Download Print this page

Optronics HDCi LX3 1U Installation Manual

Patch panel

Advertisement

Quick Links

HDCi® LX3 1U Installation Guide
www.optronicsplus.net
LX3 1U
HDCi® LX3 1U PATCH PANEL
INSTALLATION GUIDE
For more information, please contact our sales team: sales@optronicsplus.net
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the HDCi LX3 1U and is the answer not in the manual?

Questions and answers

Summary of Contents for Optronics HDCi LX3 1U

  • Page 1 HDCi® LX3 1U Installation Guide www.optronicsplus.net LX3 1U HDCi® LX3 1U PATCH PANEL INSTALLATION GUIDE For more information, please contact our sales team: sales@optronicsplus.net...
  • Page 2: Safety Precautions

    HDCi® LX3 1U Installation Guide www.optronicsplus.net HDCi® LX3 1U PATCH PANEL INSTALLATION GUIDE Before installing or adjusting this product, please read these instructions carefully. Please keep this guide for future reference. SAFETY PRECAUTIONS GENERAL PRECAUTIONS Before use, all equipment, especially safety gear, must be inspected and tested for proper operation. Replace and repair as necessary.
  • Page 3 HDCi® LX3 1U Installation Guide www.optronicsplus.net HDCi® LX3 High Density 1U Patch Panel Operation manual  The operation steps for internal installation and installing the distribution frame on the rack are as follows: 1:Open the LX3 Panel and check the appearance; 2:Check the quantity of accessory, and prepare a cross screwdriver;...
  • Page 4 HDCi® LX3 1U Installation Guide www.optronicsplus.net 7 : Introduce the optical fibre from the back of module 6: Strip out the optical fibre cable in moderately length, box and split them inside. and fix it up with cable tie 1-Module box 1-Optical fibre cable 2-Cable tie 3-Cable fixing plate...
  • Page 5 HDCi® LX3 1U Installation Guide www.optronicsplus.net © 2024, all rights reserved. Specifications are subject to change without notice. For more information, please contact our sales team: sales@optronicsplus.net...