Table of Contents

Advertisement

Quick Links

Doc. No
A.INSTALLATION MANUAL
Ver.
11.0
WBVF
Date
2019-04-02
FOR ELECTRICAL PARTS
Page
1 / 98
Elevator
Installation Manual
For Electrical Parts
This manual is the property of Hyundai Elevator Co., Ltd. and is loaned subject to
return upon demand. Contents of this publication should not be reproduced in
any form without written permission of Hyundai Elevator Co., Ltd..

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WBVF and is the answer not in the manual?

Questions and answers

Summary of Contents for Hyundai Elevator WBVF

  • Page 1 Installation Manual For Electrical Parts This manual is the property of Hyundai Elevator Co., Ltd. and is loaned subject to return upon demand. Contents of this publication should not be reproduced in any form without written permission of Hyundai Elevator Co., Ltd..
  • Page 2 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 2 / 98 REVISION version Specification DATE Editor Manager First Edition 2013.08.24 Edit the format 2013.11.05 Reorganization of the manual 2014.05.30 Add the description for SW1 xiaoli Ver.11...
  • Page 3: Table Of Contents

    3 / 98 Table of Contents Safety Information ........................8 Introduction of WBVF System ....................9 1.1 WBVF Motor Control Block Diagram ..................9 1.2 WBVF Standard Controller Layout ..................10 Preparations for Installation ....................13 2.1 Machine Room Environment ....................13 2.2 Location of the Control Panel ....................
  • Page 4 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 4 / 98 Inside/Outside CAR ......................31 5.1 How to Install CAR Junction Box .................... 31 5.2 How to Install Landing Device (Landing Control Device) ..........34 5.3 How to Install OPB ........................
  • Page 5 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 5 / 98 6.4.1 UCMP Board Composition .............................51 6.4.2 Connector Names ................................52 High Speed Test Drive......................53 7.1 Check List before High Speed Drive ..................53 7.1.1 Balance Work ..................................53 7.1.2 Door Operator work................................53...
  • Page 6 Appendix B. Inverter Initial Start-Up Manual ................72 1. Synchronous Machine ........................72 2. Induction Machine ........................74 Appendix C. Description WBVF System Board ................ 75 1. Control Panel PC Board ....................... 75 1.1 Main Board ....................................75 1.2 SAF Board ....................................77 1.3 USAF Board ....................................78...
  • Page 7 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 7 / 98 4.1 CTC Board ....................................93 4.2 CTX Board ....................................93...
  • Page 8: Safety Information

    IMPORTANT! READ SAFETY NOTE AND THIS PAGE CAREFULLY before installation • When it comes to Installation and Commissioning, Person passing through training course and having a certification provided by Hyundai Elevator co., LTD. is qualified to make a procedure. • Wear safety devices •...
  • Page 9: Introduction Of Wbvf System

    9 / 98 1. Introduction of WBVF System WBVF system combines elevator control and motor drive control into One-Board, and applied 32bit ARM CORE for the MAIN Board for fast data processing performance. It has RTOS (Real Time Operation System) for real time control processing ability. It is based on high performance MCU processing speed to achieve the optimal comfort such as MULTI-PATTERN, direct landing, etc.
  • Page 10: Wbvf Standard Controller Layout

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 10 / 98 1.2 WBVF Standard Controller Layout <Control Panel 15kw Installation layout> <Control Panel 30kw Installation Layout> [Figure 1.2 Controller Layout]...
  • Page 11 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 11 / 98 <Control Panel 15kw> [Figure 1.3 Picture of Control Panel 15kW]...
  • Page 12 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 12 / 98 <Control Panel 15kw Layout> <Control Panel 30kw Layout> [Figure 1.4 Control Panel Parts Layout 15kW/30kW]...
  • Page 13: Preparations For Installation

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 13 / 98 2. Preparations for Installation IMPORTANT! READ SAFETY NOTE AND THIS PAGE CAREFULLY before installation 2.1 Machine Room Environment • Machine room should have sufficient space for the work.
  • Page 14 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 14 / 98 [Figure 2.1 Exterior of CP in Machine Room]...
  • Page 15: Precautions For Installation

