Page 1
Installation and operation manual TWO POST BASE PLATE CAR HOIST SINGLE POINT RELEASE SUITABLE FOR THINNER CONCRETE Model:YL-140B...
Page 2
Mention of no responsibility 1:Please check whether the content of articles is in accordance with the list when the customer accepts the equipment.Please check if your equipment is damaged or lost during the transportation while you receive it from the transport company. 2:Please check carefully if the package looses when you receive the equipment and disassemble it, to do so to avoid damaging the equipment and injuring the person.
Product Warranty What is not covered under this warranty: a. Any failure that results from purchaser’s abuse, neglect or failure to operate, maintain or service product in accordance with instructions provided in the owner’s manual(s) supplied. b. Any damage caused by overloading lift beyond rated capacity. c.
• Compact design,minimizes the lift wear parts and breakdown ratio • Dual hydraulic cylinders,designed and made on standards. • Self-lubricating UHMW polyethylene slidrs and bronze bushings • Single point security release and dual security design. YL-140B Model Two-post Base plate Hoist single point release Lift Capacity...
Page 5
Foundation size Announcements for safe operation (You must read all of these content) 1. Please read the manual and learn about the safety cautions before you use the equipment. 2. Be careful of your hands and feet, keep them away from the equipment to avoid harm. 3.
Page 6
20. There not allow being any obstacles which stop the support arm down when to operate the lift to fall off. 21. When the lift raise to the highest limit, the mechanical safe hook must be in position and secure (there must be any sound) 22.
Page 7
Model:YL-140B install screw list M18*50 M5*30 total 6 pcs total 12 pcs M5*10 total 8 pcs M10*20 total 8 pcs M8*10 M8*16 total 2 pcs total 4 pcs M5*10 total 2 pcs M4*10 total 3 pcs total 4 pcs...
Page 8
Installation Guide impact bit drill(20mm) hammer leveling instrument(300mm) spanner with crossing groove(8mm~24mm) angle ruler Adjustable spanner(350mm) crow bar tailor’s chalk line and chalk flat head screwdriver and crossing groove head screwdriver tape measure(5m) sharp-nose pliers...
Steps of installation Step1 :Choose installation site Check the follows before installation : 1.Workplace:good building construct,enough work place,no stumbling block to stop working 2.The place where installing the equipment should not be any unsafe element, such as leakage of rain、moist、inflammable、explosive. 3.
Page 10
Step4: Install the master column (column with basement of power unit) 1. Check the dimension of the foot margin before installation to assure the baseboard of the column align with the tailor’s chalk line. 2. Use the holes on the baseboard of the column as formwork to drill holes on the concrete ground (the drill must perpendicular to the ground).
Page 11
Notice for using the power unit 1. Not allow to start-up the pump if there isn’t any oil in it, lest to destroy the gear pump. 2. The electrical equipment must be kept dry; the damage caused by liquid such as water, acid or detergent isn’t in the guarantee range.
Page 12
safety locking system Two-post Base plate Lift Two-post Base plate Lift...
Page 13
steel cables assemble Two-post Base plate Lift 1. ADJUST SYNCHRONIZING CABLES Carriages must be on first set of locks. Use vise grips to hold the cable fitting, meanwhile, use a wrench to tighten the cable nut. Make sure the two cables have the same tension so the carriages lift at the same time.
Page 14
the synchronizing cable has the same tension as the other synchronizing cable. Tighten the jam nut and safety cable 2. ADJUST THE LOWER SPEED You can adjust the lowering speed of the lift if needed. Loosen the locking nut on the throttle valve and turn the throttle valve clockwise to decrease the lowering speed or counterclockwise to increase the lowering speed.
Page 16
Concrete strength Install Outer Arm 1. Place the appropriate lift arm assembly in the lift heads. 2. Install the lift head pins in to the lift head and through the holes in the arm assembly. 3. Each arm restraint gear can be oriented in a Left or Right configuration on the arms. Each arm and arm restraint gear must be positioned in the proper location in the lift head...
Page 17
4.Install Arm Lock assembly in to the lift 5. Install Arm lock pins in to the lift 6. Pull up arm lock rod to ensure it is fully unlocked, adjust in this state. Adjust nut as shown. 7. Adjust the arm lock. Follow the arrow direction. 8.
Page 18
9. Verify the operation of the lift restraints by pulling up on of the arm restraint assembly. Pivot the arms back and forth and test the operation of the arm restraint pin in various positions. 10. Ensure that the arms do not move when a force of approximately 100 pounds or less is applied laterally to the fully extended arms.
Exhaust and Debug 1. You need to exhaust and debug when you finish the lift installation. 2. Fill the oil tank with enough oil (not too full) and press the down-up button after connecting the electric power, then the lift up and the hydro-cylinder works. 3.
Need help?
Do you have a question about the YL-140B and is the answer not in the manual?
Questions and answers