two adjustable feet in front. In the case of a 4-hole cabinet floor, unscrew the 4 screws which hold the TM/PSU magazine when installed and remove it carefully.
  • Page 74 OPEN INFORMATION INSTALLATION INSTRUCTION 10 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Older version with 4 holes and 4 bolts Newer version with 3 holes and 3 bolts Bolt and washer un- der detachable dust cover Figure 5 Securing the cabinet to floor...
  • Page 75: Cabinet Door

    OPEN INFORMATION INSTALLATION INSTRUCTION 11 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Secure the cabinet(s) to the floor with 4 or 2 bolts with washers as shown in figure 5. Install a suspension bar using an angle bracket from the top of the cabinet(s) to the cable ladder or to the wall.
  • Page 76 OPEN INFORMATION INSTALLATION INSTRUCTION 12 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 7 Pressing the spring loaded pivot to its lower position Pull the door away from the upper hinge and lift it up to release the pivot from the lower hinge.
  • Page 77 OPEN INFORMATION INSTALLATION INSTRUCTION 13 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 2.6.3 Door Lock Figure 8 Activating the door lock The key can only be removed from the door lock in a locked position. To allow the door to be unlocked and without a key in the lock during transportation and installation, the locking plate has been factory mounted 90 degrees, a) in figure 8, from its normal locked position,...
  • Page 78: Cabinet Designation System

    1999-10-06 Cabinet Designation System Designation of Hardware Positions To facilitate locating hardware units during installation and mainte- nance, the RBS 200 cabinet is divided into a coordinate system, see figure 9. 3.1.1 Cabinet Height Vertical Division Division into levels 00 to 12, starting at the top.
  • Page 79 OPEN INFORMATION INSTALLATION INSTRUCTION 15 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 9 Cabinet hardware positions...
  • Page 80: Designation Of Internal Cabling

    OPEN INFORMATION INSTALLATION INSTRUCTION 16 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Printed Circuit Boards (PCB) Principle for locating a PCB coordinate parameter in a magazine is shown in figure 10. TRXCONV TRXC Pos 01 Pos 09 Figure 10 Principle for locating PCB coordinate parameter in a magazine...
  • Page 81 OPEN INFORMATION INSTALLATION INSTRUCTION 17 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 VV/HH*CC where: CC = cable connection point parameter Parameter CC is in most cases given in plain text, corresponding to the marking on the front of the circuit board. For connection to the O&M Bus/TIB connector on the TRXC board shown in figure 10, the complete parameter is: 04/09*O&M,TIB...
  • Page 82: Cabinet Identity And Connection Point Parameters

    OPEN INFORMATION INSTALLATION INSTRUCTION 18 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Cabinet Identity and Connection Point Parameters As TRI signals are distributed between cabinets, information concern- ing the cabinet identity needs to be specified. By adding the cabinet identity (ZZ) to the hardware and connection point parameters, a set of parameters with the following format is obtained: ZZ*VV/HH*CC, where ZZ = Cabinet identity A1, B1 or C1.
  • Page 83 OPEN INFORMATION INSTALLATION INSTRUCTION 19 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 230V AC IN -48 IN -48 TO PSU PSU 61 PSU (43) PSU (64) PSU 37 PSU 37 PSU 61 (FRONT PANEL) Fan Unit Tx-0 Rx-A...
  • Page 84: Cabinet Standard Units

    OPEN INFORMATION INSTALLATION INSTRUCTION 20 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Cabinet Standard Units Internal Distribution Module, IDM The IDM unit is always mounted in the cabinet, pos. 01. ESD anti- static wrist strap Figure 13 The IDM unit The IDM unit contains:...
  • Page 85: Cabinet Bus

    OPEN INFORMATION INSTALLATION INSTRUCTION 21 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 14 ESD wrist strap LYB 25 001/14 Cabinet Bus The CCB boards ROA 119 8535/3 are the connection field for vertical and horizontal bus cable plugs.
  • Page 86 OPEN INFORMATION INSTALLATION INSTRUCTION 22 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Table 1 Fig. 16 Product Number Description Note Item RPM 513 352/1 Conn. cable CCB-CCB RPM 513 352/2 Conn. cable CCB-CCB 1) , 2) RPM 513 393/1 Conn.
  • Page 87 OPEN INFORMATION INSTALLATION INSTRUCTION 23 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 16 CCB connection cables and plugs...
  • Page 88: Filter Units Rxbp

    OPEN INFORMATION INSTALLATION INSTRUCTION 24 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Filter Units RXBP Filter units are located on the left hand side of the cabinet, as seen from the front. Each filter unit is fastened with four screws. Two filter units RXBP(A) and RXBP (B) are normally factory installed.
  • Page 89: Filter Unit Txbp

    OPEN INFORMATION INSTALLATION INSTRUCTION 25 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 17 Filter units RXBP, KRF 101 18/01 to the left and KRF 101 19/01 to the right Filter Unit TXBP The filter unit is located on the right hand side of the cabinet, as seen from the front.
  • Page 90: Fan Units

    OPEN INFORMATION INSTALLATION INSTRUCTION 26 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 For hybrid combiners, a 6-pole filter KRF 201 089/1 is used. Figure 18 Filter unit TXBP, KRF 101 16/01 to the left and KRF 201 089/1 to the righ Fan Units The cabinet contains four fan units with two types of fans.
  • Page 91 OPEN INFORMATION INSTALLATION INSTRUCTION 27 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 BKV 301 230/1 BKV 301 216/11 BKV 301 231/1 BKV 301 216/11 4.5.1 Fan Control Unit, FCU ROA 119 3065/1 and Fan Control Unit Super, FCUS KER 131 101/1 Fan Control Unit (FCU) or Fan Control Unit Super (FCUS) for the fans in pos.
  • Page 92 OPEN INFORMATION INSTALLATION INSTRUCTION 28 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 20 Fan units...
  • Page 93: Equipping Magazines With Pcbs And Units

    Static electricity is generated when materials are rubbed together. Note Use Ericsson anti-static wrist strap LYB 25 001/14. The magazines are pre-installed in the cabinet, with the exception of the TRI magazine. The units have to be plugged in during installation.
  • Page 94 OPEN INFORMATION INSTALLATION INSTRUCTION 30 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 • position 06 for TRXD/RRX 3 and 4 Mount dummy front SDK 107 61/06 on unequipped magazine positions. If antenna diversity is not used, equip RXB positions with 50 ohm terminators ZRB 107 0107/001.
  • Page 95 OPEN INFORMATION INSTALLATION INSTRUCTION 31 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 21 The TRXD magazine equipped with SPP boards...
  • Page 96: Trxd Magazine Bfl 119 71/3 (With Spu, Spu+/Spe, Spu++ Boards)

    OPEN INFORMATION INSTALLATION INSTRUCTION 32 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 TRXD Magazine BFL 119 71/3 (with SPU, SPU+/SPE, SPU++ Boards) The magazine is designed for mounting two complete sets of circuit boards for TRXD function. The magazine can be installed in the cabinet, pos.
  • Page 97 OPEN INFORMATION INSTALLATION INSTRUCTION 33 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 22 TRXD magazine equipped with SPU boards...
  • Page 98: H-Comb Magazine Bfl

    OPEN INFORMATION INSTALLATION INSTRUCTION 34 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 H-COMB Magazine BFL 119 72/2 The Hybrid-Combiner magazine is designed for mounting Receiver multicouplers for up to four receivers with diversity and combiners for up to four transmitters.
  • Page 99 OPEN INFORMATION INSTALLATION INSTRUCTION 35 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 23 H-COMB magazine equipped...
  • Page 100: F-Comb Magazine Bfl

    OPEN INFORMATION INSTALLATION INSTRUCTION 36 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 F-COMB Magazine BFL 119 72/3 The Filter-Combiner magazine is designed for mounting of Receiver multicouplers for up to 16 receivers with diversity, combiners and Transmitter divider for up to four transmitters.
  • Page 101 OPEN INFORMATION INSTALLATION INSTRUCTION 37 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 24 F-COMB magazine equipped...
  • Page 102: Adapter, End-Links And U-Links

    OPEN INFORMATION INSTALLATION INSTRUCTION 38 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Adapter, End-Links and U-Links The Adapter KRY 101 1352/1 and the End-link RPM 113 13/01 are mounted with four stainless steel screws, type MCS 4 x 16. For the U-link KRY 101 1442/1, 8 screws type MCS 4 x 22 are used.
  • Page 103 OPEN INFORMATION INSTALLATION INSTRUCTION 39 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 25 Using adapter, End-links and U-links...
  • Page 104: Rtx Magazine Bfl

    OPEN INFORMATION INSTALLATION INSTRUCTION 40 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 RTX Magazine BFL 119 71/5 The RTX magazine is designed for mounting of up to four transmitters with an output power of 45 W each. The magazine is designed for mounting of the following units: •...
  • Page 105 Power in Power in Power in Comb.Ctrl Comb.Ctrl Comb.Ctrl Comb.Ctrl Power Power Power Power Reset Reset Reset Reset Error Error Error Error Power out Power out Status Status Status Status RF Bypass Power in Power in RF Bypass TX-bus TX-bus TX-bus TX-bus O&M-bus/TIB...
  • Page 106: Tm/Psu Magazine Bfl 119 73/1 (230 V Ac)

    OPEN INFORMATION INSTALLATION INSTRUCTION 42 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 TM/PSU Magazine BFL 119 73/1 (230 V AC) The magazine is designed for mounting the following units: • Timing Module Connection Board, TMCB •...
  • Page 107 OPEN INFORMATION INSTALLATION INSTRUCTION 43 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 P005449A Figure 27 TM/PSU magazine equipped (230 V AC)
  • Page 108: Tm/Psu Magazine Bfl 119 74/1 (-48 V Dc)

    OPEN INFORMATION INSTALLATION INSTRUCTION 44 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 TM/PSU Magazine BFL 119 74/1 (-48 V DC) The magazine is designed for mounting the following units: • Timing Module Connection Board, TMCB •...
  • Page 109 OPEN INFORMATION INSTALLATION INSTRUCTION 45 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 P005448A Figure 28 TM/PSU magazine equipped (-48 V DC)
  • Page 110: Tm Magazine Bfl 119 76/1 (+24 V Dc)

    OPEN INFORMATION INSTALLATION INSTRUCTION 46 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 TM Magazine BFL 119 76/1 (+24 V DC) The magazine is designed for mounting the following units: • Timing Module Connnection Board, TMCB •...
  • Page 111 OPEN INFORMATION INSTALLATION INSTRUCTION 47 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 P005450A Figure 29 TM magazine equipped (+24 V DC)
  • Page 112: Tri Magazine Bfd

    OPEN INFORMATION INSTALLATION INSTRUCTION 48 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 5.10 TRI Magazine BFD 747 504/11 The magazine contains equipment for communication between the radio equipment on site and the Base Station Controller (BSC). The TRI magazine is designed in conventional BYB mechanics with additional brackets and cover to fit the 19"...
  • Page 113: Tri Magazine Bfd

    OPEN INFORMATION INSTALLATION INSTRUCTION 49 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Note TRI magazine BFD 747 504/11 replaces TRI magazine BFL 119 71/1 (BFD 747 504). See section 6.0. 5.11 TRI Magazine BFD 747 504/22 Equipped as BFD 747 504/11 but having two STRP, two ETB and two RTT boards.
  • Page 114 OPEN INFORMATION INSTALLATION INSTRUCTION 50 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 30 TRI magazine equipped...
  • Page 115: Internal Cabling

