Steiel HTH easiflo IP Series Installation And Operation Manual

Chlorine feeders

Advertisement

Quick Links

®
easiflo
IP Series
Chlorine Feeders
Installation and Operation Manual
for Models 20, 50, 100
Manufactured by STEIEL Elettronica srl
Viale Europa, 24 – 35020 Ponte San Nicolò (PD) - Italy
Tel. +39.049.8961488 |
info@steiel.it
|
www.steiel.it

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HTH easiflo IP Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Steiel HTH easiflo IP Series

  • Page 1 ® easiflo IP Series Chlorine Feeders Installation and Operation Manual for Models 20, 50, 100 Manufactured by STEIEL Elettronica srl Viale Europa, 24 – 35020 Ponte San Nicolò (PD) - Italy Tel. +39.049.8961488 | info@steiel.it www.steiel.it...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS SAFETY AND ENVIRONMENTAL ADVICE ................page 3 GENERAL INFORMATION ......................5 DESCRIPTION OF THE SYSTEM ....................6 Operation Principle ......................7 Water Chemistry ....................... 8 Supply Water ........................8 HYDRAULIC INSTALLATION ......................9 ELECTRICAL PANEL ........................13 START-UP PROCEDURE ......................
  • Page 3: Safety And Environmental Advice

    SAFETY AND ENVIRONMENTAL ADVICE The use and operation of this equipment may modify the chemical composition of water in your pool. It is therefore necessary to read these instructions carefully and ensure that ALL ® ® staff is properly trained on the use of the easiflo IP feeder.
  • Page 4: Risk Management

    Risk Management ® ® The installation and commissioning of the hth easiflo IP feeders must be performed only by qualified technicians. The installation must comply with all current safety regulations! Before wiring the device or acting on electrical outputs, make sure that the system is unplugged! Never open the device when is powered! Maintenance and repair operations must be performed by qualified technicians!
  • Page 5: General Information

    GENERAL INFORMATION Transport and Storage ® ® To prevent any damage, it is recommended to transport and store the hth easiflo feeder in its original packaging. Ambient temperature and humidity for the storage must be within the following ranges:  Temperature -10 …...
  • Page 6: Description Of The System

    DESCRIPTION OF THE SYSTEM The hth® easiflo® IP feeder, used with calcium hypochlorite 7g briquettes, provides effective chlorination of water in pipelines or tank, through a metering pump. The equipment has been designed for ease of use and to allow easy access for routine cleaning and maintenance.
  • Page 7: Operation Principle

    Operation Principle The water inlet to the feeder is controlled by a solenoid valve, which allows water to enter in the spray bar to wet the calcium hypochlorite briquettes. As the briquettes are sprayed, a chlorinated solution is generated, falls into the feeder tank, and is then injected into the water to be treated by a dosing pump.
  • Page 8: Water Chemistry

    Water Chemistry  Total alkalinity 60 … 80 ppm CaCO (6 … 8 °f)  Hardness < 250 ppm CaCO (< 20 °f)  pH 7.0 … 7.6 Supply Water ® ® The hth easiflo IP feeders (models 20 / 50 / 100) need that the supply water meets the following conditions: ...
  • Page 9: Hydraulic Installation

    HYDRAULIC INSTALLATION Feeder Location Ensure that the feeder is installed in a suitable area of the technical room, easy to access for filling the feeder hopper and any maintenance. The electrical control panel should be installed in a well-ventilated area, far from any splashes of water or chemical products.
  • Page 10 Installation in Swimming Pool Plants Support clamps, pumps, dosing and plant isolation valves are not provided with the feeder. easiflo-IP Istallation & Operation Manual rev.1 – 04/2023 page 10...
  • Page 11 Connection of the Water Supply Line Three hydraulic lines are required. If the supplied tubing (10 m) is not enough for your installation, order more PE tube ½”. To prevent any malfunctions of the feeder, you need to follow the guidelines for the installation of the supply water line! All connection must be tight and secure to deal with the inlet pressure coming from the main supply line.
  • Page 12 Connection of the Dosing Pump Carefully read the pump instruction manual before installing it! The suction hose of the dosing pump must be connected to the feeder outlet fitting, as shown in the above figure. For this purpose, use tubing of ½”. The delivery hose of the dosing pump must be connected to the injection point of the chlorinated solution into the plant.
  • Page 13: Electrical Panel

    ELECTRICAL PANEL All electrical connections are controlled by the panel described here below. You need to wire the panel to mains and perform four connections to the feeder, each one through a specific cable-gland of the electrical panel. Bottom view, cable-glands The full wiring diagram of the control panel is provided inside the control box.
  • Page 14: Circulation Pump

    Hopper Lid Safety Switch  Connector HOPPER LID The safety switch on the hopper lid stops feeder operations when the lid is open and, therefore, allows safe interventions. Connect the male connector of the switch cable to the special input located on the electrical box bottom side (see drawing), by rotating it of ¼...
  • Page 15: Solenoid Valve

    Level Float Sensor  Cable-gland LEVEL SENSOR This connection is used to control the solution level inside the feeder base. Connect the three-wire to the X1 block, terminals 1-2-3 (see the wiring diagram inside the control box). Terminal 1: brown wire Terminal 2: blue wire Terminal 3:...
  • Page 16: Start-Up Procedure

    START-UP PROCEDURE Use ONLY calcium hypochlorite hth® briquettes 7 g ! Never load other chlorinating product in the feeder, because this could result in undesired reactions or even explosions. NEVER mix chemicals inside the feeder! Start-up: 1. Check that all hydraulic and electrical connections have been performed correctly. 2.
  • Page 17: Maintenance

    MAINTENANCE Before starting any maintenance operation, wear all required PPE to work with calcium hypochlorite solutions! Washing Operation It is recommended to activate the internal washing system once a week, to minimize the build-up of deposits and incrustations which could damage or block the dosing pump. Ensure that the rinsing tube of the feeder base is connected to a discharge point in the technical room, then proceed as follows: 1.
  • Page 18 Cleaning Procedure with Acid Incrustation build-up and maintenance frequency depends on the quantity of product used and from the chemical composition of the supply water. It is recommended to perform this maintenance monthly. This is the easier procedure to remove incrustations and scale build-ups. ®...
  • Page 19 ® 7. Refill the cleaning pan with 5 litres of water and add slowly 1 litre of hth BANISOL® EXTRA descaling product. Let act for at least 20 minutes. 8. Check that incrustations and scale have been fully removed, otherwise empty safely the pan and repeat step 7.
  • Page 20: List Of Spare Parts

    LIST OF SPARE PARTS Description Part No. Item GRID for easiflo® 20 IP & FIRST AM4000021 GRID for easiflo® 50 IP & FIRST AM4000022 GRID for easiflo® 100 IP & FIRST AM4000023 SPRAY MANIFOLD INLET KIT for easiflo® IP AM4000190 SPRAY MANIFOLD OUTLET KIT for easiflo®...
  • Page 21 Item Description Part No. VENTURI KIT for easiflo® IP AM4000195 NON-RETURN BALL VALVE D32 EPDM AM4000038 PVC BALL VALVE AM4000039 FEMALE BALL VALVE ½” AM4000125 easiflo-IP Istallation & Operation Manual rev.1 – 04/2023 page 21...

This manual is also suitable for:

Hth easiflo 20 ipHth easiflo 50 ipHth easiflo 100 ip

Table of Contents