Download Print this page
roco 95100 Assembly
roco 95100 Assembly

roco 95100 Assembly

Master repair shop

Advertisement

Quick Links

MASTER REPAIR SHOP
ASSORTMENT ASSEMBLY
ASSEMBLY INSTRUCTIONS FOR THE MASTER REPAIR SHOP ASSORTMENT
#95100

Advertisement

loading
Need help?

Need help?

Do you have a question about the 95100 and is the answer not in the manual?

Questions and answers

Summary of Contents for roco 95100

  • Page 1 MASTER REPAIR SHOP ASSORTMENT ASSEMBLY ASSEMBLY INSTRUCTIONS FOR THE MASTER REPAIR SHOP ASSORTMENT #95100...
  • Page 2 12” Base Hardware (included) • Cabinet Hardware (included) - not pictured. • It’s recommended you construct the #95100 at or near your desired location. Once built this Starter is very heavy and difficult to move. #95100 CONTENTS The MASTER REPAIR SHOP ASSORTMENT is designed to improve organization and storage capabilities of any shop or garage.
  • Page 3 #95100 MASTER REPAIR SHOP ASSORTMENT ASSEMBLY STAGE 1: CONSTRUCT THE BASE The MASTER REPAIR SHOP Assortment Base is lightweight and may be constructed in any desirable location whether on a table or the floor where it wll be stationed. Contents:...
  • Page 4 #95100 MASTER REPAIR SHOP ASSORTMENT ASSEMBLY STAGE 2: ADDING THE 18 DRAWER CABINETS At this point the Base should be fully constructed and placed at or near your desired location. Once Cabinets are added the MASTER REPAIR SHOP Assortment may become very heavy and difficult to move.
  • Page 5 #95100 MASTER REPAIR SHOP ASSORTMENT ASSEMBLY STAGE 2: ADDING THE 18 DRAWER CABINETS CONTINUED STEP 4 - Repeat step 3 for all four holes (shown Left image). STEP 5 - Once Base and first 18 Drawer cabinet are secure, flip them so they are standing right- side up.
  • Page 6 ASSORTMENT ASSEMBLY STAGE 3: ADDING THE 4-DRAWER RACKS & CABINET At this point your #95100 is almost fully constructed and it’s recommended it is in its desired location. Once fully assembled the MASTER REPAIR SHOP Assortment may become very heavy and difficult to move.
  • Page 7 #95100 MASTER REPAIR SHOP ASSORTMENT ASSEMBLY STAGE 3: ADDING THE RACKS & CABINET CONTINUED STEP 4 - There should be four holes that line up between the two 4-Drawer racks (Bottom Left image). Using your hardware, repeate Step 2 for all four holes (Bottom Right image). Once completed, return tray to its place.
  • Page 8 #95100 MASTER REPAIR SHOP ASSORTMENT ASSEMBLY STAGE 3: ADDING THE RACKS & CABINET CONTINUED STEP 9 - Along the side and back walls inside of the Utility Cabinet you will find a series of hooks designed to hold the two included adjustable Shelves in place (Bottom Left image).
  • Page 9 MASTER REPAIR SHOP ASSORTMENT ASSEMBLY #95100 COMPLETED! Congratulations! Your 95100 MASTER REPAIR SHOP Assortment has been assembled and is ready to be loaded up with tools, fasteners, nuts, bolts, and everything you need for a productive day at the shop!

This manual is also suitable for:

Cab-sm2-9618-dMb-40-12base