    OPEN INFORMATION INSTALLATION INSTRUCTION 51 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Internal Cabling General For all cabling, see the Internal cabling diagrams. The cabling within cabinets may vary, depending on cabinet type and version.
  • Page 116 OPEN INFORMATION INSTALLATION INSTRUCTION 52 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 • The TIB/O&M bus, distributed via jack 4 and 5 on the CCB board. Signal Cabling to Cabinet Connection Field on Cabinet Top The signal cabling contains: •...
  • Page 117 OPEN INFORMATION INSTALLATION INSTRUCTION 53 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Cabinet Bus The CCB boards ROA 119 8535/3 are the connection field for vertical and horizontal bus cable plugs. See figure 31 below. Figure 31 A CCB board ROA 119 8535/3 CCB boards with vertical bus cables and connectors are factory...
  • Page 118 OPEN INFORMATION INSTALLATION INSTRUCTION 54 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Conn. cable TX/BUS-TRXC 1 RPM 513 391/1 Conn. cable TX/BUS-TRXC 1 RPM 513 390/1 RPM 513 392/1 Conn. cable TX/BUS-RTX Factory installed 2 pcs with extension cabinet...
  • Page 119 OPEN INFORMATION INSTALLATION INSTRUCTION 55 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 32 CCB connection cables and plugs...
  • Page 120: External Cabling

    1999-10-06 External Cabling General For all cabling diagrams, see 3.3; External cabling. External Cabling Definition The external cabling is all cabling to the RBS 200 cabinet and is divided up as follows: • AC and DC power cabling • Signal cabling •...
  • Page 121 OPEN INFORMATION INSTALLATION INSTRUCTION 57 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 7.3.1 DC Cabling CAUTION Read Safety instructions regarding handling of batteries. When connecting Batteries (+24V DC), two cables must be laid between the BIM module and the connection field in the IDM. •...
  • Page 122 The electrical installation comprises a 380/220V AC panel with all wiring for lighting, air-conditioners, alarm system, service outlets, power supply units in the RBS 200 cabinets as well as an earth collection bar. The mains panel shall be provided with a 16 A automatic circuit breaker for each power supply unit.
  • Page 123 OPEN INFORMATION INSTALLATION INSTRUCTION 59 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Table 14 Distance to BTS Cable Type Product No. Fuse, Rack minimum TFK100508/08 80 A TFK100509/08 80 A 80 A TFK100510/08 TFK100511/08 80 A TFK100514/08 80 A...
  • Page 124 The PCM cables, 75 ohm coaxial or 120 ohm pair cables, connect the 2 Mb/s bitstreams between the Distribution Field (DF) and the ETB board (s) in the TRI magazine, placed in RBS 200 cabinet A1. The cables are prefabricated with one end connectorized with BNC for 75 ohm, DIN connector for 120 ohm, and the other end free, Total cable length is 15 meter.
  • Page 125 OPEN INFORMATION INSTALLATION INSTRUCTION 61 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Each ETB board will be connected with one cable for receive signal and one for transmit signals. The Distribution Frame (DF) is shown in figure 34. •...
  • Page 126 OPEN INFORMATION INSTALLATION INSTRUCTION 62 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 34 Distribution Frame, DF...
  • Page 127 Prefabricated cable set BMY 105 045/1, which includes two sepa- rately delivered connectors, is used for making the site specific cables for the alarm loop between the battery rack and the RBS 200 cabinet. Before connectorizing, see General Installation Instructions.
  • Page 128 External Alarms External alarms from Fire Alarm Panel, Air Conditioner, Door Alarm control units, etc. can be connected to the RBS 200 system for trans- fer and display of remote alarms to the Maintenance Organization. There is a possibility of connecting 32 alarms to the EXALI board in the TRI but some alarm positions are occupied by internal alarms for ACU and PSU.
  • Page 129 OPEN INFORMATION INSTALLATION INSTRUCTION 65 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Connect the free end of the cable to the Distribution Field (DF). See recommendations in table 18, table 19 and table 20. Connect customers remote alarms to the DF.
  • Page 130 OPEN INFORMATION INSTALLATION INSTRUCTION 66 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 35 Marking plug for marking internally used alarms in the DF Table 18 Recommended alarm connections for 230 V AC power supply Distribution Frame EXALI Cross-Connection...
  • Page 131 OPEN INFORMATION INSTALLATION INSTRUCTION 67 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Distribution Frame EXALI Cross-Connection Input Description From 1: VSWR P3/01ab 2: RXDA (1) Cell A P3/02ab 3: RXDA (2) ACU 1 P3/03ab 4: FAN ALARM P3/04ab P3/05ab...
  • Page 132 OPEN INFORMATION INSTALLATION INSTRUCTION 68 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 36 230 V AC alarm connection cabling diagram...
  • Page 133 OPEN INFORMATION INSTALLATION INSTRUCTION 69 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Table 19 Recommended alarm connections for -48 V DC power supply Distribution Frame EXALI Cross-Connection Input Description From P1/01a,b P1/02a,b P1/03a,b P1/04a,b For customer use P1/05a,b P1/06a,b...
  • Page 134 OPEN INFORMATION INSTALLATION INSTRUCTION 70 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Distribution Frame EXALI Cross-Connection Input Description From P4/04ab P4/05ab P4/06ab Alarms from sectors B and C.
  • Page 135 OPEN INFORMATION INSTALLATION INSTRUCTION 71 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 37 -48 V DC Alarm connection cabling diagram...
  • Page 136 OPEN INFORMATION INSTALLATION INSTRUCTION 72 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Table 20 Recommended alarm connections for +24 V DC power supply Distribution Frame EXALI Cross-Connection Input Description From P1/01a,b P1/02a,b P1/03a,b P1/04a,b For customer use P1/05a,b P1/06a,b...
  • Page 137 OPEN INFORMATION INSTALLATION INSTRUCTION 73 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Distribution Frame EXALI Cross-Connection Input Description From P4/04ab P4/05ab P4/06ab Alarms from sectors B and C.
  • Page 138 OPEN INFORMATION INSTALLATION INSTRUCTION 74 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Figure 38 +24 V DC alarm connection cabling diagram...
  • Page 139 OPEN INFORMATION INSTALLATION INSTRUCTION 75 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Cable installation method Use a prefabricated cable type RPM 513 338 as shown in figure 38. The cable has one end fitted with a connec- tor and the other end free.
  • Page 140 OPEN INFORMATION INSTALLATION INSTRUCTION 76 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Position terminal tool against the slot and the wire, see figure 40. Press the tool firmly into the slot. The wire is now connected and cut at the same time.
  • Page 141 OPEN INFORMATION INSTALLATION INSTRUCTION 77 (77) Nr — No. 1/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Earthing For Earthing methods, see General Installation Instructions. LZN 302 49 General Installation Instructions...
  • Page 143 OPEN INFORMATION INSTALLATION INSTR. 1 (24) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LRN/ZG ERAWAIN 2/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZGC (Leif-Olof Fager) 1999-10-07 Master Cabinet BDE 201 162/- Contents Page Equipment specification...
  • Page 144 Datum — Date File 1999-10-07 Figure Page figure 1 RBS 200 Master cabinet, fully equipped figure 2 Cabinet BDE 201 162/100, hardware positions figure 3 +24V DC distribution cabling diagram (general) figure 4 -48V DC and 230V AC power supply cabling figure 5...
  • Page 145: Equipment Specification