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 15 / 98 2.3 Precautions for Installation • CAR communication and hall communication are designed as CAN communication method, so you must thoroughly perform the grounding work in all required parts to prevent malfunction.
  • Page 16 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 16 / 98 • During the low speed operation for installation, Do not insert CAN communication line into MAIN Board. CN11 and CN12 in order to prevent CAN parts damage •...
  • Page 17 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 17 / 98 Voice speaker and 3-way S/W should be connected from the top of CAR to the bottom of COP.
  • Page 18: Check List Before Installation

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 18 / 98 2.4 Check List before Installation READ “Safety Note” in this manual carefully in advance Check List. First of all , the low speed operation should be completed since the work is performed according to WOS engineering method.
  • Page 19 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 19 / 98 2) Check list of Hoist way • Counter weight: CWT  Acquire adequate amount of counter weights to prevent slipping.  Check amount of counter weights are excessive/insufficient or not •...
  • Page 20: Low Speed Test Drive

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 20 / 98 3. Low Speed Test Drive 3.1 Introductions of Machine Room Connection All wirings should use pipes, and especially have thorough end part finishing works for the pipes.
  • Page 21: Process Of Low Speed Test Drive

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 21 / 98 3.2 Process of Low Speed Test Drive 3.2.1 Line Connection 1) Power Line Connection • Connect from U, V, and W connectors, which are inverter output parts, to the motor in the order, and use the ring connector in the motor connector part for sufficient tightening.
  • Page 22: Low Speed Test Drive

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 22 / 98 3.2.2 Low Speed Test Drive During the installation work, for low speed operation, a separate installation remote controller JIG is used, and installation remote controller JIG is composed of Control Panel side remote controller JIG, CAR side remote controller JIG, and installation remote controller.
  • Page 23: Check List For Low Speed Test Drive

    • Set the data with HHT according to "Appendix B: Inverter Initial Start-Up Manual [For more information, refer to WBVF motor drive unit [Inverter] Manual]". • Press UP/DOWN button of the remote controller to check if the rotation direction of the main part matches the UP direction, and if it is reverse, connect one pair among U, V, W reversely to match the direction.
  • Page 24: Hoist Way Cable Harness

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 24 / 98 4. Hoist Way Cable Harness 4.1 How to Connect Traveling Cable (T-Cable) • Due to the characteristics of this system, T-Cable does not go through the middle junction box (Hatch Junction BOX) in principle.
  • Page 25: Components Of Hoist Way Cable Harness

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 25 / 98 4.2 Components of Hoist Way Cable Harness 1) Communication & Interlock Harness • Communication cable: sends the communication for hall indicator signal and button signal and DC24V power to the hall indicator board.
  • Page 26: How To Connect Hoist Way Cable Harness

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 26 / 98 4.3 How to Connect Hoist Way Cable Harness • Preparation and Verification Work  Check the number of floors or CAR marking to see if the cable harness specification precisely matches the site.
  • Page 27 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 27 / 98 [Figure 4.2 Communication, Interlock Harness Cable] ⑪ Pull down the cable by lowering the CAR to the location where the work at the highest floor hanger case part is easy.
  • Page 28 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 28 / 98 ⑰ When the connection between the communication line and the interlock harness cable or the button cable is completed, arrange the cable to prevent interference with door panel operation or CAR operation, operate CAR down to the next floor and stop CAR at the location for easy working, and repeat the above ⑦~⑨works.
  • Page 29 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 29 / 98 CANH CANL HIP: 150m m HPI : 4000m m DOW N [Figure 4.3 Communication Cable and Button Connection (HIP)]...
  • Page 30 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 30 / 98 [HIP TYPE] INTERLOCK [HPI TYPE] HPI TYPE HIP TYPE INTERLOCK INTERLOCK BTN BOX INTERLOCK INTERLOCK BTN BOX Hanger Case INTERLOCK INTERLOCK BTN BOX SERIAL...
  • Page 31: Inside/Outside Car

