Summary of Contents for Ultratech Ultra-Modular IBC Spill Pallet 1125
Page 1
Ultra-Modular IBC Spill Pallet ® Assembly Instructions Step 1: Place the (1) Pallets and /or (2) Ex- pansion Tanks in the desired configura- tion Step 2: Locate the two drill points on each mating sidewall of the (1) Pallet and/or (2) Expansion Tank. Note: the drill points are dimples in the sidewall that are located approximately 2 ½”...
Page 2
® Ultra-Modular IBC Spill Pallet Assembly Instructions Step 4: Repeat Step 3 for the remaining drill points in the sidewalls. (Requires two holes each sidewall) Step 5: Repeat Steps 2, 3 and 4 for all mating sidewalls. CAUTION: only cut holes into the sidewalls that are intended to have a (3) bulk head fitting.
Page 3
® Ultra-Modular IBC Spill Pallet Assembly Instructions Step 8: Repeat Steps 6 and 7 for the re- maining mating holes in the sidewalls. Step 9: Tighten the (3A) bulk head fit- tings using two 3/8” drive ratchets (not provided) along with the (4C) hex socket wrench and the (4A) lug spanner wrench.
Page 4
® Ultra-Modular IBC Spill Pallet Assembly Instructions 2-Tank 3-Tank 4-Tank 5-Tank Item Part # Description Model Model Model Model 9630 Yellow Spill Pallet 1124 Yellow 66G. Expansion Tank 1117 1.25” Bulkhead Fitting Assembly Bulkhead Fitting (2 per pack) Gasket (4 per pack) Hex Nut (2 per pack) 1118 Wrench and Hole Saw Kit...
Need help?
Do you have a question about the Ultra-Modular IBC Spill Pallet 1125 and is the answer not in the manual?
Questions and answers