    OPEN INFORMATION INSTALLATION INSTR. 3 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Equipment specification Figure 1 RBS 200 Master cabinet, fully equipped...
  • Page 146 OPEN INFORMATION INSTALLATION INSTR. 4 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Index register The following selections of the cabinet are available: • Standard or extended RXBP filter • Power Supply +24V DC, −48V DC or 230V AC •...
  • Page 147 OPEN INFORMATION INSTALLATION INSTR. 5 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Master RXBP Power COMB Receiver Index cabinet type Supply type Diversity /118 /119 /03 X C12 /121 /122 /123 /124 /125 /126 /127 /128 /129...
  • Page 148 OPEN INFORMATION INSTALLATION INSTR. 6 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Product number Designation RTX PF KRF 101 13/01 KRF 101 13/02 RTX PB ROF 366 141/- ROF 366 284/- SPU alt. SPU+ ROF 366 142/2 TRXC Filter RXDA...
  • Page 149 OPEN INFORMATION INSTALLATION INSTR. 7 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 See Chapter 4 in this manual for information on TRXD magazine BFL 119 71/3 and IE manual Chapter 10, "Dimensioning and Ordering." The choice of combiner is made by selecting the index number, which is added to the basic cabinet product number.
  • Page 150 OPEN INFORMATION INSTALLATION INSTR. 8 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Figure 2 Cabinet BDE 201 162/100, hardware positions...
  • Page 151 OPEN INFORMATION INSTALLATION INSTR. 9 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Cabinet BDE 162/-, delivery equipped On delivery, the cabinet is equipped as follows. See also figure 2. Table 3 Vertical pos. Item Dummy front, SDK 107 61/6 (in TRI position) Magazine TRXD, BFL 119 71/3 Dummy front, SDK 107 6/6 (in TRXD position)
  • Page 152 OPEN INFORMATION INSTALLATION INSTR. 10 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Check that the screws are securely fastened to ensure that a good contact is obtained between magazine and cabinet. Cables included in the manufacturing specification Table 4 Cables sorted according to product number, Figures 3 to 10 Product number...
  • Page 153 OPEN INFORMATION INSTALLATION INSTR. 11 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Product number Item Figure Vertical Installed Label pos. in prod. on site RPM 513 389/1 Power cable RPM 513 390/1 Connection cable RPM 513 391/1 Connection cable RPM 513 392/1...
  • Page 154 OPEN INFORMATION INSTALLATION INSTR. 12 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Product number Item Figure Vertical Installed Label pos. in prod. on site TRE 211 049 Power cable TSR 204 0201/500 Connection cable TSR 901 0197/1700 Connection cable Note...
  • Page 155 OPEN INFORMATION INSTALLATION INSTR. 13 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Power cable RPM 513 455/1 Power cable TRE 211 048/1 Power cable TRE 211 048/2 Power cable TRE 211 049 Figure 5 Coaxial cable RPM 513 363/1 Connection cable...
  • Page 156 OPEN INFORMATION INSTALLATION INSTR. 14 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Coaxial cable RPM 513 421/2 Connection cable RPM 513 425/1 Coaxial cable RPM 513 427/1330 Figure 8 Coaxial cable RPM 513 424/1 Coaxial cable RPM 513 424/2 Coaxial cable...
  • Page 157 OPEN INFORMATION INSTALLATION INSTR. 15 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Power cable 24V RPM 513 351/1 Coaxial cable RPM 513 370/4 Coaxial cable RPM 513 424/3...
  • Page 158 RXD/ Conn. TRXD TRXD COMB field unit shelf slot shelf unit shelf slot shelf unit unit unit shelf V-POS FUSE 1 RTX1 01* Power RTX 80 RTXPF1 61A*out RPM 513 389/1 00B* DC/DC RTX2 13* Power RTXPF2 61B*out TRX conv Power RPM 513 409/1 -”-...
  • Page 159 OPEN INFORMATION INSTALLATION INSTR. 17 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Figure 4 -48V DC and 230V AC power supply cabling...
  • Page 160 OPEN INFORMATION INSTALLATION INSTR. 18 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Figure 5 TRI Cabling diagram (general)
  • Page 161 OPEN INFORMATION INSTALLATION INSTR. 19 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Figure 6 Bus cabling diagram (general)
  • Page 162 RXD/ CONN. TRXD TRXD COMB field unit shelf slot shelf unit shelf slot unit shelf unit shelf shelf V-POS. G*RXA L*IN RXA-RXBP (A) L*OUT RPM 513 421/2 01*IN RXBP(A)-RXDA 01*HL1 RXDA RPM 513 376/1 RPM 513 368/3 06*IN 2) 13*RXA RPM 513 368/6 06*1 RRX1-RXD...
  • Page 163 OPEN INFORMATION INSTALLATION INSTR. 21 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Figure 8 TX cabling diagram (F-combiner)
  • Page 164 OPEN INFORMATION INSTALLATION INSTR. 22 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Figure 9 TX cabling diagram (H-combiner)
  • Page 165 RXD/ Conn. TRXD TRXD COMB field unit shelf slot shelf unit shelf slot shelf unit unit unit shelf V-POS 23*Alarm/ Fan* Alarm RPM 513 365/1 Int. Alarms-ACU Service 1F Fan* P6 01*Alarm 01*Alarm 43*Alarm 43*Alarm Fan* P6 Fan* P6 RPM 513 615/1 Ext.
  • Page 166 OPEN INFORMATION INSTALLATION INSTR. 24 (24) Nr — No. 2/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-07 Figure 11 TRXT, internal cabling...
  • Page 167 OPEN INFORMATION INSTALLATION INSTR. 1 (26) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI GUG 3/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-03-12 Extension Cabinet BDE 201 162/– Contents Page Equipment specification...
  • Page 168 Datum — Date File 1998-03-12 Figure Page figure 1 RBS 200 Extension cabinet, fully equipped figure 2 Cabinet BDE 201 162/200, hardware positions figure 3 +24V DC distribution cabling diagram (general) figure 4 -48V DC and 230V AC Power supply cabling figure 5...
  • Page 169 OPEN INFORMATION INSTALLATION INSTR. 3 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Equipment specification Figure 1 RBS 200 Extension cabinet, fully equipped...
  • Page 170 OPEN INFORMATION INSTALLATION INSTR. 4 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Index register The following selections of the cabinet are available: • Power Supply +24V DC, -48V DC or 230V AC • Filter combiner Table 1 Index Register Extension...
  • Page 171 OPEN INFORMATION INSTALLATION INSTR. 5 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 KRA 111 01/02 RRX 890-915 MHz KRB 111 01/02 RTX 935-960 MHz ROF 366 142/2 TRXC KRF 101 13/01 RTX PF KRF 101 13/02 RTX PB ROF 366 141/- ROF 366 284/-...
  • Page 172 OPEN INFORMATION INSTALLATION INSTR. 6 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 2 Cabinet BDE 201 162/200, hardware positions...
  • Page 173 OPEN INFORMATION INSTALLATION INSTR. 7 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Cabinet BDE 162/–, delivery equipped On delivery, the cabinet is equipped as follows. See also figure 2. Table 3 Vertical pos Item Dummy front SDK 107 61/6 (for TRI position) Magazine TRXD BFL 119 71/3 Dummy front SDK 107 61/6 (for TRXD position)
  • Page 174 OPEN INFORMATION INSTALLATION INSTR. 8 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 RPM 513 367/1 Coaxial cable RPM 513 367/2 Coaxial cable RPM 513 368/2 Coaxial cable RPM 513 368/2 Coaxial cable RPM 513 368/4 Coaxial cable RPM 513 368/5 Coaxial cable...
  • Page 175 OPEN INFORMATION INSTALLATION INSTR. 9 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Power cable TRE 211 048/1 TRE 211 048/2 Power cable TRE 211 049 Power cable Note Cables shall be labelled at both ends. Exceptions in table 4: not labelled labelled in one end of the cable only (shelf-side)
  • Page 176 OPEN INFORMATION INSTALLATION INSTR. 10 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Connection cable RPM 513 352/1 Connection cable RPM 513 352/2 Connection cable RPM 513 390/1 Connection cable RPM 513 391/1 Connection cable RPM 513 392/1 Connection cable RPM 513 393/1...
  • Page 177 OPEN INFORMATION INSTALLATION INSTR. 11 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Coaxial cable RPM 513 429/1 Connection cable RPM 98 201/1500 Connection cable RPM 513 353/1 Connection cable RPM 513 354/1 Connection cable RPM 513 355/2 Connection cable RPM 513 355/3...
  • Page 178 OPEN INFORMATION INSTALLATION INSTR. 12 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Internal cabling diagrams Figure 3 +24V DC distribution cabling diagram (general)
  • Page 179 OPEN INFORMATION INSTALLATION INSTR. 13 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 4 -48V DC and 230V AC Power supply cabling...
  • Page 180 OPEN INFORMATION INSTALLATION INSTR. 14 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 5 Bus cabling diagram (general)
  • Page 181 OPEN INFORMATION INSTALLATION INSTR. 15 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 6 RX cabling diagram...
  • Page 182 OPEN INFORMATION INSTALLATION INSTR. 16 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 7 TX cabling diagram, F-combiner...
  • Page 183 OPEN INFORMATION INSTALLATION INSTR. 17 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 8 LIB and alarm cabling...
  • Page 184 OPEN INFORMATION INSTALLATION INSTR. 18 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Master-Extension cabinet installation Mechanical structure The material for this installation has to be ordered separately and is delivered in kits. The kits include all cables and mechanical parts needed to install a Master and Extension cabinet together.
  • Page 185 OPEN INFORMATION INSTALLATION INSTR. 19 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 To avoid damaging the cables, move the loosened ca- bles away from the cable holes which are to be opened. Opening up the cable holes There are 11 places on each side of the cabinet that can be opened up for use as cable holes.
  • Page 186 OPEN INFORMATION INSTALLATION INSTR. 20 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 P002647A Figure 9 Opening Cable Holes Note Check that no sharp edges are left in the cable holes. In such case, file smooth.. 4.4.3 Mechanical shielding Before putting the cabinets together, mount a shielding gasket around...
  • Page 187 OPEN INFORMATION INSTALLATION INSTR. 21 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 1 cm 1 cm Figure 10 Mounting shielding gasket around cable holes 4.4.4 Putting cabinets together WARNING There is a danger of the assembly toppling over, which could cause injury to personnel or damage to the equipment.
  • Page 188 OPEN INFORMATION INSTALLATION INSTR. 22 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Use the M8 screws and nuts in the cable hole that has not been opened. On the cabinet tops, install the four brackets with screws included in the extension kit.
  • Page 189 OPEN INFORMATION INSTALLATION INSTR. 23 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Extension 1 - Extension 2 NTM 201 652/01 Extension 2 - Extension 3 NTM 201 653/01 Alarm cabling For the transfer of fan and TRXC alarms from an extension cabinet to the Alarm Collection Unit ACU/TRXT in a master cabinet, a CIC board has to be mounted in every extension cabinet.
  • Page 190 OPEN INFORMATION INSTALLATION INSTR. 24 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 12 CIC board...
  • Page 191 OPEN INFORMATION INSTALLATION INSTR. 25 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 Figure 13 Connection of Master to Extension Cabinets 1, 2 & 3...
  • Page 192 OPEN INFORMATION INSTALLATION INSTR. 26 (26) Nr — No. 3/1531-COH 109 2015/11 Uen Datum — Date File 1998-03-12 1) A STRAP PLUG RNV 403 215/2 MUST BE INSTALLED IN THIS POS. LO/VG–93:0026 1996–10–30 REV. D Figure 14 Connection of Master to Extension Cabinet, left...
  • Page 193 OPEN INFORMATION INSTALLATION INSTR. 1 (16) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LRN/ZG ERAWAIN 4/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZGC (Leif-Olof Fager) 1999-10-14 External Cabling Contents Page External cabling External cables...
  • Page 194 OPEN INFORMATION INSTALLATION INSTR. 2 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure Page figure 1 Signal cabling, 1 cell configuration figure 2 Signal cabling, 3 cell configuration figure 3 External Power supply 230V AC figure 4 External Power supply -48V DC figure 5...
  • Page 195 OPEN INFORMATION INSTALLATION INSTR. 3 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 External cabling External cables Table 1 Cable type Product number LIB Bus According to RPM 513 336/500 site LIB Bus RPM 513 336/6500 specification External alarms RPM 513 338...
  • Page 196: Figure 1 Signal Cabling, 1 Cell Configuration

    OPEN INFORMATION INSTALLATION INSTR. 4 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 1 Signal cabling, 1 cell configuration...
  • Page 197 Distr. Battery Battery Transm. Radio Radio Radio Radio Radio Radio field rack rack power cabinet cabinet cabinet cabinet cabinet cabinet 75 OHM PCW J1*1 00/F*1 PCM1, -ETB 1 J1*2 00/F*2 “ , -ETB 1 J1*3 00/F*3 PCM 2, -ETB 2 J1*4 00/F*4 “...
  • Page 198: Figure 3 External Power Supply 230V Ac

    OPEN INFORMATION INSTALLATION INSTR. 6 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 3 External Power supply 230V AC...
  • Page 199: Figure 4 External Power Supply -48V Dc

    OPEN INFORMATION INSTALLATION INSTR. 7 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 4 External Power supply -48V DC...
  • Page 200: Figure 5 External Power Supply +24V Dc

    OPEN INFORMATION INSTALLATION INSTR. 8 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 5 External Power supply +24V DC...
  • Page 201: Figure 6 Alarm Cabling 230V Ac (1 Cell Site)

    OPEN INFORMATION INSTALLATION INSTR. 9 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 6 Alarm cabling 230V AC (1 cell site)
  • Page 202: Figure 7 Alarm Cabling 230V Ac (Sector Site)

    OPEN INFORMATION INSTALLATION INSTR. 10 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 7 Alarm cabling 230V AC (sector site)
  • Page 203: Figure 8 Alarm Cabling -48V Dc And +24V Dc (1 Cell Site)

    OPEN INFORMATION INSTALLATION INSTR. 11 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 8 Alarm cabling -48V DC and +24V DC (1 cell site)
  • Page 204: Figure 9 Alarm Cabling -48V Dc And +24V Dc (Sector Site)

    OPEN INFORMATION INSTALLATION INSTR. 12 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 9 Alarm cabling -48V DC and +24V DC (sector site)
  • Page 205 OPEN INFORMATION INSTALLATION INSTR. 13 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Alarm cables from fans, TRXC CIC-board CIC-board Alarm cables from CIC-board P002611A Figure 10 Alarm connections between ACU and CIC board...
  • Page 206 OPEN INFORMATION INSTALLATION INSTR. 14 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 11 External alarm number and connection of cable RPM 513 338 to Distribution Frame...
  • Page 207 OPEN INFORMATION INSTALLATION INSTR. 15 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 12 External alarm number and connection of cable RPM 513 338 to Distribution Frame...
  • Page 208 OPEN INFORMATION INSTALLATION INSTR. 16 (16) Nr — No. 4/1531-COH 109 2015/11 Uen Datum — Date File 1999-10-14 Figure 13 External alarm number and connection of cable RPM 513 338 to Distribution Frame...
  • Page 209 OPEN INFORMATION MARKING INSTRUCTIONS 1 ( 3 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/TG PIAH 102 01-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-01-30 Labelling Contents Page Labelling...
  • Page 210: Figure

