Download Print this page

SHELTER IBIZA DAYBED Assembly Instructions Manual

Advertisement

Quick Links

IBIZA DAYBED ASSEMBLY INSTRUCTIONS
The following instructions refer to the standard model and do not take into account any customizations required by the client.

Advertisement

loading
Need help?

Need help?

Do you have a question about the IBIZA DAYBED and is the answer not in the manual?

Questions and answers

Summary of Contents for SHELTER IBIZA DAYBED

  • Page 1 IBIZA DAYBED ASSEMBLY INSTRUCTIONS The following instructions refer to the standard model and do not take into account any customizations required by the client.
  • Page 2: Finishing The Assembly

    PREVIOUS RECOMMENDATIONS BEFORE THE ASSEMBLY: 20 min - READ THE MANUAL COMPLETELY BEFORE INITIATING THE INSTALLATION. - FOLLOW THE STEPS IN THE INDICATED ORDER. - AVOID, OR USE VERY CAREFULLY, THE CUTTER OR CUTTING ELEMENTS AT THE MOMENT OF UNPACKING THE GOODS TO AVOID SCRATCHES IN THE SAME ONE.
  • Page 3 T1+A2 FIX PROFILES WITH A1 AND T1 THAT YOU REMOVED BEFORE. BASE REMOVE T1+A1 FROM THE CURVES AND LEAVE IN SAME PLACE THE E NUTS. T1+A2 T1+A1 T1+A1 DOUBLE HOLE PLACE PP PROFILES PAYING ATTENTION TO THE DOUBLE HOLE POSITION.
  • Page 4 A1 + T2 SET THE PS2 PROFILES TO THE PP PROFILES WITH A1+T1. SOMIER MATTRESS BASE PLACE "C" CURVES IN "PS2" PROFILES. PUT ONE "E" NUT INSIDE EACH CURVE OF PS2 PROFILES PLACE CURVES "C" IN THE "PS1" PROFILES AND THEN IN THE OUTSIDE.
  • Page 5 PLACE T1 AND T2 TUBES FIX TUBES WITH T1+A1...
  • Page 6 PLACE FABRIC OVER THE TUBES T1 AND T2. PLACE MATTRESS ON SOMIER INTRODUCE TLTUBES IN THE EXTREMES OF THE FABRIC.
  • Page 7 @shelteroutdoor shelter.outdoor shelter-outdoor...