Sens BCS-120 Getting Started

Battery control system

Advertisement

Quick Links

Getting Started
Mounting
Connections
Note - remove cover to access
connections
80A BREAKERS
FOR BATTERY
BANKS 1 AND 2
CONNECT BATTERIES
TO BATT 1 AND BATT 2
TERMINAL LUGS
CAUTION:
always
disconnect batteries
before service
CONNECT ENGINE
GROUND TO
GROUND LUG
CONNECT TO
ALTERNATOR B+
TERMINAL THROUGH
AN EXTERNAL CIRCUIT
BREAKER
IMPORTANT!
THIS SIDE UP
Mounting holes sized
for 5/16 inch hardware
IMPORTANT:
MOUNTING HARDWARE IS
ENGINEERED FOR THE WEIGHT
AND LOCAL SEISMIC
CONNECT DC
LOAD/ENGINE PANEL
ENSURE
REQUIREMENTS.
Conduit knockouts on
chassis bottom sized
for 1 inch, 1.5 inch,
and 2 inch conduit
DC LIGHTS OR AUXILIARY DC
OUTPUT CONNECTION
800-742-2326 / 303-678-7500 /
BCS-120
Battery Control System
Lorem ipsum
10A BREAKER
FOR DC LIGHTS
OPTIONAL
ALTERNATOR
FEEDBACK CONNECTION
TO COMPENSATE FOR
ISOLATING DIODE DROP
OPTIONAL
CONNECTION
FOR TEMPORARILY
ENERGIZING
ALTERNATOR B+
TERMINAL TO INITIATE
CHARGING
Need Help?
CONTACT SENS CUSTOMER SERVICE:
service@sens-usa.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the BCS-120 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sens BCS-120

  • Page 1 TERMINAL TO INITIATE CONNECT ENGINE CHARGING GROUND TO GROUND LUG CONNECT TO ALTERNATOR B+ TERMINAL THROUGH DC LIGHTS OR AUXILIARY DC CONNECT DC AN EXTERNAL CIRCUIT LOAD/ENGINE PANEL OUTPUT CONNECTION BREAKER Need Help? CONTACT SENS CUSTOMER SERVICE: service@sens-usa.com 800-742-2326 / 303-678-7500 /...
  • Page 2 Installation/Operation The Battery Control System (BCS-120) delivers power from two different isolated battery banks to DC loads, such as the engine control panel and ancillary DC loads. Additionally, the BCS-120 distributes a single alternator charge feed to the two isolated battery banks.