    OPEN INFORMATION MARKING INSTRUCTIONS 2 ( 3 ) Nr — No. 102 01-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Labelling Before cabling a cabinet, attach remaining labels to the cables for the TRI and external cables. Identify the cable by the Product code sign, which has been mounted on the cable at the factory, (4) in figure 1.
  • Page 211 OPEN INFORMATION MARKING INSTRUCTIONS 3 ( 3 ) Nr — No. 102 01-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Figure 1 Attaching labels on a cable...
  • Page 213 OPEN INFORMATION INSTALLATION INSTR. 1 (19) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI SNOW 5/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-02 Co-siting Contents Page Co-siting panel Co-siting panel layout Co-siting panel installation RBS co-siting TACS...
  • Page 214 OPEN INFORMATION INSTALLATION INSTR. 2 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Co-siting panel Co-siting panel layout Figure 1 Co-siting panel layout...
  • Page 215 OPEN INFORMATION INSTALLATION INSTR. 3 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 P002649A Figure 2 Co-siting panel installation...
  • Page 216: Figure

    OPEN INFORMATION INSTALLATION INSTR. 4 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Co-siting panel installation DANGER High voltage (more than 200V) is used in the operation of this equip- ment. Direct contact with mains power can be fatal, and indirect contact via damp items may also be fatal.
  • Page 217 OPEN INFORMATION INSTALLATION INSTR. 5 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 RBS co-siting TACS Principle layout Figure 3 RBS 200 cabinet BDE 201 162/– co-siting TACS 883...
  • Page 218 OPEN INFORMATION INSTALLATION INSTR. 6 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 TACS 883 - Specifications Table 1 Materials according to drawing OA/RG-92:0045 on page 6 Item Unit Description Product no. Notes for Allgon combiners in TACS Combiner Cable, right...
  • Page 219 OPEN INFORMATION INSTALLATION INSTR. 7 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 4195 male angle Cable with: Connector Cable RG400/U 450mm N male angle Connector (Suhner)
  • Page 220 OPEN INFORMATION INSTALLATION INSTR. 8 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Cabling diagram Figure 4 RBS 200 cabinet BDE 201 162/– co-siting TACS 883...
  • Page 221 OPEN INFORMATION INSTALLATION INSTR. 9 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 PMU low power alarm cabling diagram Figure 5 RBS 200 cabinet BDE 201 162/– co-siting TACS 883...
  • Page 222 OPEN INFORMATION INSTALLATION INSTR. 10 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Mechanical position of TACS MCU Figure 6 TACS MCU for low power alarm...
  • Page 223 OPEN INFORMATION INSTALLATION INSTR. 11 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 RBS co-siting TACS/ETACS Principle layout Figure 7 RBS 200 cabinet BDE 201 162/– co-siting TACS/ETACS...
  • Page 224 OPEN INFORMATION INSTALLATION INSTR. 12 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 TACS 883 - Specifications Table 2 Material according to drawing OA/RG-92:0045, page 12. Item Unit Description Product no. Notes TACS 883 for Allgon combiners in TACS Combiner Cable, right...
  • Page 225 OPEN INFORMATION INSTALLATION INSTR. 13 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Co-panel, left NTM 201 632/01 Co-panel, right NTM 201 632/02 NTM–/- low power alarm (for RSA comb) including: adaptor 31N-4195-50-12/139 4195 male angle Cable with: Connector Cable...
  • Page 226 OPEN INFORMATION INSTALLATION INSTR. 14 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Cabling diagram Figure 8 RBS 200 cabinet BDE 201 162/– co-siting TACS/ETACS...
  • Page 227 OPEN INFORMATION INSTALLATION INSTR. 15 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Low power alarm cabling diagram • Refer to figure 5. Mechanical position of TACS MCU • Refer to figure 6.
  • Page 228 OPEN INFORMATION INSTALLATION INSTR. 16 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Combiner connection Cabling diagram Figure 9 RBS 200 cabinet BDE 201 162/– co-siting TACS: RSA or Allgon 1/4 combiner...
  • Page 229 OPEN INFORMATION INSTALLATION INSTR. 17 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 4.2 Combiner allocations and connections Figure 10 RBS 200 cabinet 201 162/– co-siting TACS: RSA combiners...
  • Page 230 OPEN INFORMATION INSTALLATION INSTR. 18 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 Figure 11 RBS 200 cabinet 201 162/– co-siting TACS: Allgon 1/4 combiners...
  • Page 231 OPEN INFORMATION INSTALLATION INSTR. 19 (19) Nr — No. 5/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-02 RBS co-siting TACS Cabling diagram Figure 12 RBS 200 cabinet BDE 201 162/– co-siting TACS 881...
  • Page 233 TRI Magazine BFL 119 71/1 CAPTION LIST Document No. 36/001 53-LZN 302 006 Connection of a Second TRI Date 99-09-20 Connection of RBS 200 Installation Manual...
  • Page 235 OPEN INFORMATION INSTALLATION INSTR. 1 ( 4 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI SNOW 6/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-01-30 TRI Magazine BFL 119 71/1 Contents Page TRI magazine BFL 119 71/1...
  • Page 236 OPEN INFORMATION INSTALLATION INSTR. 2 ( 4 ) Nr — No. 6/1531-COH 109 2015/11 Uen Datum — Date File 1998-01-30 TRI magazine BFL 119 71/1 The magazine contains equipment for communication between the radio equipment on site and the Base Station Controller (BSC). The TRI magazine is designed in conventional BYB mechanics with additional brackets and cover to fit the 19"...
  • Page 237 OPEN INFORMATION INSTALLATION INSTR. 3 ( 4 ) Nr — No. 6/1531-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Figure 1 The TRI magazine equipped...
  • Page 238 OPEN INFORMATION INSTALLATION INSTR. 4 ( 4 ) Nr — No. 6/1531-COH 109 2015/11 Uen Datum — Date File 1998-01-30 Figure 2 Signal cabling diagram...
  • Page 239 OPEN INFORMATION INSTALLATION INSTR. 1 (18) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/TG PIAH 1531-BFD 747 504 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-02 Connection of a Second TRI Contents Page Introduction...
  • Page 240 This document describes the installation of a second TRI (Transmission Radio Interface) in RBS 200 and RBS 205. Installation of the first TRI is described in the G-module for RBS 200 and RBS 205. One TRI can handle up to 24 TRXs (Transceivers) which corresponds to 6 cabinets.
  • Page 241: Block Diagrams

