ALTRO Whiterock Installation Guidance

Hand wash station

Advertisement

Quick Links

Altro Whiterock
Making a secure installation
It is essential that the walls, ceilings and floors, provide a
suitable structural finish capable of taking the dynamic and
static loads imposed by the fixings, to support the unit.
Insufficient structural integrity will void guarantees.
The substrates that the mechanical fixings are being fixed
into, should be sound and stable without deflection to
ensure that the fixings retain their integrity and prevent any
movement throughout the units working lifespan.
Particular care should be taken with studwork walls and
suspended ceilings which will usually require the inclusion of
a pattress to sufficiently strengthen the structure.
Poor fixings will compromise performance and could lead to
the failure of the unit.
Ensure that no water or electrical cables are exposed or
showing signs of leakage and that no services are hidden
directly behind the unit, which could be damaged during
the installation.
Installation of this unit should be done by competent trades
people. Installation of the Altro Whiterock hand wash station
is a two person job.
Ensure that appropriate PPE (Personal Protective Equipment)
is worn during the installation process.
The unit should not be installed in a humid or wet
environment.
Installation Guidance
hand wash station
Tools required
Spirit level
Tape measure
Tee square
Cable/pipe detector
Drill bits
Screwdriver
Drill
Pencil
Appropriate wall fixings (not supplied)

Advertisement

loading
Need help?

Need help?

Do you have a question about the Whiterock and is the answer not in the manual?

Questions and answers

Summary of Contents for ALTRO Whiterock

  • Page 1 Installation of this unit should be done by competent trades people. Installation of the Altro Whiterock hand wash station is a two person job. Ensure that appropriate PPE (Personal Protective Equipment) is worn during the installation process.
  • Page 2 If the flooring is to be coved up to the plinth this procedure should be done before the Altro hand wash station is set onto the plinth and attached to the wall. Installing the Altro Whiterock hand wash station Handling the unit is a two person job.
  • Page 3 The Altro Whitlock hand wash station will be delivered Connect traps and waste outlets to the room or with a protective foil covering the Altro Whiterock sheet. building’s soil or waste pipes. Carefully peel back a small section of the protective foil Commission and test the installation of the sanitary where the sanitary ware and taps are to be installed.