Addition to the operation manual
MENNEKES ACU / SCU for
controlling charging systems
GERMAN
ENGLISH
FRANÇAIS
ITALIANO
NORSK
NEDERLANDS
SWEDISH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACU and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Mennekes ACU

  • Page 1 Addition to the operation manual MENNEKES ACU / SCU for controlling charging systems GERMAN ENGLISH FRANÇAIS ITALIANO NORSK NEDERLANDS SWEDISH...
  • Page 2 Internet www.MENNEKES.de Copyright © 2016 MENNEKES Elektrotechnik GmbH & Co. KG All rights are reserved by the publisher, including the reprinting and the duplication of this manual and its translation, in whole or in part. No part of this manual may be reproduced in any form whatsoever, or copied with the aid of an electronic duplication system, without the written permission of the publisher.
  • Page 3: Table Of Contents

    Product description..........7 3.1 Delivery content ..........7 3.2 Layout and gear ..........7 3.2.1 Gateway ............. 7 3.2.2 ACU V4 ............7 Technical data ............8 4.1 Device data ............. 8 4.2 Ambient conditions ......... 8 Installation and start-up ........8 5.1 Unpacking the device ........
  • Page 4: About This Document

    1. About this document 1.1 Service This document is an addition to the current operating manual MENNEKES ACU / SCU Please contact MENNEKES or your authorised service part- for controlling charging systems. This addition includes ner. instructions for using the E-Mobility Gateway and is com- Please have the following information ready: plete only together with the said operating manual.
  • Page 5: Symbols Used

    2. For your safety 1.3 Symbols used 2.1 Target groups The activities marked with this symbol may only be carried out by a qualified electrician. 2.1.1 Operator / owner As the operator, you are responsible for the device. This symbol indicates an important note. You are responsible for its proper and safe use.
  • Page 6: Intended Use

    The operator is responsible for the proper and safe use of the device. f Do not use aggressive cleaning agents or chemicals for MENNEKES Elektrotechnik GmbH & Co. KG accepts no lia- cleaning because these may adversely affect and damage bility for any consequences arising from improper use of the surfaces.
  • Page 7: Product Description

    Bag with accessory 2 keys 3x membrane cable entry CLIXX 20 1x membrane cable entry CLIXX 25 3x Quixx membrane sleeve EMT 32 IP66 Abb.: 4. ACU V4 2x sealing plug ø15.6 2x sealing plug ø 24.6 Connections Displays 4x Fischer universal dowel UX 8 x 50 R...
  • Page 8: Technical Data

    4. Technical data 5. Installation and start-up 4.1 Device data 5.1 Unpacking the device WARNING Nominal voltage U 230 V AC ±10 % Danger of death by suffocation Nominal frequency f 50 Hz Nominal current 0.5 A Do not leave packaging material or small parts lying Protection class IP 54 around.
  • Page 9: Choice Of Location

    5.3 Opening the device Abb.: 5. Unpacking f Remove the device from the cardboard box. f Remove rigid foam packaging and plastic bag. f Place the device on a soft surface. Abb.: 6. Opening the device f Retain the packaging or dispose of it according to local regulations.
  • Page 10: Installing The Device

    5.5 Installing the device The connection must be accomplished accor- ding to protection class 2 compliant with DIN EN 60950. f When installing, please note the applicable requirements for compliance with protection class 2 including functional earth. Abb.: 8. Drilling dimensions Abb.: 7.
  • Page 11: Connecting The Bus Cable

    5.7 Connecting the BUS cable Abb.: 9. Connection of the supply line f Strip the supply line and remove wire insulation. Abb.: 11. Connecting the BUS cable f Connect the cable cores to the terminal block (1) according to the label. A shield clamp is attached for connecting the BUS cable.
  • Page 12: Start-Up

    Disconnect the bus cables. f Route the supply line back through the membrane screw The documentation of the MENNEKES ACU / SCU connection of the enclosure. describes the configuration. f Loosen the wall screw connection and remove the device.
  • Page 13: Maintenance Tasks

    Eliminate damage to the device according to regulations. Regular inspection and maintenance assist in trouble-free and safe operation of the device and help increase the ser- f Use only original spare parts from MENNEKES for vice life. repairing. f Check the device for proper operation after repair.
  • Page 14: Cleaning With A Dry Cloth

    8. Storage and disposal 7.5.1 Cleaning with a dry cloth 8.1 Storing the device Remove dust and dirt first by using a brush with soft bristles. For the dry cleaning, you can use a clean cloth suitable for Proper storage of the device serves maintaining the correct plastic surfaces.
  • Page 16 MENNEKES Elektrotechnik GmbH & Co. KG Industrial plugs and sockets Aloys-Mennekes-Str. 1 57399 Kirchhundem, Germany Phone: +49 (0) 2723 / 41-1 +49 (0) 2723 / 41-2 14 *3331541* E-mail info@MENNEKES.de Internet www.MENNEKES.de...