    OPEN INFORMATION INSTALLATION INSTR. 3 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Block Diagrams Cabinet Layout with Two TRIs Figure 1 Cabinet layout TRI Connections The block diagram in figure 2 shows how up to 36 TRXs can be connected to two TRIs.
  • Page 242 OPEN INFORMATION INSTALLATION INSTR. 4 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Figure 2 Block diagram 36 TRX The block diagram in figure 3 shows how up to 48 TRXs can be connected to two TRIs.
  • Page 243 OPEN INFORMATION INSTALLATION INSTR. 5 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 TRI 1 Cabinet A1 RTT1 ETB 1 RTT2 Cabinet B2 ETB 2 RTT3 Cabinet C2 ETB 3 RTT4 Cabinet A3 RTT5 Cabinet C3 RTT6 Cabinet B4 ETB4...
  • Page 244 OPEN INFORMATION INSTALLATION INSTR. 6 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Connections for TRI with LAPD Concentrators The block diagram in figure 4 shows how up to 36 TRXs can be connected to two TRIs when LAPD concentration is used. TRI 1 Cabinet A1 RTT1...
  • Page 245 OPEN INFORMATION INSTALLATION INSTR. 7 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 TRI 1 Cabinet A1 RTT1 ETB 1 RTT2 Cabinet B2 ETB 2 RTT3 Cabinet C2 RTT4 Cabinet A3 RTT5 Cabinet C3 Cabinet B4 RTT6 EMRPS TRI 2...
  • Page 246 OPEN INFORMATION INSTALLATION INSTR. 8 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Installation The TRI magazine is delivered as a basic unit BFD 747 504/11 together with a number of units according to the capacity needs. Figure 6 TRI magazine Insert delivered boards in the vacant positions according to figure 6.
  • Page 247 OPEN INFORMATION INSTALLATION INSTR. 9 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling Diagram for TRI 1 Figure 7 Cabling diagram for TRI 1...
  • Page 248 OPEN INFORMATION INSTALLATION INSTR. 10 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling Diagram for TRI 2 Figure 8 Cabling diagram for TRI 2...
  • Page 249 OPEN INFORMATION INSTALLATION INSTR. 11 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling between Cabinets Install cables between cabinets according to: Cabling diagram: LIB- BUS and PCM, figure 9 and Cable layout drawing: LIB-BUS, figure 3.3.1 Cabling for 48 TRX If the site consists of 48 TRX (16 cabinets) install PCM cables be-...
  • Page 250 OPEN INFORMATION INSTALLATION INSTR. 12 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling Diagram: LIB-BUS and PCM Figure 9 Cabling diagram: LIB-bus and PCM...
  • Page 251 OPEN INFORMATION INSTALLATION INSTR. 13 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cable Layout Drawing: LIB-BUS Figure 10 Cable layout drawing: LIB-bus...
  • Page 252 OPEN INFORMATION INSTALLATION INSTR. 14 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Installation of TRI with LAPD Concentration The TRI magazine is delivered as a basic unit BFD 747 504/11 together with a number of units according to the capacity needs. EMRPS, ETB or RTT P001579 Figure 11...
  • Page 253 OPEN INFORMATION INSTALLATION INSTR. 15 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling Diagram for TRI 1 with LAPD Concentration Figure 12 Cabling diagram for TRI 1 with LAPD concentration...
  • Page 254 OPEN INFORMATION INSTALLATION INSTR. 16 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling Diagram for TRI 2 with LAPD Concentration P001583 Figure 13 Cabling diagram for TRI 2 with LAPD concentration...
  • Page 255 OPEN INFORMATION INSTALLATION INSTR. 17 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling between Cabinets Install cables between cabinets according to: Cabling diagram: LIB-BUS and PCM with LAPD concentration, figure 14. 4.3.1 Transmission line connection Install supplied PCM cable connector holders (SXA 120 165 for RPM 513 339, or SXA 120 164 for RPM 513 349) in Distribution Frame (DF).
  • Page 256 OPEN INFORMATION INSTALLATION INSTR. 18 (18) Nr — No. 1531-BFD 747 504 Uen Datum — Date File 1998-02-02 Cabling Diagram: LIB-BUS and PCM with LAPD Concentration 00/B*3 1) ALT. CONNECTION FOR 36 TRXs. P001571 Figure 14 Cabling diagram: LIB-bus and PCM with LAPD concentration...
  • Page 257 OPEN INFORMATION INSTALLATION INSTR. 1 (29) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/TG KABS 7/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-03 Installation Strapping Instructions Contents Page Installation Strapping Instructions Miniature DIP switches...
  • Page 258 1998-02-03 Installation Strapping Instructions It is important that all units included in the RBS 200 are strapped cor- rectly before the power to the cabinet is turned on. All units should be strapped during the installation phase. It is recommended to carry out the strapping in the sequence described in this document.
  • Page 259 OPEN INFORMATION INSTALLATION INSTR. 3 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Figure 2 The U-link Strapping Plugs Three different kinds of strapping plugs are used when strapping the RBS. • Address plug (RNV 991 03/n) •...
  • Page 260 OPEN INFORMATION INSTALLATION INSTR. 4 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.4.1 Opening the Strapping Plug 1. Slide off the top cover in either direction, depending on how it was mounted in place. 2.
  • Page 261 OPEN INFORMATION INSTALLATION INSTR. 5 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.4.2 Checking the Wiring Figure 4 Strapping plug pin configuration Hold fork contact unit with notch turned towards you (see arrow in figure 4. Turn the fork contact unit until you see the wiring and notch is pointing downwards.
  • Page 262 OPEN INFORMATION INSTALLATION INSTR. 6 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Logical Logical Product Product Circuit diagram Circuit diagram address address 991 03/1 991 03/5 991 03/2 991 03/6 991 03/3 991 03/7 991 03/4 991 03/8 Figure 5...
  • Page 263 OPEN INFORMATION INSTALLATION INSTR. 7 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Logical Logical Product Product Circuit diagram Circuit diagram address address 991 03/9 991 03/13 991 03/14 991 03/10 991 03/15 991 03/11 991 03/16 991 03/12 Figure 6...
  • Page 264 OPEN INFORMATION INSTALLATION INSTR. 8 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Logical Logical Product Product Circuit diagram Circuit diagram address address 991 03/17 991 03/21 991 03/22 991 03/18 991 03/23 991 03/19 991 03/24 991 03/20 Figure 7...
  • Page 265 OPEN INFORMATION INSTALLATION INSTR. 9 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Product Circuit diagram Logical Product Circuit diagram Logical address address 991 03/25 991 03/29 991 03/26 991 03/30 991 03/27 991 03/31 99 1 03/28 991 03/32 Figure 8...
  • Page 266 OPEN INFORMATION INSTALLATION INSTR. 10 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Reset and Supervision Plug RNV 991 712/001 The Reset and Supervision plug (see figure 9) includes an LED that indicates the status of the supervised unit. It also has a 2-stage reset button that makes it possible to reset the unit.
  • Page 267 OPEN INFORMATION INSTALLATION INSTR. 11 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 0±15 Number of transmitted TS 0±31 Figure 10 RTT board DIP switch configuration. If no market requirements exist (see Market Dependent Special Instruction), set the switches according to figure 11.
  • Page 268 OPEN INFORMATION INSTALLATION INSTR. 12 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Connect outer conductor of Pair cable to GND in receive direction (Yes/No) Connect outer conductor of Pair cable to GND in transmitt direction (Yes/No) Connect the screen of the Coaxial cable to GND in receive condition...
  • Page 269 OPEN INFORMATION INSTALLATION INSTR. 13 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 120Ω 75Ω P001759 Figure 14 Position of 75 coaxial cable (B:4) and 120 pair cable (B:3) respectively on the ETB board. Strapping the EMPC, ROF 131995/2 The Extension Module regional Processor Card (EMPC) is to be pro- vided with front connected strapping plugs for the following functions: •...
  • Page 270 OPEN INFORMATION INSTALLATION INSTR. 14 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 STRP1 STRP0 EMPC ETBC0 ETBC1 Red LED and Reset Button Figure 15 Strapping EMPC without EMRPS board: EMRPB-A, TSR 204 0201/500 Address strap, RNV 991 03/n, n=1-32 Reset and Supervision strap, RNV 991 712/001 EMRPB bus terminator, RNV 991 223/004 EMRPB-B, TSR 204 0201/500, optional...
  • Page 271 OPEN INFORMATION INSTALLATION INSTR. 15 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Decimal Product Circuit diagram address 991 03/1 Figure 16 Strapping plug RNV 991 03/1 without EMRPS board. 1.10.2 Reset and supervision A strapping plug, RNV 991712/001, is used for LED indication on working status and reset of the EMPC.
  • Page 272 OPEN INFORMATION INSTALLATION INSTR. 16 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 STRP1 ETBC0 STRP0 EMPC ETBC1 RTT/ETB Red LED and Reset Button EMRPS Figure 17 Strapping EMPC with EMRPS board: EMRPB-A, TSR 204 0201/500 Address strap, RNV 991 03/n, n=1-32 Reset and Supervision strap, RNV 991 712/001 Address strap, RNV 991 03/n, n=9-24...
  • Page 273 OPEN INFORMATION INSTALLATION INSTR. 17 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 Recommended value on strapping plug RNV 991 03/1 (n=1) is n=9, which corresponds to EM=8. Decimal Product Circuit diagram address 991 03/9 Figure 18 Strapping plug RNV 991 03/9 when using LAPD.
  • Page 274 OPEN INFORMATION INSTALLATION INSTR. 18 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.14 Strapping of TRXD magazine, BFL 119 71/3 The TRXD (Transceiver Digital) magazine is provided with two sepa- rate backplanes, one per TRXD position. Each backplane is equipped with an 8-position DIP switch located as shown in figure 19.
  • Page 275 OPEN INFORMATION INSTALLATION INSTR. 19 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.14.2 Strapping the Transceiver Group (TG) number The Transceiver Group number points out a specific TG, which is de- fined as the set of equipment associated with radio transmission on one common transmitter antenna.
  • Page 276 OPEN INFORMATION INSTALLATION INSTR. 20 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.15.2 Extension Cabinet 1 TRXC in position CA 04/09 TRXC in position CA 04/51 TEI value 4, TG no. not used, TEI value 5, TG no. not used, no PCM no PCM TRXC in position CA 06/09...
  • Page 277 OPEN INFORMATION INSTALLATION INSTR. 21 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.15.4 Extension Cabinet 3 TRXC in position CA 04/09 TRXC in position CA 04/51 TEI value 12, TG no. not used, TEI value 13, TG no. not used, no PCM no PCM TRXC in position CA 06/09...
  • Page 278 OPEN INFORMATION INSTALLATION INSTR. 22 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1. Power input 2. Bar code label 3. Reset button 4. Error LED (red) 5. Status LED (yellow) 6. On LED (green) 7.
  • Page 279 OPEN INFORMATION INSTALLATION INSTR. 23 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 MOA value 0±15 Spare P001836 Figure 25 DIP-switch, TXCU-board When frequency hopping is not used, there is a one-to-one corre- spondence between TRXC and RTX. To reflect this relation the MOA value of the RTXs within each transceiver group shall be set according to figure 26 and figure 27.
  • Page 280 OPEN INFORMATION INSTALLATION INSTR. 24 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.17.1 Master Cabinet RTX in position CA 10/01 RTX in position CA 10/13 MOA value=0 MOA value=1 RTX in position CA 10/25 RTX in position CA10/37 MOA value=2 MOA value=3...
  • Page 281 OPEN INFORMATION INSTALLATION INSTR. 25 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.17.3 Extension Cabinet 2 RTX in position CA 10/01 RTX in position CA 10/13 MOA value=8 MOA value=9 RTX in position CA 10/25 RTX in position CA 10/37 MOA value=10 MOA value=11...
  • Page 282 File 1998-02-03 ACCU ACCB ACCU=Alarm Collection Control Unit ACCB=Alarm Collection Connection Board RBS 200 Figure 30 Switch and U-link locations on the ACU. 1.18.1 DIP switch S4 The Voltage Standing Wave Ratio (VSWR) alarm threshold, type of control mode, VSWR alarm output polarity and number of fan cas- settes to be supervised is strapped with this DIP switch.
  • Page 283 OPEN INFORMATION INSTALLATION INSTR. 27 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 VSWR1 alarm threshold 2.0 Not used 2.0 Stand Alone mode Normal polarity P001176 Figure 31 DIP switch S4 configuration on ACU. 1.18.2 Strapping of VSWR Alarm Threshold There are eight different VSWR alarm threshold values to select be- tween.
  • Page 284 OPEN INFORMATION INSTALLATION INSTR. 28 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 VSWR1 alarm threshold=1.5 VSWR1 alarm threshold=1.6 VSWR1 alarm threshold=1.7 VSWR1 alarm threshold=1.8 VSWR1 alarm threshold=2.0 VSWR1 alarm threshold=2.2 VSWR1 alarm threshold=2.8 VSWR1 alarm threshold=2.5 Figure 32 Strapping the VSWR alarm threshold.
  • Page 285 OPEN INFORMATION INSTALLATION INSTR. 29 (29) Nr — No. 7/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-03 1.18.4 Strapping VSWR Alarm Output Polarity Normal or reverse polarity can be used. Select according to figure 34. Reverse polarity Normal polarity Figure 34 Strapping the VSWR alarm output polarity.
  • Page 287 Dokumentnr — Document no SG/ERA/LZ/LI ERASNOW 1998-02-10 8/1531-COH 109 2015/11 Uen Godka ¨ nd — Approved Kontr — Checked Tillho ¨ r/referens — File/reference ERA/LZ/TGC (ERABVN) RBS 200-TRXT Installation Contents Page General information Uplink Downlink Installation of TRXT General Material Installation Instructions SEIF v1.0,...
  • Page 288: General Information

    OPEN INFORMATION INSTALLATION INSTR. 2 ( 6 ) Datum — Date Dokumentnr — Document no 1998-02-10 8/1531-COH 109 2015/11 Uen General information The transceiver Tester, TRXT, is an optional piece of equipment that can be installed in 900 MHz systems, including those already in operation.
  • Page 289 OPEN INFORMATION INSTALLATION INSTR. 3 ( 6 ) Datum — Date Dokumentnr — Document no 1998-02-10 8/1531-COH 109 2015/11 Uen Table 2 Material in mounting kit NTM 201 875/n Product number Designation Fuse NGH 257 01/100 SVH 281 60/1 Label SXA 120 1827/1 Dummy front 80/SBA 331 030/1006...
  • Page 290 OPEN INFORMATION INSTALLATION INSTR. 4 ( 6 ) Datum — Date Dokumentnr — Document no 1998-02-10 8/1531-COH 109 2015/11 Uen short-circuiting the RTX PF unit . Mount Dummy front (SXA 120 1827/1) on the left side of the TRXT units. Follow the cabling diagram enclosed in this instruction (see figure 2).
  • Page 291 OPEN INFORMATION INSTALLATION INSTR. 5 ( 6 ) Datum — Date Dokumentnr — Document no 1998-02-10 8/1531-COH 109 2015/11 Uen P002223 Figure 1 Mounting of units...
  • Page 292 OPEN INFORMATION INSTALLATION INSTR. 6 ( 6 ) Datum — Date Dokumentnr — Document no 1998-02-10 8/1531-COH 109 2015/11 Uen RXD/ TM/PSU CONN. TRXD TRXD COMB shelf field unit shelf slot shelf unit shelf slot unit shelf unit shelf V-POS. J*24 RPM 513 351/1 51A*Pow In...
  • Page 293 9/1531-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/VGC (ERABVN) 1998-02-10 RBS 200 Installation Instructions Abstract Up-grade to replace Filter Combiner with Hybrid Combiner and MCU-TXBP panel replacement. Contents Page INTRODUCTION Applicable Cabinets...
  • Page 294 The up-grade may be completed with access only to the front of the RBS 200 cabinet assembly. It entails the replacement of the Filter/ Combiner magazine and the cabinet MCU-TXBP assembly. The replacement magazine will have a different Combiner system.
  • Page 295 OPEN INFORMATION INSTALLATION INSTR. 3 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 Use of the anti-static wrist strap is recommended. Refer to sub-section 2.2 of this document headed EQUIPMENT SAFETY .
  • Page 296 OPEN INFORMATION INSTALLATION INSTR. 4 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 SAFETY Installers and service personnel must always be aware of safety when working on any equipment. Personal Safety WARNING Be sure power is NOT connected to the units during assembly work as any contact with electricity may be fatal.
  • Page 297: Reference Information

