ASKOMA ASKOWALL 012-2102 Fitting Instruction And User Manual

Wall console

Advertisement

ASKOWALL
 
 
Fitting instruction, user manual and service
Please keep in a safe place
Wall console ready for connec on for hea ng water

ASKOWALL
 

012‐2102 
 
Index
 
General safety informa on   
 
Design 
 
 
Func onal descrip on   
 
Scope of delivery  
 
Assembly and installa on 
 
Filling 
 
 
Leakage check   
 
Se ng of thermosta c valve  
 
Overview electrical connec on 
 
Closing of insula on cover   
 
Installa on instruc ons 
 
 
Electrical connec on
 
Electric diagram for 012‐2102 
ASKOWALL 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
MVGASV_012‐2102_01_en 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
www.askoma.com  
Page 2 
Page 3 
Page 4 
Page 4 
Page 5 
Page 9 
Page 10  
Page 10 
Page 11 
Page 12 
Page 14 
Page 13 
Page 1 
 

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ASKOWALL 012-2102 and is the answer not in the manual?

Questions and answers

Summary of Contents for ASKOMA ASKOWALL 012-2102

  • Page 1   Page 12    Installa on instruc ons                      Page 14      Electrical connec on     Electric diagram for 012‐2102                    Page 13  ASKOWALL  MVGASV_012‐2102_01_en  www.askoma.com   Page 1   ...
  • Page 2: General Safety Information

    . ASKOWALL  MVGASV_012‐2102_01_en   www.askoma.com   Page 2   ...
  • Page 3 Filling valve  3.  Vent valve  4.  Connec on for possible expansion tank (1" internal thread, flat sealing)   5.  Pressure relief valve  6.  Return flow shutoff & OXYban hose connec on  7.  Flow shutoff & OXYban hose connec on   8.  Thermosta c valve 50 ‐ 75°C   9.  1½" threaded connec on for screw‐in heater   10.  Drain cock  11.  Circula on pump  12.  Insula on housing  13.  Instantaneous water heater ASKOFLOW   14.  Console rear wall  15.  Electrical junc on box for pump incl. OFF‐delay relay  ASKOWALL  MVGASV_012‐2102_01_en  www.askoma.com   Page 3   ...
  • Page 4: Functional Description

    Scope of delivery S c o p e o f d e l i v e r y The delivery includes the ASKOWALL incl. the rear wall and two‐part insula ng sleeve, these assembly  instruc ons, four screws (6 x 70mm), four dowels (8 x 50mm) and a piece of hose for the connec on to  the blow‐off line.  Ar cle 012‐2102 ASKOWALL also includes a housing for connec ng the pump.    The ASKOWALL does not include any connec on hoses or screw‐in heater. This screw‐in heater is re‐ quired for commissioning, but must be ordered separately.     ASKOWALL  MVGASV_012‐2102_01_en   www.askoma.com   Page 4   ...
  • Page 5: Assembly And Installation

