Original This manual is an uncontrolled document. Chubb Fire & Security Pty Ltd (“Chubb”) reserves the right to alter this manual at any time in accordance with our policy of continuous development. Chubb welcomes feedback regarding this manual and associated equipment.
The Customer is entitled to a replacement or refund for a major failure and to compensation for any other reasonably foreseeable loss or damage. The Customer is also entitled to have the PEFS F3N System repaired or replaced if the PEFS F3N System fails to be of acceptable quality and the failure does not amount to a major failure.
Intended use The PEFS F3N System is a fire suppression system, installed as part of an overall fire risk reduction strategy, as defined in the fire system specifications and or risk assessment outcomes. As such, it is designed to suppress a fire occurring in the specified risk area only within the documented coverage area of each installed nozzle.
PEFS F3N systems consist of pressurised cylinders containing fluorine free foam solution, actuation devices to initiate discharge and a discharge network which includes aspirating spray nozzles to direct the foam spray onto the hazard. PEFS F3N systems may be configured for both manual and automatic operation.
The presence of salts in water that is used to fill PEFS F3N cylinders may have an impact to the firefighting performance of the foam, can clog the pressure indicator, bind the valve actuation mechanism, inhibit the removal of the cylinder valve and or lead to pitting corrosion of the cylinder.
The following maintenance schedule is based on the schedule detailed in AS5062 and those requirements applicable to all the hardware and design features detailed in the PEFS F3N Design, Installation and Commissioning manual. The maintenance schedule is ordered in the recommended sequence of maintenance activities for the PEFS LOP System and does not follow the order given in AS5062.
Yearly Service Instructions Discharge Test [Optional] (Item 9) An annual discharge test can be used to confirm the complete PEFS F3N system operates and performs as that intended as when originally commissioned. Please refer to the Chubb PEFS F3N Foam Concentrate SDS prior to carrying out the Discharge Test. Discharge of foam solution must be handled according to national or local waste regulations.
Cylinders must only be filled with clean potable water (chloride ion content <150ppm). The fill quantities for each size cylinder are detailed in the table below. Please refer to the Chubb PEFS F3N Foam Concentrate SDS prior to handling the foam concentrate. Cylinder Size...
Prior to servicing any LOP actuators ensure the system is depressurised by depressurising the PEFS F3N cylinders using the Schrader valve fitted to the cylinder Filler Plug Assembly. Ensure pressure indicators on manual actuator reads zero pressure.
Prior to replacing any LOP detection tubing ensure the system is depressurised by depressurising the PEFS F3N cylinders using the Schrader valve fitted to the cylinder Filler Plug Assembly. After having depressurised the PEFS F3N system: 1.
1786 1816 1847 1878 Table 5 - PEFS F3N cylinder charging pressure versus ambient temperature After Maintenance Activities After the Yearly maintenance activities have been completed: 1. Ensure all pressure indicators are reading in the green zone. 2. Ensure all labels are in good condition (refer 6 monthly service item 8) 3.
Maintenance Manual MAINTENANCE REPORT Inspection and Maintenance Report for PEFS F3N Vehicle Fire Suppression System Work Order Number: Date: Client Information Customer Name: Contact Name: Customer Address: Telephone: Mobile: Fax: Equipment Information Equipment Type: Equipment Make: Equipment Model: Equipment Serial No.:...
Need help?
Do you have a question about the PEFS F3N and is the answer not in the manual?
Questions and answers