    (RUs) and taking the cabinet out of service (Halting the cell) prior to work are all detailed in this section of this instruction. RBS 200 Magazine Locations The figure 2 shows the cabinet mounted magazine locations and the numbering system used within the cabinet. Labels should be fitted to the right hand side of the cabinet interior bearing these numbers be- side the magazine.
  • Page 298 To withdraw an RU, observe the correct procedure of the two types of RU that are fitted to the RBS 200 magazines:...
  • Page 299 OPEN INFORMATION INSTALLATION INSTR. 7 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 3.2.1 Units Fitted With A Key Slot Remove the retaining screws then insert the supplied removal key into the keyhole situated on the front of the unit. Rotate the key by and carefully draw the unit forward.
  • Page 300 Tools The following tools are recommended for assembly and maintenance work on the RBS 200 series of equipment: • Tool Case, LTT 601 045/1. • Wrist strap (Anti-static), LYB 250 01/14.
  • Page 301 All necessary installation tools and materials. • A new " Data Transcript " must be available for use. • RBS 200 " Commissioning Manual " (module H). • Permission to HALT the cell from the BSC during the work. Assembly Order The following checklist, table 4, is a guide to the routines to follow prior to assembly of the RBS 200 cabinet.
  • Page 302 Cable Removal Carefully disconnect the coaxial cables associated with magazines 02 and 04 , ensuring that each cable is cor- rectly labelled as per the RBS 200 manual documentation. Should any cable appear to be unidentified, add a label bearing the unit and connector position numbers: <magazine>...
  • Page 303 OPEN INFORMATION INSTALLATION INSTR. 11 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 Reconnect the RF coaxial cables to the new MCU-TXBP connectors having same physical locations as the old MCU-TXBP. Table 5 CABLE Old MCU-TXBP Label New MCU-TXBP Label 1 (B) PRTT -40...
  • Page 304 Fan-trays may be replaced and fuse 23 re-fitted. Restore magazines 04 and 06 back into their original positions in the RBS 200 cabinet taking care not to trap or damage any cables between the cabinet and the magazine chassis. The replacement order is the reverse of the removal order detailed in section 5.2.
  • Page 305 OPEN INFORMATION INSTALLATION INSTR. 13 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 Check that all cables, connectors and retaining screws have been restored to their original condition. MCU-TXBP Precautions The MCU-TXBP replacement requires access to parts of the cabinet not normally accessible to service personnel.
  • Page 306 Cable Removal Carefully disconnect the coaxial cables ensuring that each cable is correctly labelled as per the RBS 200 manual documentation. Should any cable appear to be lacking an identity label then add a suitable label bearing the unit and connector position numbers: <magazine>...
  • Page 307 OPEN INFORMATION INSTALLATION INSTR. 15 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 Cable Installation Reconnect the coaxial cables to the same connectors from which they were originally removed. All cables should have been identified and labelled to assist the re-installation before the modification commenced.
  • Page 308 OPEN INFORMATION INSTALLATION INSTR. 16 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 RPM 513 368/6 RPM 513 368/2 RPM 513 368/6 RPM 513 368/2 View showing additional cable installation. P002769A Figure 5 Note • There should be one cable remaining without termina- tion, this cable should be labelled "MCU-TXD"...
  • Page 309 OPEN INFORMATION INSTALLATION INSTR. 17 (17) Nr — No. 9/1531-COH 109 2015/11 Uen Datum — Date File 1998-02-10 COMMISSIONING Ensure that the cabinet is powered-up and that the cell operating pa- rameters from the BSC have been updated. Refer to the RBS "...
  • Page 311: Power Supply 230V Ac

    Power Supply 230V AC CAPTION LIST Document No. 4/001 53-LZN 302 006 Power Supply -48V DC Date 99-09-20 Power Supply +24V DC Power Supply Installation and Commissioning RBS 200 Installation Manual...
  • Page 313: Installation

    General CAPTION LIST Document No. 40/001 53-LZN 302 006 Installation Date 99-09-20 Battery Stand Power Supply 230V AC Commissioning RBS 200 Installation Manual...
  • Page 315 OPEN INFORMATION DESCRIPTION 1 (14) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI GUG 1/1550-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-01-30 Power Supply 230V AC, General Contents Page Introduction...
  • Page 316 OPEN INFORMATION DESCRIPTION 2 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Introduction DANGER High voltage (more than 200V) is used in the operation of this equip- ment. Direct contact with mains power can be fatal, and indirect contact via damp items may also be fatal.
  • Page 317 OPEN INFORMATION DESCRIPTION 3 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Battery stand Master cabinet Extension cabinet Figure 1 Example of system BZZ 207 01...
  • Page 318 OPEN INFORMATION DESCRIPTION 4 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Function During normal operation, the system maintains a constant DC voltage across the batteries and the telecommunication equipment. In case of mains or rectifier failure, the telecommunication equipment will be powered from the batteries.
  • Page 319 OPEN INFORMATION DESCRIPTION 5 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 • Regulation of system voltage. 2.1.3 To PCU from rectifier • Output voltage. • Output current. • Temperature. • Alarm: − Rectifier failure (also fuse failure). −...
  • Page 320 OPEN INFORMATION DESCRIPTION 6 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Included units The positions of the different units in the cabinets are shown in Wiring diagram 1/1073-BZZ 207 01 Ux. Rectifier BML 435 002/- Error Communication Figure 3...
  • Page 321 OPEN INFORMATION DESCRIPTION 7 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Battery and Interconnection Module BMG 701 013/- CAUTION Read Safety instructions regarding handling of batteries. The Battery and Interconnection Module, BIM, is designed to protect the battery connection and the interconnection of various cabinets in the system via fuses.
  • Page 322 OPEN INFORMATION DESCRIPTION 8 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 operate, reconnecting the batteries.When the contactors are connected, voltage rises to normal system voltage, +27V DC. If the control unit fails, the batteries are automatically reconnected when the system voltage exceeds +25.5 V DC after approx.
  • Page 323 OPEN INFORMATION DESCRIPTION 9 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Internal Distribution Module BMG 663 002/- Fan Alarm +24V Current Load Max. 60A Figure 6 Internal Distribution Module BMG 663 002/- The distribution unit comprises 21x10A, 2x16A and 1x1A glass-tube fuses and capacitors to filter the +24V DC voltage.
  • Page 324 OPEN INFORMATION DESCRIPTION 10 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 converters. The outlets will be disconnected if the voltage drops to +19.6V, ±0.2V DC to avoid discharging the batteries too much, and are connected again when the system voltage has risen to +24.2V The LED shines when the circuit breakers are in position "On".
  • Page 325 OPEN INFORMATION DESCRIPTION 11 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 The converter comes in a number of different versions, depending on the input and output voltage, and on the desired output power. Each DC/DC board, ROA 137 0628/- has an output power of approximately 36 W.
  • Page 326 OPEN INFORMATION DESCRIPTION 12 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 connected according to paragraph Handling and operation in sub-section 4.0.3. The alarm condition is indicated by three LEDs: a green (On) which indicates that the control unit working normally, a yellow (Stat) which indicates observation alarm and a red (Err) which indicates an error condition.
  • Page 327 OPEN INFORMATION DESCRIPTION 13 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Handling of Power Control Unit ROA 807 The left-hand toggle switch is used to select what will be shown on the display. With the toggle switch in the upper position (V) the system voltage is shown, in mid-position (C), the total current con- sumption of the system is shown, and in its bottom position (Set V) the desired voltage value of the system is shown.
  • Page 328 OPEN INFORMATION DESCRIPTION 14 (14) Nr — No. 1/1550-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Figure 12 Blocking outgoing alarms After installation or after a break in the communication loop, the con- trol unit may "lock up". This is remedied by short circuiting the Reset output, after which the control unit restarts.
  • Page 329: Reference Page

    OPEN INFORMATION OTHER LZN-ASSOC. DOC. 1 ( 2 ) Uppgjord — Prepared Datum — Date Dokumentnr — Document no SG/ERA/LZ/LI ERASNOW 72709 1998-01-30 2/001 59-LZN 302 006 Uen Godka ¨ nd — Approved Kontr — Checked Tillho ¨ r/referens — File/reference ERA/LZ/TGC (ERABVN) Reference Page Contents...
  • Page 330 OPEN INFORMATION OTHER LZN-ASSOC. DOC. 2 ( 2 ) Datum — Date Dokumentnr — Document no 1998-01-30 2/001 59-LZN 302 006 Uen Power Supply Installation and Commissioning Power Supply 230V AC, General Appendices section has been removed from the manual as follows: 1.1.1 Wiring Diagram 1/1073-BZZ 207 01 Ux This document is not written in SGML format and is therefore not in-...
  • Page 331 OPEN INFORMATION INSTALLATION INSTR. 1 ( 6 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI SNOW 1/1531-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-10 Power Supply 230V AC, Installation Contents Page Installation...
  • Page 332 OPEN INFORMATION INSTALLATION INSTR. 2 ( 6 ) Nr — No. 1/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-10 Installation DANGER High voltage (more than 200V) is used in the operation of this equip- ment. Direct contact with mains power can be fatal, and indirect contact via damp items may also be fatal.
  • Page 333 OPEN INFORMATION INSTALLATION INSTR. 3 ( 6 ) Nr — No. 1/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-10 860 1685 Earth screw The front shelf-bracket can be mounted in two ways, de- pending on battery supplier: If the battery is made by ºChlorideº, fit the front shelf±bracket as illustrated by the two top shelves.
  • Page 334 OPEN INFORMATION INSTALLATION INSTR. 4 ( 6 ) Nr — No. 1/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-10 WARNING When drilling, the drill may come into contact with live wires. It is prohibited to drill holes in the Base Station The RBS cabinet is delivered with distribution unit and all internal wiring installed.
  • Page 335 OPEN INFORMATION INSTALLATION INSTR. 5 ( 6 ) Nr — No. 1/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-10 Note Support relief bars SXA 113 2837/2, packed with the stand, shall be placed under the feet of the battery stand.
  • Page 336 OPEN INFORMATION INSTALLATION INSTR. 6 ( 6 ) Nr — No. 1/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-10 SXA 113 2760 BFL 107 101/– + – BMG 701 013/– – Figure 2 Fix the protective cover, which covers the whole front of the magazine.
  • Page 337 OPEN INFORMATION INSTALLATION INSTR. 1 ( 8 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI SNOW 2/1531-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-02 Power Supply 230V AC, Battery Stand Contents Page Battery stand...
  • Page 338 OPEN INFORMATION INSTALLATION INSTR. 2 ( 8 ) Nr — No. 2/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-02 Battery stand There are three versions available, see table 1: Table 1 Version Width Depth Between shelves BKY 261 003 350 mm 375 mm 150 mm...
  • Page 339: Battery Backup