    ASKOWALL     Assembly and installation Material and tools Various open‐end wrenches, impermeable material, a Ø 8mm rock drill & impact drill (for wall  moun ng on a brick or concrete wall), a hea ng vent key and hoses for filling and ven la on are requi‐ red for the installa on of the ASKOWALL.    If the ASKOWALL is connected to a heat exchanger, a suitable expansion vessel is necessary.          ASKOWALL  MVGASV_012‐2102_01_en  www.askoma.com   Page 5   ...
  • Page 6 ASKOWALL     Assembly and installation 6  7  6  Opening the insula on cover Before opening the insula on cover, the two shut‐off valves of flow and return (no. 6 and no. 7) must  be closed.  Remove the insula on cover carefully and, if possible, evenly so that the six locking pins on the cover  do not tear off.  Re ghten screw connec ons All screw connec ons marked with a red dot must be re ghtened for safety reasons. A leak test has  already been carried out at the factory during manufacture.  ASKOWALL  MVGASV_012‐2102_01_en   www.askoma.com   Page 6   ...
  • Page 7 ASKOWALL     Assembly and installation ASKOWALL can be a ached to the wall using the four screws supplied.     The holes have to be drilled according to the drawing.  ASKOWALL  MVGASV_012‐2102_01_en   www.askoma.com   Page 7   ...
  • Page 8 ASKOWALL     Assembly and installation 6  6  6  7   Seal the screw‐in heater with approved sealing material and screw it in   The screw‐in heater‘s cable glands must be posi oned downwards   Connect the drain hose of the safety valve to the on‐site drain according to the regula ons   Connect the supply and return lines on the shut‐off valves (no. 6 and no. 7) of the ASKOWALL .     Therefor the connec on hoses for ASKOWALL with the ar cle number 012‐0130 can op onally be  used   ASKOWALL  MVGASV_012‐2102_01_en  www.askoma.com   Page 8   ...
  • Page 9 Connect  the  hea ng  water  inlet  to  the  drain  cock  (no.  10)  and  open  the  drain  cock.  The ASKOWALL is filled by supplying the hea ng water, the air can escape from the open vent  valve.  If  only  hea ng  water  comes  out  of  the  vent  valve,  the  ASKOWALL  is  completely  filled  and  the  vent valve (no. 3) can be closed. The drain cock must be closed before dismantling the hea ng  water supply.  ASKOWALL  MVGASV_012‐2102_01_en   www.askoma.com   Page 9   ...
  • Page 10: Leakage Check

    A er opening the two shutoff of flow and return (no. 6 & 7), the system must be checked for leaks. No  water leakage may be detected.  If a screw connec on is leaking, it must be re ghtened.  Setting of the thermostatic valve Se ng the output temperature to the buffer tank (opening temperature of the thermosta c valve) 1.  Pull the lower plas c ring up and hold it there.  2.  Set the rotary control to the desired temperature (turn).    Then release the lower plas c ring and snap it into place.  ASKOWALL  MVGASV_012‐2102_01_en   www.askoma.com   Page 10   ...
  • Page 11: Electrical Connection

      Customer connec on cable  A supply line must be created for the circula on pump, the pump requires 1x 230V~, the current  consump on is a maximum of 0.52A      A supply line for the load circuit of the hea ng element must be created. The power consump ‐ on  and  the  connec on  op ons  are  device‐dependent  (see  separate  installa on  /  opera ng  in‐ struc ons for the screw‐in heater)  ASKOWALL  MVGASV_012‐2102_01_en  www.askoma.com   Page 11   ...
  • Page 12 6  7  ATTENTION: Before closing the insula on cover, the two shut‐off valves of flow and return (no. 6 and  no. 7) must be closed. Otherwise the insula on cover cannot be closed.  1.  Close the shut‐off valves of flow and return (no. 6 and no. 7).  2.  The two insula on washers supplied are for closing the connec ons of the expansion tank (no. 4)  and the drain cock (no. 10) that may not be used. These can be inserted into the prefabricated  slots.  3.  A er closing the cover, the shut‐off valves of flow and return can be opened again.  ATTENTION: Pipes, fi ngs and connec on hoses can be hot, there is a risk of burns! ASKOWALL  MVGASV_012‐2102_01_en   www.askoma.com   Page 12   ...
  • Page 13: Electric Diagram

    ASKOWALL     Electric diagram Electric diagram for 012‐2102 ASKOWALL   ASKOWALL  MVGASV_012‐2102_01_en  www.askoma.com   Page 13   ...
  • Page 14: Installation Instructions

    I n t h e e v e n t o f t h e f o l l o w i n g t h e g u a r a n t e e i s v o i d : ‐  Not complying with this paperwork „Fi ng instruc ons, user manual, and service“  ‐  Not complying with the storage heater manufacturer‘s fi ng instruc ons  ‐  Technical modifica ons, repairs or tampering with the device     (including exchanging the pump, piping or the valve)  ‐  Hea ng up drinking water  ‐  Applica ons for which the device was not designed  ‐  Installa on of a foreign hea ng element  ‐  Incorrect opera on and maintenance  ‐  Not complying with direc ve VDI 2035  All power supply circuits must have been switched off before  ATTENTION! accessing the connection terminals.  ASKOWALL  MVGASV_012‐2102_01_en  www.askoma.com   Page 14   ...

Table of Contents