    [Figure 2.3] ③ Connect CAR junction box and door motor and door encoder. ④ Perform the door adjustment by referring to a separate WBVF Door controller Manual. ⑤ Installation of the CAR junction box and connection of the peripheral devices The following installation work should be performed after turning OFF the main power of Control Panel.
  • Page 32 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 32 / 98 <Main Connection Diagram of the CAR Junction Box> CN10 CTC BOARD CTX Bd CN_T12 OPEN/ CONDE CLOSE NSER SAFETY EDGE SAFETY CC25 EDGE MOTOR...
  • Page 33 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 33 / 98 Devices Connectors Remark Safety switch Emergency exit switch Compen chain switch Jumper if not applied Gate switch 1 Gate switch 2 CC4B Jumper if not applied...
  • Page 34: How To Install Landing Device (Landing Control Device)

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 34 / 98 5.2 How to Install Landing Device (Landing Control Device) 1) Landing device installation Install the landing device main unit at certain location at the top of the CAR using the bracket.
  • Page 35 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 35 / 98 [Figure 5.2 Landing Control Device ASS‟Y Mounting Diagram]...
  • Page 36 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 36 / 98 [Figure 5.3 Landing Sensor]...
  • Page 37: How To Install Opb

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 37 / 98 5.3 How to Install OPB 5.3.1 OPB Connection Information 1) Top Part of the CAR and OPB Main Connection Diagram...
  • Page 38: Load Switch

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 38 / 98 2) Applied Boards and Buttons Board Type Specification Remark COP-30D Board COP Control Board COP control board Same as the circuit board for Hall...
  • Page 39 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 39 / 98 5) Sub COP Connection In sub COP, 『CAN communication cable: C2』 and 『Emergency call button cable: B2』 are taken out. Connect『C2 cable』 to the main COP COP-30D board.
  • Page 40: Cautions During The Connections Between Can Communication Boards

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 40 / 98 5.3.2 Cautions during the Connections between CAN Communication Boards 1) End jumper For smooth CAN communication, end resistor should be attached to the first and end part of CAN bus.
  • Page 41 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 41 / 98 Reference 1) COP Combination Inside the CAR (30 floors or less) COP B'd Combination (Under 30 Floors) Precondition Selection 1 Selection 2 Selection 3...
  • Page 42 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 42 / 98 Reference 2) COP Combination Inside the CAR (62 floors or less) COP B'd Combination (Uuder 62) Precondition (MAIN COP) Precondition Selection 1 Selection 1...
  • Page 43: How To Set Hall Indicator Device

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 43 / 98 5.4 How to Set Hall Indicator Device 1) CPI Installation and Connection After attaching CPI box to the CAR, precisely connect the sticking out CPI cable to CTC Board CN_T12 connector.
  • Page 44: Machine Room Harness

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 44 / 98 6. Machine Room Harness 6.1 MCPU Connection 6.1.1 Board Composition Main board can be divided to CPU part, Memory part, Analog part, Digital part, Communication part, and Display part.
  • Page 45: Connector Name

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 45 / 98 6.1.2 Connector Name Item Remark MAIN POWER Main board power JTAG JTAG connector Control board monitoring EzPort Control board Download connector OPTION BOARD OPTION BOARD connector...
  • Page 46: Main Board Power Specification

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 46 / 98 6.1.3 Main Board Power Specification Item Remark VCC(+5V) Main board power -15V +15V 6.1.4 Check Points after Supplying the Power Item Remark LED1 VCC(+5V) checking signal...
  • Page 47: Saf Board Connection

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 47 / 98 6.2 SAF Board Connection 6.2.1 SAF Board Composition ⑨ ⑬ ⑫ ⑪ ① ② ⑭ ③ ⑮ ④ ⑤ ⑥ ⑦ ⑧ ⑩ [Figure 6.2 SAF Board]...
  • Page 48: Connector Names

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 48 / 98 6.2.2 Connector Names Item Description Remark CN_S1 Control panel emergency stop Figure 6.2① CN_S2 Pit safety line Site connection (pit cable) Figure 6.2② Governor CN_S3 *Note 1.
  • Page 49: Usaf Board Connection

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 49 / 98 6.3 USAF Board Connection 6.3.1 USAF Board Composition [Figure 6.3 USAF Board]...
  • Page 50: Connector Names