    OPEN INFORMATION INSTALLATION INSTR. 3 ( 8 ) Nr — No. 2/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-02 Battery back-up Table 2 Item Product no. Description Omni site, Sector site, Sector site, 1 cabinet 3 cabinets 6 cabinets 29 Ah back-up: BKY 261 003 Battery stand...
  • Page 340 OPEN INFORMATION INSTALLATION INSTR. 4 ( 8 ) Nr — No. 2/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-02 Battery stand installation For installation of BIM and batteries, see section 4.0.1.
  • Page 341 OPEN INFORMATION INSTALLATION INSTR. 5 ( 8 ) Nr — No. 2/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-02 Connection of batteries and cell block voltage regulators • 29 Ah back-up, see figure 3. • 134 Ah back-up, 6.75V/cell block, see figure 3. •...
  • Page 342 OPEN INFORMATION INSTALLATION INSTR. 6 ( 8 ) Nr — No. 2/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-02 Figure 1 Battery back up stand 3 x 29 Ah, including BIM...
  • Page 343 OPEN INFORMATION INSTALLATION INSTR. 7 ( 8 ) Nr — No. 2/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-02 Figure 2 Battery Back-up Stand BKY 261 002/650 3 x 134 Ah or BKY 261 002/950 3 x 187 Ah, including BIM...
  • Page 344 OPEN INFORMATION INSTALLATION INSTR. 8 ( 8 ) Nr — No. 2/1531-COH 109 2015/1 Uen Datum — Date File 1998-02-02 OARD–91:1057 1995–03–01 Rev. B Figure 3 134 Ah Battery Back-up: Connection of Batteries and 6.75V/cell Block Voltage Regulators OARD–91:1056 1995–03–01 Rev.
  • Page 345 OPEN INFORMATION START OF OP INSTR 1 (10) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI GUG 1/1537-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-01-30 Power Supply 230V AC, Commissioning Contents Page Test...
  • Page 346 OPEN INFORMATION START OF OP INSTR 2 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Test Test Equipment A voltmeter class 0.5 with measuring ranges 250V AC, 100 mV and 30V DC. Preparations DANGER High voltage (more than 200V) is used in the operation of this equip- ment.
  • Page 347 OPEN INFORMATION START OF OP INSTR 3 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Check that the correct number of cells are installed. Check that cells are properly positioned, and that inter- cell connectors conform to Wiring diagram 1/1073-BZZ 207 01 Ux, page 1 or 2 in the Appendices of section 4.0.0, and that they are tightened according to the instructions of the battery supplier.
  • Page 348 OPEN INFORMATION START OF OP INSTR 4 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 1.3.1.1 Table 1 Action Result Start all rectifiers by setting the toggle LEDs "On" and "Communication" light switches to the "On" position. up on the rectifiers.The PCU display shows 24V ±0.5V.
  • Page 349 OPEN INFORMATION START OF OP INSTR 5 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Table 3 Battery voltage levels Battery voltage (V) V/cell V/block Operational mode at T<25 Floating charge: 2 V cells 1) Without cell voltage 27.25V 2.27 equalizers.
  • Page 350 OPEN INFORMATION START OF OP INSTR 6 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 1.3.2.4 Table 7 Action Result Press the key blocking the outgoing alarm. The yellow LED "Stat" on the PCU lights. O1 See Figure 11 in sub-section 4.0.0.
  • Page 351 OPEN INFORMATION START OF OP INSTR 7 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 1.5.1.1 Table 8 Action Result Read the system voltage on the PCU display. The value shall correspond to the float If it must be changed, refer to para.
  • Page 352 OPEN INFORMATION START OF OP INSTR 8 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 1.5.2 Checking cell voltages Measure the cell voltage/block voltage across each battery cell/battery block. Leave a new battery with normal operating voltage for a minimum of 7 days, if it does not comply with the voltage values stated below.
  • Page 353 OPEN INFORMATION START OF OP INSTR 9 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 If a unit is to be sent to a repair centre for repair, Failure report LZT 109 278 shall be filled in and sent with the unit.
  • Page 354: Handling And Operation

    OPEN INFORMATION START OF OP INSTR 10 (10) Nr — No. 1/1537-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Handling and operation Alarm categories Outgoing alarms from the PCU are made via 5 relays with categories according to the list below. Refer also to figure 1. PCU and TRI com- municate through connecting cable TSR 901 0197/1700.
  • Page 355: Installation

    General CAPTION LIST Document No. 41/001 53-LZN 302 006 Installation Date 99-09-20 Commissioning Power Supply -48V DC RBS 200 Installation Manual...
  • Page 357 OPEN INFORMATION DESCRIPTION 1 ( 7 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI SNOW 2/1550-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-06 Power Supply -48V DC, General Contents Page Introduction...
  • Page 358 OPEN INFORMATION DESCRIPTION 2 ( 7 ) Nr — No. 2/1550-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Introduction Power supply system BZZ 207 10, see figure 1, is designed to power RBS (Radio Base Station) cabinets in a GSM (Global System Mobile) system.
  • Page 359 OPEN INFORMATION DESCRIPTION 3 ( 7 ) Nr — No. 2/1550-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Function The system converts incoming -48/-60V DC to +24V DC and main- tains a constant DC voltage across the telecommunication equipment. An 0.6 F capacitor on the secondary side protects against transients.
  • Page 360 OPEN INFORMATION DESCRIPTION 4 ( 7 ) Nr — No. 2/1550-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Included units DC/DC converter BMR 960 009/1 A B C B–Level TP–B/10 A–Level Output TP–A/10 +27 DC max 48 A A B C TP–...
  • Page 361 OPEN INFORMATION DESCRIPTION 5 ( 7 ) Nr — No. 2/1550-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Alarms from the converter are sent over relay contacts as shown in figure 4. Relays are normally energised and de-energised in event of an alarm.
  • Page 362 OPEN INFORMATION DESCRIPTION 6 ( 7 ) Nr — No. 2/1550-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Figure 5 Dashed line shows position of capacitor unit Distribution unit BMG 663 002/- Fan Alarm +24V Current Load Max. 60A Figure 6 Internal Distribution Module BMG 663 002/- The distribution unit comprises 21x10A, 2x16A and 1x1A glass-tube...
  • Page 363 OPEN INFORMATION DESCRIPTION 7 ( 7 ) Nr — No. 2/1550-COH 109 2015/1 Uen Datum — Date File 1998-02-06 To make the system "high-ohmic", the distribution cables have a standard length of 3 m and a standard area of 0.80 mm In this way, the internal impedance of the cable becomes about six times higher than the internal impedance of the power supply plant.
  • Page 365 OPEN INFORMATION OTHER LZN-ASSOC. DOC. 1 ( 2 ) Uppgjord — Prepared Datum — Date Dokumentnr — Document no SG/ERA/LZ/LI ERASNOW 72709 1998-02-02 3/001 59-LZN 302 006 Uen Godka ¨ nd — Approved Kontr — Checked Tillho ¨ r/referens — File/reference ERA/LZ/TGC (ERABVN) Reference Page Contents...
  • Page 366 OPEN INFORMATION OTHER LZN-ASSOC. DOC. 2 ( 2 ) Datum — Date Dokumentnr — Document no 1998-02-02 3/001 59-LZN 302 006 Uen Power Supply Installation and Commissioning Power Supply -48V DC, General The Appendix has been removed from the manual as follows: 1.1.1 Wiring Diagram 1073-BZZ 207 10 Ux This document is not written in SGML format and is therefore not in-...
  • Page 367 OPEN INFORMATION INSTALLATION INSTR 1 ( 3 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI LUGG 3/1531-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1997-11-18 Power supply -48V DC Contents Page Installation...
  • Page 368: Installation

    OPEN INFORMATION INSTALLATION INSTR 2 ( 3 ) Nr — No. 3/1531-COH 109 2015/1 Uen Datum — Date File 1997-11-18 Installation The RBS cabinet is delivered completely equipped with capacitor and distribution unit and all internal wiring. Fitting DC/DC converters Push the DC/DC converters, which are delivered sepa- rately, into their positions in the bottom right-hand part of the cabinet.
  • Page 369 OPEN INFORMATION INSTALLATION INSTR 3 ( 3 ) Nr — No. 3/1531-COH 109 2015/1 Uen Datum — Date File 1997-11-18 Recommended connecting cable: min. 2x10 mm ; two per DC/DC converter. Recommended fuse: 40A per DC/DC converter.
  • Page 371 OPEN INFORMATION START OF OP INSTR 1 ( 4 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI 2/1537-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1997-11-18 Commissioning Contents Page Test...
  • Page 372 OPEN INFORMATION START OF OP INSTR 2 ( 4 ) Nr — No. 2/1537-COH 109 2015/1 Uen Datum — Date File 1997-11-18 Test Test Equipment • Voltmeter class 0.5 with measuring ranges 100 mV and 100V DC. • Clip-on ammeter with measuring range 50A DC. Preparations Make a visual inspection of the power plant together with the person responsible for the installation of the...
  • Page 373 OPEN INFORMATION START OF OP INSTR 3 ( 4 ) Nr — No. 2/1537-COH 109 2015/1 Uen Datum — Date File 1997-11-18 1.3.1.1 Table 1 Action Result Start both converters of a cabinet by connecting LEDs Input OK and Output OK on the DC/DC the feeder fuses.
  • Page 374 OPEN INFORMATION START OF OP INSTR 4 ( 4 ) Nr — No. 2/1537-COH 109 2015/1 Uen Datum — Date File 1997-11-18 Pinout for test and alarm connectors Voltage level B/10 test out B02 - B04 Voltage level A/10 test out B06 - B08 Input voltage level test out B10 - B12...
  • Page 375 OPEN INFORMATION INSTALLATION INSTR. 1 ( 3 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI SNOW 4/1531-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-01-30 Power Supply +24V DC, Installation Contents Page Installation...
  • Page 376 OPEN INFORMATION INSTALLATION INSTR. 2 ( 3 ) Nr — No. 4/1531-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Installation CAUTION Read Safety instructions regarding handling of batteries. CAUTION Verify that the cable marking is correct before connecting the cables. Note The AC installation must be carried out by an authorised electrician.
  • Page 377 OPEN INFORMATION INSTALLATION INSTR. 3 ( 3 ) Nr — No. 4/1531-COH 109 2015/1 Uen Datum — Date File 1998-01-30 Connection points when +24V DC power supply is used Figure 1 Connection points for +24V DC on top of cabinet...
  • Page 379: Material Specification

