Download Print this page
DEFA eRangeACC BH DUO cc160 Installation Manual
DEFA eRangeACC BH DUO cc160 Installation Manual

DEFA eRangeACC BH DUO cc160 Installation Manual

Stand w/roof

Advertisement

Quick Links

eRangeACC | BH |
DUO stand w/roof | cc160
Installation manual
Art: 713509
Art: 714429
The working steps described in this manual must only be carried out by
EN
qualified specialist personnel according to local rules and regulations.
Arbeidet beskrevet i denne manualen må utføres av kvalifisert personell iht.
NO
lokale forskrifter og bestemmelser.
Arbetet som beskrivs i den här handboken måste utföras av kvalificerad
SE
personal i enlighet med lokala bestämmelser och föreskrifter.
Tämän asennusohjeen esittämät työvaiheet on tehtävä aina alan ammattilaisen
FIN
toimesta ja kansallisia määräyksiä ja säädöksiä noudattaen.
NO
SE
FIN
EN
defa.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the eRangeACC BH DUO cc160 and is the answer not in the manual?

Questions and answers

Summary of Contents for DEFA eRangeACC BH DUO cc160

  • Page 1 Arbetet som beskrivs i den här handboken måste utföras av kvalificerad personal i enlighet med lokala bestämmelser och föreskrifter. Tämän asennusohjeen esittämät työvaiheet on tehtävä aina alan ammattilaisen toimesta ja kansallisia määräyksiä ja säädöksiä noudattaen. defa.com...
  • Page 2 Content/Innhold/Innehåll/Sisältö 14 x...
  • Page 3 Art.no.: 712321 / 714438 Art.no.: 109434 Other optional modules may also be available. Please contact your local distributor if you require additional information or would like to place an order. Visit www.defa.com or salto.no for further information. Andre tilleggsmoduler kan også tilkomme.
  • Page 4 The base foot has CC160 square 160mm hole dimensions for m12 bolts. The base can be mounted on a prefabricated foundations for the stands, See related products for information. Alternatively, the operator may contruct or cast foundation. Ensure that the filler provides good drainage and stability. Fotplaten har CC160 (160mm senter til senter) hull dimensjon for M12 bolter.
  • Page 5 Ensure that touchable metal parts (front and rear panels) are connected to protective ground (PE), with supplied sets of earthing wires. Terminate earth wires to designated points according to details on sketch. Connect the earth wire for the stand to the terminal block in the charging station (end with ferrule). If uninsulated earth conductor is laid in a cable trench, terminate in a side bolt where the earthing wires are attached.
  • Page 6 Max. 1,2Nm...
  • Page 7 On both sides. På begge sider. På båda sidor. Molemmilla puolilla. For mounting of distrubutor box (not included) For montering av koblingsboks (medfølger ikke) För montering av fördelningsdosa (medföljer ej) Kytkentärasian kiinnitys (Lisävaruste)
  • Page 8 71,6 8× HCN A2 M5-1 8× HCN A2 M5-1 Material Dimension Design by Drawing by Approved by Projection type: 1.4301 (X5CrNi18-10) t = 4,0 1st Angle Ytbehandling / Surface treatment Revision date Drawing date Approved date 2021-04-27 2021-04-27 Generell tolerans / General tolerance Ritningsnr / Drawing No.
  • Page 10 NORWAY DEFA AS Slependveien 108 1396 Billingstad Tlf.: 32 06 77 00 Support: evsupport.no@defa.com SWEDEN DEFA AB Finlandsgatan 40 164 74 Kista Tlf.: 010-498 38 00 Support: emobility.se@defa.com FINLAND DEFA OY Tähtäinkuja 2 01530 Vantaa Puh, 020 152 7200 Tuki: info.suomi@defa.com...

This manual is also suitable for:

713509714429