Page 1
Determine location of EPM Version 1.0 Step 3: Hang the EPM on the bracket by the steps below. Following minimum clearance is required. Solis-EPM3-5G-PRO 300mm 300mm 300mm Step 4: Fix the two locking screw on both side of the bracket 300mm and connect the grounding wire to the grounding screw.
Connect cables 3.1 Grid input cable -> Grid Port 3.3 Meter Communication -> CT 1/Meter Port 3.3.2 Wiring and installation of meter Connect the grid input cables to the grid connector and then to 3.3 1 Connection between EPM and meter 3.3.2.1 Specification of electricity meter the Grid port of the EPM as described below.
Page 3
Communication Comm-INV direction. 4.2 Set Inverter Quantity YES=<ENT> NO=<ESC> Set the total capacities of the inverters connected with EPM. Select: Forward Communication is a 4-pin RS485 communication port which YES=<ENT> NO=<ESC> is used to connect Solis datalogging stick. Set Capa.: 00000000W...
Inverter Setting 4.5 Select Standard 4.9 Set Export Compensate To match the normal use of EPM, the inverter needs to be set accordingly. G100_V1: UK power control. This setting is used to compensate the export power value which Setting Path: Settings -> Password:0010 G100_V2: UK current control.
Need help?
Do you have a question about the Solis-EPM3-5G-PRO and is the answer not in the manual?
Questions and answers