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 50 / 98 6.3.2 Connector Names Item Description Remark CN_S1 Control panel emergency stop Figure 6.3① CN_S2 Pit safety line Site connection (pit cable) Figure 6.3② Governor (for terminal block CN_S3 *Note 1.
  • Page 51: Ucmp Board Connection

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 51 / 98 6.4 UCMP Board Connection 6.4.1 UCMP Board Composition [Figure 6.4 UCMP Board]...
  • Page 52: Connector Names

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 52 / 98 6.4.2 Connector Names Item Description Remark Figure 6.4① UCPW UCMP Board power DC 24V Figure 6.4② Program downloading connector MNT : Monitoring Relay Figure 6.4③...
  • Page 53: High Speed Test Drive

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 53 / 98 7. High Speed Test Drive 7.1 Check List before High Speed Drive When all connections and connecting works are completed, inspection work for high speed operation should be carried out.
  • Page 54: How To Set The Initial Operation

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 54 / 98 7.2 How to Set the Initial Operation • The example of the description is based on the total 32 floors. • Insert HHT to the main board “CN16" connector.
  • Page 55: How To Set The Initial Operation For En81-20 Project

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 55 / 98 ⑤ Select 02 PROGRAM → 01 CONTROL → 34 INIT START menu, input "1" input, and when you press ENT key, HHT operation mode is changed to “Initial_Drve".
  • Page 56 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 56 / 98 ③ Use HHT menu to select the installation automatic operation mode. From the following HHT initial menu, select [2] SYSTEM MENU. From FIELD MODE SET-UP menu, select “AUTO DRIVE".
  • Page 57: How To Test High Speed Drive

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 57 / 98 7.3 How to Test High Speed Drive • Refer to the inverter manual to check the inverter data again. • If the initial operation is successfully completed, HHT menu MONITOR → BASIC → INITIAL becomes "OK", and check if it is a safe operation condition again.
  • Page 58 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 58 / 98 2) Detail Mode Use UP or DN key to select 1 or 0, and press ENT key. Setting: 1 → ENT Reset: 0 → ENT <Detail Mode Detail Setting Category>...
  • Page 59 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 59 / 98 Menu Category Function Description AUTO With automatic door operation. CLOSE DOOR maintains CLOSED state (OPEN button action is invalid.) Menu Category Function Description All floors test...
  • Page 60: How To Register Manual Call Using Hht

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 60 / 98 7.3.1 How to Register Manual Call using HHT [2]SYSTEM MENU → [3] DATA SET UP → 6. CALL DATA → 1. MANUAL CALL <Manual Call Detail Setting Category>...
  • Page 61: How To Set Display Code For Each Floor Using Hht

    [2]SYSTEM MENU → [3] DATA SET UP → 4. FLOOR DATA → 2. FLOOR DISPLAY <Display Data> WBVF model does not use a separate DISPLAY CODE, and direct input is used for DISPLAY DATA to be displayed at each floor, and you can input up to 3 characters.
  • Page 62: How To Set Load For Load Cell

    (MONITOR → BASIC → INV CURRENT). ③ For load cell load setting, select the inverter HHT menu PROGRAM → CONTROL → TQBIAS SELEC as “AUTO". For the detail parameters of the load setting, refer to the load setting method in WBVF O&M manual-inverter part.
  • Page 63 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 63 / 98 [Figure 7.2 Indicator Board] Name Contents Remark JUMP during the setting of the The currently set floor FL_SET JUMPER corresponding floor. is displayed at JUMP.
  • Page 64: How To Set Hall Indicator

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 64 / 98 7.5 How to Set Hall Indicator 7.5.1 Indicator Installation and Floor Input ① Insert the connector coming out of the hall button into CH1 or CH4 of the indicator board ②...
  • Page 65 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 65 / 98 Refer to the following Step included in the picture for better understanding! Example of floor input) If you want to 24th floor ID to HIP...
  • Page 66 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 66 / 98 IMPORTANT! HANDICAPPED SETTING : Remove the jumper at REAR DIP of HIP or HPI board. ① During the connection of HIP (HPI) cable, check if there is a reversed connection, disconnection, or short-circuit of P24, N24, CH, CL, etc.
  • Page 67: Hall Indicator Operation And Troubleshooting