    Material Specification CAPTION LIST Document No. 5/001 53-LZN 302 006 Lifting of Cabinet Date 99-09-20 Installation of LNA Equipment Supplementary Information RBS 200 Installation Manual...
  • Page 381 OPEN INFORMATION MATERIAL SPEC. 1 ( 6 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LRN/ZG ERAWAIN 105 49-COH 109 2015/11 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZGC (Leif-Olof Fager) 1999-10-06 Material Specification Contents Page...
  • Page 382 OPEN INFORMATION MATERIAL SPEC. 2 ( 6 ) Nr — No. 105 49-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Material Specification Battery Back-Up 1.1.1 Battery Back-Up - 29 Ah Table 1 Battery back-up - 29 Ah Item Product No. Description Omni site Sector site 1 cabinet...
  • Page 383 OPEN INFORMATION MATERIAL SPEC. 3 ( 6 ) Nr — No. 105 49-COH 109 2015/11 Uen Datum — Date File 1999-10-06 1.1.2 Battery Back-Up - 134 Ah Table 2 Battery back-up - 134 Ah Item Product No. Description Omni Sector site site 3 cab.
  • Page 384 OPEN INFORMATION MATERIAL SPEC. 4 ( 6 ) Nr — No. 105 49-COH 109 2015/11 Uen Datum — Date File 1999-10-06 1.1.3 Battery Back-Up - 187 Ah Table 3 Battery back-up - 187 Ah Item Product No. Description Omni site Sector site 1 cabinet 3 cab.
  • Page 385 OPEN INFORMATION MATERIAL SPEC. 5 ( 6 ) Nr — No. 105 49-COH 109 2015/11 Uen Datum — Date File 1999-10-06 According to power requirements Supplementary Equipment 1.2.1 Basic Equipment (Always to Be Delivered): Table 5 Basic equipment NTM 201 245/3 Suppl.
  • Page 386 OPEN INFORMATION MATERIAL SPEC. 6 ( 6 ) Nr — No. 105 49-COH 109 2015/11 Uen Datum — Date File 1999-10-06 Table 8 External PCM cabling Item Product No. Description for 75 ohm coaxial cabling: RPM 513 339 Coax. cable, 75 ohm for one ETB board 2 (12) if more than three ETB boards: SXK 107 2435/1...
  • Page 387 OPEN INFORMATION TRANSPORT PLANNING 1 ( 5 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/TG PIAH 1204-COH 109 2015/1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-06 Lifting of Cabinet Contents Page Lifting the RBS Cabinet...
  • Page 388 OPEN INFORMATION TRANSPORT PLANNING 2 ( 5 ) Nr — No. 1204-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Lifting the RBS Cabinet WARNING Read Safety chapter regarding handling of heavy goods. WARNING To prevent injury to personnel and damage to materials when lifting an RBS cabinet, we strongly recommend using Lifting Kit NTM 201 292.
  • Page 389 OPEN INFORMATION TRANSPORT PLANNING 3 ( 5 ) Nr — No. 1204-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Lifting Kit NTM 292 Table 1 Item Product No. Description SXA 120 183 Top bar SCA 360 04 Washer 03/SBA 166 100/0250 Screw SXA 120 184 Lifting sling...
  • Page 390 OPEN INFORMATION TRANSPORT PLANNING 4 ( 5 ) Nr — No. 1204-COH 109 2015/1 Uen Datum — Date File 1998-02-06 Note Unscrew the cabinet feet approximately 2 cm from the bottom so that they will retain the lifting sling safely in place.
  • Page 391 Nr — No. 1204-COH 109 2015/1 Uen Datum — Date File 1998-02-06 ( VALID ONLY FOR RBS 200 MCC ) Figure 2 Mounting of top bars SXA 120 183 on extension cabinet Cabinet feet unscrewed to retain the sling safely in...
  • Page 393 Faktaansvarig — Subject responsible Nr — No. ERA/LRN/ZG ERAWAIN 006 51-COH 109 2015 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LRN/ZGC (Leif-Olof Fager) 1999-10-20 Glossary - RBS 200 series Contents Page General Terms and abbreviations SEIF v0.11,...
  • Page 394 Some basic terms and acronyms needed for cross-references are also included in the list. In the RBS manuals, terminology defined by GSM is used together with Ericsson terminology. GSM definitions are listed in GSM recommendation 01.04. Definitions of general (mobile) communication terminology are given in CCITT Red book, volume X.
  • Page 395 OPEN INFORMATION LIST 3 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 Glossary Designation of RBS cabinet Radio cabinets on a site are designated A1, B1, C1, A2 . . ., according to site configuration. Abis* GSM standard BSC-BTS interface GSM interface standard defining attributes of the...
  • Page 396 TX-bus, → TIB, → O&M-bus CBCH Cell Broadcast CHannel Cable Connection Board Mounted in the left cable shaft of the cabinet, one at each rack position. CCCH Common Control CHannel CMAS Cellular Maintenance Application System CME 20 Ericsson GSM system...
  • Page 397 LIST 5 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 Ericsson digital land mobile telecommunication system based on the GSM standards. Combiner → FCOMB, → HCOMB COMB DCCH Dedicated Control CHannel DEVCB DEVice Control Bus...
  • Page 398 OPEN INFORMATION LIST 6 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 Exchange Terminal Board Interface board in TRI handling communication with the BSC or cascaded RBS sites. Exchange Terminal Circuit Interface in the BSC between group switch and PCM system.
  • Page 399 OPEN INFORMATION LIST 7 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 L1/L2/L3 Layer 1/Layer 2/Layer 3 LAPD Link Access Protocol on D-channel LAPDm Link Access Protocol on Dm-channel Line Bus RBS internal bus for interconnection of a TRXC to a TRI. Local Maintenance Handler Local Maintenance Terminal Terminal equipment (PC) that can be connected to a TG...
  • Page 400 OPEN INFORMATION LIST 8 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 MTTR Mean Time To Repair O&M Operation and Maintenance General term for activities such as configuration, utiliza- tion of channels (frequency bands), cell planning, system supervision, hardware and software maintenance, subscriber administration, etc.
  • Page 401 TRS, → BTS RBS 200 Radio Base Station 200 Indoor version of an Ericsson radio base station based on the GSM 900 MHz standard. An RBS 200 comprises both hardware and software. RBS 203 Radio Base Station 203 Outdoor version of an Ericsson radio base station for max.
  • Page 402 OPEN INFORMATION LIST 10 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 Redundant Transmission Power DC/DC converter powered from the External Fuse Unit (EFU). Radio Transceiver Terminal Interface board in TRI handling communication with TRXs.
  • Page 403 OPEN INFORMATION LIST 11 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 SACCH Slow Associated Control CHannel SAPI Service Access Point Identifier Synchronization CHannel SDCCH Stand alone Dedicated Control CHannel SIlence Description Signal Processing Extension Circuit board for piggy-backing onto SPU+ board to allow for half-rate function.
  • Page 404 OPEN INFORMATION LIST 12 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 Multiplexing of several channels in one common fre- quency band. Each channel is assigned a certain time division, a time slot, to use. TDMA frame* —...
  • Page 405 Terrestrial Lines and the RBS internal LIBs. Transceiver System Within the Ericsson GSM system CME20, the Trans- ceiver System (TRS) has been developed to meet the GSM recommendations of a Base Transceiver Station (BTS).
  • Page 406 OPEN INFORMATION LIST 14 (14) Nr — No. 006 51-COH 109 2015 Uen Datum — Date File 1999-10-20 Time Slot A 0.577ms time period (TDMA frame subunit) corre- sponding to 156.25 raw bits of information. The eight time slots of each TDMA frame are numbered 0,..., 7. → Burst It is also the name of the logical unit associated with the SPP.
  • Page 407: Revision Information

    Godka ¨ nd — Approved Kontr — Checked Tillho ¨ r/referens — File/reference ERA/LRN/ZGC (Leif-Olof Fager) Product RBS 200 Installation Manual, G-module (LZN 302 006) Revision Information R-state from R6A to R7A General Information • Document number of the manual, and associated docu- ments, has been changed to LZN 302 006 (previous number: EN/LZB 119 1588/1).
  • Page 408 OPEN INFORMATION Product Revision Information 2 ( 2 ) Datum — Date Dokumentnr — Document no 1999-10-05 109 21-LZN 302 006-2 Uen Figure 3, +24 V DC Distribution cabling Figure 7, RX Cabling Figure 10 LIB and alarm cabling • Chapter 3-3, External Cabling −...
  • Page 409: Revision History

    OPEN INFORMATION PRODUCT REV. INFO 1 ( 2 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI 109 21-EN/LZB 119 1588/1-1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-03-12 Revision History Contents Page Revision History...
  • Page 410 Chapter 3; RADIO CABINET; − Section 2, Extension Cabinet; revised from A to B; Figure 13 revised from C to D. − Section 8; RBS 200-TRXT Installation; new document . − Section 9; RBS 200 Installation Instructions; new document . •...
  • Page 411 OPEN INFORMATION PRODUCT REV. INFO 1 ( 4 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/LI 109 21-EN/LZB 119 1588/1-1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1997-12-15 Revision History Contents Page Revision History...
  • Page 412 TROUBLE REPORT INSTRUCTION; revised from B to A; new document number. Trouble Report form has been incorporated into the new document. NUMBERING OF ERICSSON PRODUCTS AND DOCU- MENTS; revised from RA to A; new document number. • Chapter 1; SAFETY; revised from RE to A; new document number.
  • Page 413 OPEN INFORMATION PRODUCT REV. INFO 3 ( 4 ) Nr — No. 109 21-EN/LZB 119 1588/1-1 Uen Datum — Date File 1997-12-15 Section 5; Co-siting; revised from C to A; new document number. Section 6; Connection of TRI;. − Sub-section 6.0; TRI Magazine; rev. A; new document number.
  • Page 414 OPEN INFORMATION PRODUCT REV. INFO 4 ( 4 ) Nr — No. 109 21-EN/LZB 119 1588/1-1 Uen Datum — Date File 1997-12-15 Section 2; Power Supply +24V DC; revised from B to A; new document number • Chapter 5; SUPPLEMENTARY INFORMATION; Section 1.0;...
  • Page 415 OPEN INFORMATION PRODUCT REV. INFO 1 ( 4 ) Uppgjord — Prepared Faktaansvarig — Subject responsible Nr — No. ERA/LZ/TG PIAH 109 21-EN/LZB 119 1588/1-1 Uen Dokansv/Godk — Doc respons/Approved Kontr — Checked Datum — Date File ERA/LZ/TGC (ERABVN) 1998-02-06 Revision History Contents Page...
  • Page 416 OPEN INFORMATION PRODUCT REV. INFO 2 ( 4 ) Nr — No. 109 21-EN/LZB 119 1588/1-1 Uen Datum — Date File 1998-02-06 Revision History R4A to R5A The following changes and/or revisions have been made: • BINDER LABEL; revised from D to E. •...
  • Page 417 OPEN INFORMATION PRODUCT REV. INFO 3 ( 4 ) Nr — No. 109 21-EN/LZB 119 1588/1-1 Uen Datum — Date File 1998-02-06 Page 41; Figure 23; Adapter RPM 113 14/01 has changed Product Number to Adapter KRY 101 1442/1. Page 61; The earth collection bar shall have a resis- tance to earth of less than 10 ohms, changed to, the earth collection bar shall be connected to an earth electrode system according to IEC 1024-1.
  • Page 418 • Chapter 5; SUPPLEMENTARY INFORMATION; Section 1, Lifting Cabinets; Document number changed to 0101, Rev. B. Section header changed to RBS 200 INST. MANUAL, and so forth. Page 4; revised. Extension Cabinet figure removed. • Chapter 7, REVISION HISTORY; revised from A to B.

Table of Contents