PERGE CONTENTS Preface Introduction Technical data and cross-sectional images Norms and certificates Warnings and Specification Labels Installation and environmental conditions Joining Two Refrigerators Installation of the sides Base Assembly Front Glass Assembly Lighting Electrical Connections Temperature control 30 Cleaning, Maintenance and Technical Service...
PERGE Preface This manual has been prepared taking into account Bodrum model refrigerator In general, the following details have been included. -How to use the refrigerator -Technical Specifications -Installation and assembly - Information and recommendations for users -Maintenance operations The manufacturer company does not bear any responsibility in the following cases.
PERGE Introduction Perge refrigerator is designed as a display showcase for wet cakes, dry cakes, sweet-pastry, dried fruits and similar delicacies. With its high performance, wide front glass and loading capacity, it is suitable for use in pastry shops, markets and supermarkets. It has an ergonomic design with a sliding cover at the back where the clerk can work comfortably.
PERGE Norms and Certificates Norms used as reference and approved certificates of the refrigerator; EN 60204-1; EN 61439-1; EN 61439-2 ENVIRONMENTAL CLIMATIC ENVIRONMENT (EN 23953-2) This refrigerator has been tested according to ambient temperature class 3. Climatic Dry Air Relative...
PERGE High voltage label The high voltage label is located on the electrical box under the cabinet. Product identification tag The identification tag is located on the left side of the back of the cabinet under the bango and includes all technical specifications.
PERGE Installation and environmental conditions Follow the instructions below for installation Conditions to be considered regarding the placement of the refrigerators -Do not leave or mount the cabinet in the following locations. • Places where there's explosive gas. • Near heat sources •...
PERGE 7. Joining Two Refrigerators Follow the sequence below to combine two or more refrigerators: -Remove sidewalls (if any) -Bring the refrigerators side by side. Remove the pallet. Adjust the height of the legs of the refrigerators and bring their aisles on the same level.
Page 16
PERGE Figure.3 Figure.2 When the two modules are joined together, first connect the top profile struts with the help of M6x20hb hex bolt and M6 nut (Figure-2) then put the stainless sheet on it (Figure-3) In the second step, connect the fittings under the refrigerator with 6k M6,3x45 sheet screws and nuts (Figure-4).
Page 17
PERGE Figure.5 In the third step, connect the cabinet with the help of cabinet joining sheets and fasteners located at the back of the cabinet. Figure.5 The connection parts used are shown below in tables. POSI PART NAME PIECES TION...
PERGE 8. Installation of the sides For the installation of the sides, the side lower panel connection has to be made first. Fix it to the side connection sheets at the front and back of the cabinet's lower chassis with the help of 3 YMB 4x30 screws.
PERGE 9. Base Assembly Installation of rear decor base sheet Base connection traverse The rear décor base sheet is connected to the base connection traverse, which is mounted on the iron profile at the back, with the help of a base knob screw.
PERGE 10. Front Glass Assembly Figure.14 Figure.15 When installing the front glass, it is first attached to the lower aluminum (Figure-14 ) Then aluminum piece is attached to the upper edge of the glass tightly ( Figure-15 ) ISSUE:12/09/2008...
PERGE 11. Lighting fluorescent used illuminate the interior of the refrigerators. Fluorescents are controlled from the pilot box at the back of the cabinet. Figure.9 To insert the fluorescent bulbs, insert both ends into the sockets on the product from bottom to top as in Figure 10.
PERGE 12. Electrical Connections Figure.11 The electrical box is on the lower back of the cabinet. Figure.12 Figure.12 ELECTRIC BOX While making electrical connections, the following details should be observed. Important! Before making the electrical connection of the cabinet, examine the information and electrical diagrams on the definition label and product booklet.
PERGE 13. Temperature control Temperature control is carried out with the thermometer in the rear pilot box. Figure.13 Figure.13 Important! A maximum of 3 aisles should be controlled with a pilot module. PILOT CABINET PILOT CABINET 1. ADD-ON CABINET PILOT CABINET 1.
PERGE 14. Cleaning, Maintenance and Technical Service Attention! MAKE SURE THE REFRIGERATOR MAIN SWITCH IS OFF OR ELECTRIC PLUG IS NOT CONNECTED BEFORE ANY MAINTENANCE AND CLEANING OPERATION! Maintenance and cleaning of your appliance is mandatory at certain time intervals.
Page 26
PERGE Technical Service: Please read the user manual carefully. This way the phone operator can help you more easily Make sure that the ambient temperature and moisture are not outside the values specified. Therefore, make sure that the air conditioning and heater devices are fully operational inside the store.
PERGE 15. Recycling Each country separates and recycles refrigerator parts according to their waste disposal and environmental laws. Parts used in the refrigerator. • Painted sheets : Struts, legs, front and side bases • Copper, Aluminum :Cooling circuit,electrical system • Galvanized sheets :Body bottom sheet and simple parts, pans •...
Need help?
Do you have a question about the PERGE and is the answer not in the manual?
Questions and answers