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 67 / 98 7.5.2 Hall Indicator Operation and Troubleshooting Floor side indicator is in charge of not only the floor display and operation related lamp display, which is its original role, but also is in charge of the input/output of the button signals.
  • Page 68: How To Operate Pit Inspection

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 68 / 98 7.6 How to operate Pit inspection 7.6.1 Enter into the pit Before enter into the pit, open the door of the pit reset device with key and turn the switch to INSP.
  • Page 69: Appendix A. Vcon Board Manual

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 69 / 98 Appendix A. VCON Board Manual IMPORTANT! READ SAFETY INFORMATION before using a VCON Board. • Install the circuit-braker for effective power disconnection when the board is operated for the first time •...
  • Page 70 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 70 / 98 1. VCON Board Composition and Function [Figure A.1 VCON Board Composition] shows the composition of VCON board. [Figure A.1 VCON Board Composition] As you see in [Figure A.1 VCON Board Composition], VCON board is divided to 2 parts, DC 110V output (CN_V4) and the part for adjusting the brake operating voltage.
  • Page 71 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 71 / 98 2. VCON Board Connection The connector names and the connection diagram of VCON board in [Figure A.1 VCON Board Composition] are the same as [Table A.2 VCON Board Connector], [Figure A.2 VCON Board Brake Voltage Connection Diagram], and [Figure A.3 VCON Board Safety Line Voltage Connection...
  • Page 72: Appendix B. Inverter Initial Start-Up Manual

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 72 / 98 Appendix B. Inverter Initial Start-Up Manual Perform the drive for initial angle setting when initially starting up the synchronous machine. 1. Synchronous Machine Section...
  • Page 73 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 73 / 98 ⑦ Check the CURRENT and ROTOR POS Value under 1 by HHT 1. MONITOR > 1. BASIC > CURRENT 2. MONITOR > 1. BASIC > ROTOR POS ⑧...
  • Page 74 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 74 / 98 2. Induction Machine Section Item Remark EL SPEED Elevator Speed Motor RPM according to MAX RPM Elevator Speed Control MAX FLOOR Elevator Maximum Floors...
  • Page 75: Appendix C. Description Wbvf System Board

    Date 2019-04-02 FOR ELECTRICAL PARTS Page 75 / 98 Appendix C. Description WBVF System Board 1. Control Panel PC Board • Make sure to turn off Main Power when you replace PCB Board • The board‟s settings are all set from the factory. Do not reset except for trouble shooting or replacement.
  • Page 76: Main Power

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 76 / 98 1) Main PC Board. Power Specification Name Remark VCC(+5V) MAIN POWER -15V +15V 2) Check Points after Applying the Power Item Remark LED1(POWER) MAIN BOARD VCC supply verification signal...
  • Page 77 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 77 / 98 1.2 SAF Board SAF Board Name Description Remark CN_S1 Control Panel emergency stop CN_S2 Feet safety line Site wiring(feet) CN_S3 Governor (for terminal block wiring)
  • Page 78 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 78 / 98 1.3 USAF Board USAF Board Name Description Remark CN_S1 Control Panel emergency stop CN_S2 Feet safety line Site wiring(feet) CN_S3 Governor (for terminal block wiring)
  • Page 79 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 79 / 98 1.4 UCMP Board UCMP Board Name Description Remark UCPW UCMP Board power DC 24V Program downloading connector MNT : Monitoring Relay UCIN1 MNT, SS, RST Signal...
  • Page 80 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 80 / 98 1.5 VCON Board VCON Board Name Description Remark AC220V(for rectification) / CN_V1 Brake control power input DC24V(for control) CN_V2 Brake output power DC90~DC160 CN_V3...
  • Page 81: Dot Matrix

    Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 81 / 98 2. COP Panel Board 2.1 COP-30D Board COP Board Name Description Remark Sound adjuster It adjusts the size of the sound. It is destroyed when power cable is incorrectly FUSE connected.
  • Page 82 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 82 / 98 2.2 WCOP30 / WCOP62 Board It is used for Handicapped button input and button expansion. WCOP30 / WCOP62 Board Name Description Remark COMM LED It blinks when there is no problem on CAN COMM PIN No.
  • Page 83 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 83 / 98 DOWN lantern DOWN lantern output in the Car CN_W3 Need NU-LINK Program input It is connected and used for program UPDATE. TOOL • Connect WCOP CLOSE / OPEN button to CU63 (DCB) and CU64 (DOB).
  • Page 84 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 84 / 98 2.3 COP Load Connection and Voice Volume Adjustment Voice and Volume Adjustment in COP Board Name Description Remark SW No. Note MAIN OPB mode select...
  • Page 85 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 85 / 98 PIN No. Contents Remark Connector Name: CC26 load 30% B contact switch Load connector Load detection load 70% A contact switch switch is on the...
  • Page 86 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 86 / 98 2.4 HPI / CPI Indicator It is attached to the boarding floor (HPI) and upper part (CPI) of the Car to display elevator floor and status.
  • Page 87 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 87 / 98 REARDIP When JUMP is released, At normal time, switch it works as REAR(=handicap) HIP. JUMP is connected. When there is a When the sticker is removed, you can verify LED...
  • Page 88 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 88 / 98 3. Boarding Hall Indicator PC Board 3.1 HIP PC Board Indicator Board Name Description Remark JUMP during the setting of the The currently set floor is FL_SET JUMPER corresponding floor.
  • Page 89 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 89 / 98 3.2 GH5 PC Board Board for hall lantern and chime during the destination floor operation without a separate floor display and group operation GH5 Board...
  • Page 90 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 90 / 98 3.3 HIP/HPI/GH5 FIRE/PARKING SW Wiring Name Description Remark Connect to Parking switch PARKING SWITCH connecting part connector Connect to FMR switch FMR(=FIRE MAN RETURN) SWITCH connecting part...
  • Page 91 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 91 / 98 3.4 How to Set HIP / HPI Floor ID (For GH5, use DIP SWITCH in the board) Order Contents Note Connect 24VDC power to the CH1 or CH4 of HIP / HPI...
  • Page 92 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 92 / 98 Refer to the following order included in the picture for better understanding! Example of Floor input) When you want to input『24』floor ID to HIP...
  • Page 93 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 93 / 98 4. CAR Junction Box PC Board 4.1 CTC Board [Figure C.1 CTC Board] 4.2 CTX Board [Figure C.2 CTX Board]...
  • Page 94 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 94 / 98 No. Connector Name Pin No. Signal Name Name and Function Remark B220S 220V power supply(Control Panel) LITS LIGHT output(22X) FANS FAN output (22X) CN_T2...
  • Page 95 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 95 / 98 No. Connector Name Signal Name Name and Function Remark SAFTY RAY B control power(+24V), output CC24B SAFTY RAY B control signal, input SAFTY RAY B control power(0V), output...
  • Page 96 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 96 / 98 Connector Signal Name Name and Function Remark Name PUSH BUTTON (H/W RESET) CN10 Encoder power supply(+5V), output Encoder power supply(0V),output A phase P, input...
  • Page 97 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 97 / 98 Connector Signal Name Name and Function Remark Name ULA signal, input DZ1 signal, input DZ2 signal, input DLA signal, input Automatic operation signal, input...
  • Page 98 Doc. No A.INSTALLATION MANUAL Ver. 11.0 WBVF Date 2019-04-02 FOR ELECTRICAL PARTS Page 98 / 98 Connector Signal Name Name and Function Remark Name Control power +24V CN_T12 DFMR FMR Relay activation output DFR1 FR1 Relay activation output COMP COMP Fan rope HOOK switch...
  • Page 99 WBVF SERIES ELEVATOR MANUAL Apr. 2019 Revision 11 Hyundai Elevator Co.,Ltd. Head office & Factory San136-1, Ami-ri,Bubal-eud,Ichon-shi,Kyonggi-do,Korea P.C:467734 Tel:82-31-644-5114 Fax:82-2-745-4227 Seoul Office 1-83 Dongsoong-dong,Jongro-ku,Seoul,Korea P.C: 11050 Tel:82-2-3670-0660 Fax:82-2-3672-8763/4 Shanghai Hyundai Elevator Mfg.Co.,Ltd. Head office & Factory No.182 Zhenxi (South)Liantang Town,Qinpu District, Shanghai,China P.C:201716...

Table of Contents

Save PDF